Dwarkesh Podcast - What will computer chips look like in 2045?

Episode Date: October 22, 2026

I spent two days touring Intel’s most advanced fab and talking to its technical leadership to understand what the chips of the future will look like.A lot of what's coming next – gate-all-around t...ransistors, backside power, CFET, hybrid bonding – is hard to follow without actually seeing it, so we made all the awesome animated explainers that I wish I had while I was prepping.I also asked Intel’s leadership how the semiconductor industry will cope with the enormous shock in demand from AI.AI compute has grown 3x a year for the last decade, but according to Intel's CTO, Intel could only double leading-edge wafer production with today’s global stock of chipmaking tools.What kinds of tricks can foundries pull to extend this crossover point where demand surges way ahead of supply?This was a totally new format for us - hope you enjoy!I also made flashcards for the concepts I had to learn to prep for this episode here.Watch on YouTube; read the transcript.SponsorsWorkOS helps you do business with enterprises. It gives you access to all the features most commonly required by enterprises: SSO, SCIM, RBAC, audit logs, and more. It’s easy to plug these features in — it only takes a few lines of code — and WorkOS is releasing new functionality all the time, including things like auth for agents. If you want to join the 3,000+ companies that rely on WorkOS, go to workos.comJane Street built a powerful tool called magic-trace to help analyze and debug their trading systems. It only exists because one engineer noticed a feature on Intel chips called Processor Trace and thought it’d be valuable to build on top of. Now, traders and developers across Jane Street use magic-trace every single day! If you want to be trusted to pursue the ideas you think matter most, Jane Street is hiring. Go to janestreet.com/dwarkeshAntithesis’ testing platform lets you perfectly reproduce every single bug you find. That’s because it runs on a fully deterministic computer, which strips out all the unpredictability that can make certain bugs flaky and hard to pin down. To build it, Antithesis found every source of non-determinism in Intel’s x86 architecture and either sealed it off or replaced it with a controlled simulation. Learn more at antithesis.com/dwarkeshTimestamps(00:00:00) – Intro(00:00:47) – How Intel brings up a new process node(00:03:22) – What Intel learned from 10nm(00:06:28) – From planar transistors to gate-all-around(00:13:13) – Why High-NA EUV pays off for Intel but not TSMC(00:19:20) – Could chips have evolved completely differently?(00:23:33) – Inside Intel’s “Hot Topics” meeting(00:29:30) – Replacing copper wires with ruthenium(00:32:41) – Why stacked transistors take a decade to ship(00:39:45) – Hybrid bonding and the chip-to-chip bottleneck(00:48:00) – There aren’t enough tools to 10x chip production(00:53:14) – Can Intel catch up to TSMC?(01:01:02) – Terafab, and rethinking the fab from scratch This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit www.dwarkesh.com

Transcript
Discussion (0)
Starting point is 00:00:00 There's never been as big a shock to the semiconductor industry as the current surge in demand from AI. AI is driving incredible computing demand. Easily 40 to 50% above our maximum capacity, which I've never seen before. Progress in AI has been driven by exponentially increasing compute. To sustain that progress, foundries like Intel will need to manufacture far more leading-edge compute, both by producing more chips and by improving what each ship can do. But the production of these ships is bottlenecked by tools that Intel buys from their suppliers.
Starting point is 00:00:31 Most famously, ASML's EUV machines. If they don't have the equipment, they can't make the chips here. I spent two days touring Intel's fabs to prepare for these interviews with its leadership. I wanted to understand what it takes to manufacture the world's most advanced chips and how hardware is shaping the future of AI. Okay, I'm joined by Chris Oth, who leads development of all the processes that are currently under manufacturing. The thing I want to understand in more concrete detail is how the development of a new process
Starting point is 00:00:58 actually happens. So if 14A is going to come out in three years or two years from now, what is happening from now till then? And I want you to walk me through as much detail as you can, everything from like the level of how is the yield improving, what kind of telemetry do you guys look at, what kind of experiments do you guys run? I want to understand what is going to happen over the next two years as concretely as possible. Yeah, and if we talk about 14A, 14A has actually been in development for about three plus years at this stage. And And so quite a bit of free work has been done to get to the stage that it's at right now. And right now we're getting very close to where we're finalizing the process.
Starting point is 00:01:35 We're finalizing the tool sets that it will be manufactured on. And we're working on kind of the fine-tuning of each of the process steps. There's about 2,000 steps in the factory that you have to go do. And you need to do really intricate work at each one of those to make sure it's fine-tuned. It can go into manufacturing. It can run thousands of wafers a week on this process, and it can be repeatable every single time. right now you might have a certain yield. Walk me through how that increases month over month. So there's a line running at 14A. What happens from now till next month that will result in the
Starting point is 00:02:08 yield changing? How do you identify where the defects are? How do you fix that? Yeah, so there's a constant process that we go through in identifying defects. And there's, there's kind of two main ways that we'll identify defects. One is we have inline metrology. So we have tools that will look at the wafers and say, ah, there's a defect there, there's a defect there, And then also at end of line, either eat electrical test or we sort and see where the fails are and we will identify failures and then we will get analysis on those failures. We'll cross-section it. You were in the TEM lab yesterday and you saw how you can get cross-sections. You'll get a cross-section of a defect. And from that you'll be able to say, oh, that defect is between these layers. So it must have come from this section of the flow. Oh, we have inline metrology in that section, which has identified defects. Those are the defects we need to go out. I think what we've learned is that you don't want to do too much innovation in one node. Because the more innovation that you did, the more complex it becomes.
Starting point is 00:03:05 And while that, yeah, you'll be able to get that to work, you need to hit a certain schedule. And that's the schedule that your customer ultimately wants. So having that predictable schedule is a key piece. So you've got to figure out how much innovation you can put in in order to meet the customers' requirements in the timeline that they needed. Intel learned how costly that trade-off can be with delays to its 10 nanometer note. whose original target launch date was 2016, but which didn't begin manufacturing until 2018. You know, usually Intel has been the keeper of Moore's Law, a new cadence of manufacturing every two years. But their last set of products slipped almost four years.
Starting point is 00:03:40 Intel today, having its worst day in four months, stock now down more than 15%. I also want to point out Taiwan Semiconductor up 13% off of Intel's bad news. Bad news. Walk me through what lessons you think Intel has learned from 10 nanometer. 10 nanometer was a good example of where we had very aggressive targets. We were doing what was called hyperscaling at the time, so we were scaling much faster than what had been historically done. In order to do that, we came with all sorts of innovative ideas and how we could achieve that without new tools because the tools weren't ready. And so that put a lot of burden on the process
Starting point is 00:04:24 and a lot of burden on the engineers in order to do that. Now, at the end of the day, 10-8-a-dainters are great technology. It has world-class yield. It is world-class performance. It has world-class cost. But it took us longer to do that
Starting point is 00:04:36 than what we would have liked. And so we've kind of tried to take that learning into future technology nodes and say, hey, we need to limit the amount of innovation we put in there to make sure that we keep it on schedule. What do you think was the main technology that should have been safe for a future version? EUV was probably the big thing.
Starting point is 00:04:53 When we started to define 10 nanometer, what the conclusion was, EUV was not ready. EUVE is extreme ultraviolet lithography. It prints chip patterns with light at a wavelength of 13.5 nanometers, about 14 times shorter than that emitted by previous tools that shipmakers had relied on. The shorter the wavelength,
Starting point is 00:05:14 the finer the features that a single exposure can print. But Intel decided this technology wasn't going to be ready in time. TSM transitioned to EUV much sooner. It put EUV into volume manufacturing in 2019 and ramped it up further on its 5 nanometer node in 2020. Intel's first DOV process did not reach products until 2023, so TSM had about four more years of experience with these machines. So yesterday we were at the research lab and we're getting a preview of 2D materials and CFET and erytheneum interconnects.
Starting point is 00:05:50 And I'm curious about how you decide whether that technology is mature enough for the next node. One thing that did also come out of 10-N is we started to define a set of maturity metrics. And so we use those maturity metrics in a process, which you call phase gate, where we would say to go from pathfinding into development, these are the criteria that we need to go hit. And there's yield criteria, defect, criteria, performance criteria. And we need to hit those in order to move to the next set of the flow. And if there's something that doesn't make that, then it misses that. And it goes on to the next technology, and we focus on the items that are ready and we can run and put into a process. Because one of the key things is to stay on schedule.
Starting point is 00:06:28 Staying on schedule is hard partly because new transistor designs take decades to mature. Modern-trip transistors evolve from the cleaner moss transistor demonstrated in 1960. The history of transistor since has been the progression from two dimensions into three. Each development that Chris goes on to describe, from FinFET to Gate All Around, is a sense. step in that progression. So it'll help to first look at a basic transistor and how its parts have changed over time. A transistor is basically a switch. When it's turned on, it allows current to flow between its two ends, which are called the source and the drain. A piece called a gate sits on top of the silicon between the source and the drain. Applying a positive voltage to
Starting point is 00:07:12 the gate turns the switch on, because the positive voltage pulls negatively charged electrons in the silicon beneath, up towards the gate. However, a thin layer of insulation stops them from actually reaching the gate. So the electrons collect just beneath that insulation and form a thin conducting path from the source to the drain. This is called the channel. Remove the voltage and the electrons disperse, the channel disappears, and the switch turns off.
Starting point is 00:07:41 As transistors shrank, the source in the drain got so close together that current could flow through the channel, even when the switch was supposed to turn. supposed to be off. We needed a better way to control the channel and prevent current from leaking through. The fix was to give the gate a tighter grip on the channel by touching it from more sides. In the original planar transistor, the gate only touches the channel from the top. The fin-fet transistor squeezes the channel into a thin vertical fin of silicon. The gate drapes over the fin, so it controls the channel from three sides. The next progression from there was to cover not only the
Starting point is 00:08:16 top and the sides of the channel, but also the bottom. This technology is called gate all around, and it's sliced in the channel into thin ribbons, each of which gets completely wrapped around by the gate. But getting gate all around to work required new materials and new manufacturing steps. To build these floating ribbons of silicon, you first sandwich them between alternating layers of a temporary placeholder material, which holds the space where the gate will eventually go. We use a placeholder because the materials in the real gate wouldn't survive the processing that comes after, which involves baking the way for at around 1,000 degrees Celsius.
Starting point is 00:08:51 Once these hot steps are done, chip makers etch away the placeholder, leaving the ribbon suspended. Then they fill the gaps around every ribbon with a thin coat of a special insulator called a high-key material, whose purpose is to let the gate pull more strongly on the channel, and then on top of this material, they put the metal of the gate itself. FinFET was demonstrated in the lab in 1989 and reached volume production at Intel, in 2011. A gate all around transistor had been demonstrated a year earlier in 1988,
Starting point is 00:09:23 but Samsung didn't begin producing Gade All Around chips until 2022. So these ideas, FinFET and Gator All Around, were developed around the same time, but they reached production a decade apart. I wanted to ask Chris why it took so long to get to this current Gade All Around technology. Maybe you can walk me through
Starting point is 00:09:40 then the process of getting into high volume manufacturing. I want to understand concretely, once you have an idea that, hey, we're going to make the channel smaller, we're going to surround it, all the other problems of material science and figuring out how to not destroy the gate, how did they actually get figured out? Why does this take so long? Gate around is a good example because back in the 90s, we knew of this idea. But we knew there was going to be these problems on how you put this into high volume manufacturing.
Starting point is 00:10:06 And at the same time, there's other things like high K metal gate, there's strained silicon, there's fin fats that are out there. And so it's kind of like when's the right time to go and tackle those. Well, you don't want to tackle something before you have to. And so if you have these other things that can drive performance, you would go and do that. We went through this path where we did this. We did strain silicon, high K metal gate, we did fin feds. And then it became, well, we need to do things further.
Starting point is 00:10:34 How do we get there? Well, gate all rounds really the ultimate transistor out there. Maybe it's time to go and start tackling some of those issues that you have. And you're right. Now you have to look at how you put high K metal gate in with gate all around. So it's that innovation that takes time. Sometimes it's you need new materials. Sometimes it's you need a different tool in order to be able to do some of the things that you need to go do.
Starting point is 00:10:59 And that requires invention from the tool vendors. You have to go to the tool and say, hey, I need a tool that can do XYZ. I need a gas that can, you know, deposit this particular material that goes into that. I need a heating chuck that has this characteristic to it. All those things take time. And some of it's iterative where you have to run a gate all-round transition. You see, oh, well, that didn't work. Let me figure out what was wrong with my hypothesis and try it again with some different structure.
Starting point is 00:11:28 How has the nature of R&D changed from the era of just making planar transistors smaller and smaller and just getting the benefits of Dinarz scaling to the world we're in today? Is it just a totally different kind of R&D process where previously you were just like, let's make things smaller, smaller, smaller. Now you do look at all these other facets of performance at the same time and improvements in size don't come as easily. Walk me through whether there was some crucial change in the R&D process at that point. If you look at the 80s and 90s, yes, it was driven really by Denard scaling, lithography.
Starting point is 00:11:59 We just make things smaller. Transistors got faster, and they got more reliable. And it was very predictable cadence. When we started to hit 2000s, what we saw was that's not good enough anymore. We need to do something different. And to me, it became this golden age of innovation. For each technology node, how are you going to provide more scaling? How are you going to provide more performance?
Starting point is 00:12:20 And so it drove things like strained silicon. It drove high K metal gates. It drove fin feds. It go gate all around. It drove backside power. These are things that are, you know, were in the 80s and 90s, you would be like, oh, no, we're not touching any of that. Because we just continued out the same process flow. We just scale it, scale it, but that's really for somebody like me who's a transistor,
Starting point is 00:12:40 junkie, it's awesome because now you, you, the playbook's open. You can do all sorts of things out there. You can bring in new materials. I mean, just look at the number of materials we used to use in the 90s versus materials today. It's probably gone up 10x. And there's a lot of innovation. There's atomic layer depositions, you know, I mean, just you're controlling atom by atom this stuff. So it's changed a lot, how you approach the process as to before it was try to not change anything. To now, it's like, take the sledgehammer and start just, just tearing the thing up and come up with some new idea. For 14A, Intel is using a new kind of lithography machine.
Starting point is 00:13:17 High N.A. EUV. It uses the same extreme ultraviolet light as today's UV machines, but changes the optics. NA, or numerical aperture, is a measure of how wide a cone of light that machines mirrors can focus onto the wafer. The wider the cone you can focus, the smaller the spot that your light can carve. Standard EUV machines have an engine.
Starting point is 00:13:40 N.A of 0.33. High N.A widens it to 0.55. So high N.A can print features about 1.7 times smaller in a single pass. When features are smaller than the lithography machine can print, chipmakers have to split the pattern across several passes, each printing a different set of features. The most tightly packed patterns can require two, three, or even four passes. Each additional pass takes up valuable time on a machine that costs around $200 million, and it introduces another opportunity for defects. High-en-a machines cost about twice as much, but they can reduce the number of passes that are needed. So the question, which determines whether they justify their higher price, is how much more time they save and how much they've reduced the risk of defects.
Starting point is 00:14:27 Now you guys are using high-n-A-UV tools, or 14A, whereas TSM has said that they don't make economical sense yet for them. How do you decide whether the next litho tool is the one that is ready to adopt or not? Yeah, and, you know, Hyena is a good example of where because of the architecture of art technology versus TSMs, we make different conclusions off of the same tool set. We use backside power. That means that you actually alleviate some of the pitch requirements you have on the front side and that allows you to print that directly with high and a. TSM has to run very tighter pitches because they don't have backside power and they can't do that with high and A, so they have to use double pattern in EV. So for them it's not very helpful. For us, it is very
Starting point is 00:15:15 helpful. Now at 14, we've left it as an option and it's something that we'll have a discussion with the customer on because there's some value proposition of it. There's some complexity that it adds. Chris is referring to a feature called backside power. A chip has two different kinds of wiring. Power lines deliver electricity to the transistors, and they need to be thick. Signal lines led the transistors talk to each other. They're much thinner, but they need to be spaced apart so that the signal from one wire doesn't interfere with the signal from another. In the past, all of these power lines and signal lines have to be crammed together on top of the
Starting point is 00:15:48 transistors. Intel's newest process moves these power lines below the transistors to the back of the wafer. This frees up space on top, so the signal lines don't have to be packed as tightly. This change makes high N.A worth it for Intel. Without backside power, the wiring is so tight that it would require multiple passes to print, even with high NA. With backside power, a single high NA pass is enough. Outside companies can now commission Intel to manufacture chips that they've designed. They follow Intel's process design kit, or PDK, the menu of what a given process can build and the rules for building it.
Starting point is 00:16:25 Do you need to lock that into your PDK right now for customers who are planning on DevOps? developing on 14A? It's an option in the PDK today, and we're handling it as a customer-by-customer discussion that we have as to whether or not they want to go down that path or not. So for 18A, there's public reporting that there were delays in or issues with the PDK such that some instructions didn't work, and it was difficult for people to use your foundry to build their chips. Tell me about the process of Intel becoming a foundry and then having a PDK that other
Starting point is 00:16:54 customers can use to make whatever chip that they're making as well. There's definitely a learning curve to how you become a foundry, and that's something that our competitors have gone through as well. PDK is a good example of that. For decades, we've been an IDM, and we've gone to our product teams, and we've shown them our transistor data, and we share that data back and forth, and we haven't had a formal PDK-type process.
Starting point is 00:17:15 So that's a new process that we've had to go implement on ATNA. And 18 started out not having a PDK. And so there's definitely a lot of feedback we've got from the customers as to what they expect for quality and maturity of the PDK, what sort of information that they wanna see in there. And so we've tried to incorporate that into making sure that, hey, we have a PDK
Starting point is 00:17:36 that meets our customers requirements. And I think that's where we've ended up is that we're starting to get PDKs that have this. And 14A will have that from the get go. It has very high quality PDKs again. There's maturity metrics for what is a PDK.5 versus a dot nine versus a 1.0. And we're constantly going through
Starting point is 00:17:55 and taking customer feedback and incorporating that into the quality of our PDPDK. For most of its history, Intel's fabs made only Intel's chips. That could be part of what allowed TSM to gain an edge. Serving many customers gave TSM more waferes to learn from, more revenue to reinvest, and more pressure to hit deadlines. Basically, all enterprise customers have a shared set of product requirements that you have to meet if you want to even start talking about doing business with them.
Starting point is 00:18:22 These are things like SSO, so employees can log into your app with their company accounts, or directory sync so that whenever someone leaves, their access gets shot off automatically. These features are harder to get right than you think, and the risk of reward for building them in-house doesn't really make sense. A slightly better version of SSO probably won't accelerate your growth, but a broken one will definitely stunt it.
Starting point is 00:18:43 WorkOS gives you access to battle-tested versions of all the most common enterprise features, things like SSO, SCIM, R-back, audit logs, and more. WorkOS also has versions of these features that are purpose-built for agents, so they can log in, grab the right permissions, and take actions within your product. All of these features can be plugged in with just a few lines of code. So you can add them and get started selling to enterprises. Open AI, Anthropic, and thinking machines, as well as more than 3,000 other companies all rely on WorkOS to meet their enterprise requirements.
Starting point is 00:19:15 If you want to join them, go to WorkOS.com and tell them that I sent you. If a butterfly flapped its wings in the 60s, could you imagine a world where Gated All Around is not even a people have heard overnight, yet people are familiar with, but people are thinking of an extremely different branch of the tech tree. And how far down the tech tree do you think things could be totally different? Could it be like we're not even using copper? If you look at, say, transistors and interconnects, I think where we've gotten to, you know, as far as the transistor and gate all around and it being the ideal transistor structure that I have, I think, was somewhat inevitable, as I said, in the 90s, we were already talking about these type of things. Backside power, that one's pretty out there.
Starting point is 00:19:54 I think even in the 90s, the idea that you're going to strip off the entire silicon substrate and put lines on the back sack side, you know, that one is probably, you know, something that's a little bit out there. Copper, of course, copper wires are the best, so I don't know how you would end up somewhere else besides copper. But you guys are kind of variable. I think for some of the very tightest pitches, you know, I think it's inevitable that you will replace copper. And so that's a good example of where you will have another material that will come in there. but for the larger lines, I think copper is about where it's at. I think that once you start to do gate all-around transistors and you do backside power,
Starting point is 00:20:33 now you start to enter a very different regime because now you see, it's not, hey, there's just some substrate and you stack everything on top. Now you've got a transistor, which is floating and interconnect. And you're like, okay, well, why don't I have transistors, interconnect, more transistors, more interconnected, you know, this whole 3D stacking that we now do with just discrete chips that we stack on top of each other. Now you're like, why can I just build an
Starting point is 00:20:57 entire structure like this? You see it with, you know, memory, NAND, DRAM, you know, they have some incredible 3D structures. NAND already does it. DRAM talks about it, but I think that DRAM and it inevitably is going to go there too. So a lot of people say, oh, no, we're not going to do this because, hey, we can't do it in the next five years. Well, come on. Let's put a larger time scale on this. Let's put 10 years, 20 years in 20, 45. Do you think you could do it? And now you start to say, oh, yeah, I could see us having some pretty exotic structures at that point. So we limit ourselves by what we see as possible in the next four years because, you know, as I've always said, you know, when people say, hey, you know, how do you see technology scaling going? Yeah, we have visibility about four years.
Starting point is 00:21:38 And then you get out to that four years and you go, yeah, I think there's something we can do another four years out of that. And then you get to that four years and you're like, yeah, I think you can do something. But if you start to talk about 10 years, yeah, it becomes hard to say what it's going to be. Chris's idea of building upwards could start with the transistors themselves. Chips use two types of transistors called N-type and P-type, which work the same way but with the charges reversed. Nearly every circuit is built by pairing them up. Today, chipmakers build them side by side.
Starting point is 00:22:06 The next step is to stack them directly on top of each other in order to save space. In principle, that fits twice as many transistors into the same area. This design is called a C-FET, short for complementary field-effect transistor. But every extra layer adds manufacturing steps and costs and also leads to heat building up that doesn't have a clear way to escape. Because logic consumes more power than memory, you can't do stacks of DRAM that make HBM or, you know, 3D NAND as easily with logic because of the heat issue. Is that the fundamental issue then over the long run? Is how you both the thermals? So there's three things that you have when you try to say, hey, what limits compute?
Starting point is 00:22:48 Okay, it's how fast can you do the switch? Yeah. So the frequency of the device. How much power does it take in order to do that switch? So the power efficiency of it. And the second one is how do you dissipate the heat that was generated by doing that switch? And that's the thermals piece of it. And I think the thermals pieces, and these are not new problems.
Starting point is 00:23:07 You can go back 20 years and you can see articles on these three things. And so the question is, yeah, thermals, how do you deal with that? Particularly when you start to talk about these 3D type devices, I think that there is a need for that sort of system level analysis and simulation tools. I think we're at its infancy because we've just started to look at this. But it is a limiter and it will be a limiter. But, you know, again, these are problems that we can go solve. The problems respond to work.
Starting point is 00:23:35 But engineering time is finite and so are the way for experiments. And deciding where they go across thousands of problems is itself one of the hardest parts of bringing up a note. I sat in on one of Intel's Hot Topics meetings, where those are decisions get made. Okay, I'm here with Kevin Fisher, who was laying down the law this morning at the Hot Topics meeting where you guys were discussing how you're improving 18 and 18 AP technologies. And people would come to you with these different experiments they were running, different ideas they had for improving yield and improving performance. And then you and your
Starting point is 00:24:06 integration engineers would tell them what data you needed, tell them how they should proceed, tell them how you think could move things faster. I want people to have a sense of the culture at these meetings. So, one thing that I found striking is just that there's, you know, this is bottlenecking your most advanced node. You want to progress to happen fast. And so you kind of lay down the hammer. I would say the average engineer doesn't understand the stakes or the urgency of how this is going to impact, you know, Intel's bottom line, how it's going to impact our customer. They just have no visibility to those issues, right? So they will typically have, a certain set of criteria that they want to go capture,
Starting point is 00:24:52 they'll hit boundaries of, you know, I asked for something and someone said no. And, you know, I'm done. I can't, I guess I can't have this thing that I asked for. One thing you learn in this industry is that you will never have a complete data set. If you want to wait for a complete data set, you've waited too long. It's already too late. So a lot of what I end up doing in those meetings is I,
Starting point is 00:25:16 I decide how much risk we're going to take on a certain decision or not take on a certain decision. And you need to say, look, do we go now? Do we start risking production? Because you're risking, you know, the bottom line. You're risking revenue. I'm worried you're going to put me in the light of being an ogre because I'm putting the hammer down on it.
Starting point is 00:25:37 That's a great reputation to have. It's really conveying urgency. Yes. Every day counts. Yeah. Can you walk me through a particular issue that might come up? One of the examples you saw this morning, which is epi nodules. Epi is short for epitaxi, which means growing new material on top of an existing one.
Starting point is 00:25:56 Chipmakers flow gases over a heated wafer, and the gases leave atoms on its surface. The crystal structure of the material underneath acts as a template. Each new atom lines up with the atoms below it, and the new layer continues the same crystal. Chipmakers use epitaxi at several stages of making a chip. In the step Kevin describes, the user to grow up. the source and the drain as small crystals on either side of the gate. So during the deposition of our epitaxia, we get abnormal growth, like a tumor, right? It's going super fast.
Starting point is 00:26:28 And that causes problems because one epi will short to the wrong epi, and you get transistors not working. And then you've got to narrow it down to how are you going to fix it? For the past decade, Intel's chips have had this feature called processor trace. When you turn it on, it starts recording all the code your program runs. and it captures enough detail, they can go back later and reconstruct every single function call. Most companies don't need that level of detail. But Jane Street does. They need to investigate specific fleeting moments in their trading systems, things like a delayed response to a network
Starting point is 00:27:01 packet. Those events tend to be too brief for most debugging tools to catch. So when one of Jane Street's engineers noticed processor trace, he started playing around with it. And then he and a summer intern turned that exploration into a new tool called Magic Trace. Magic Trace leverages the output from processor Trace to give Jane Street a history of every function call leading up to a specific moment of interest. This project was completely bottoms up. It started just as something that one engineer thought would be valuable. And now, traders and developers across Jane Street use Magic Trace every single day. If you want to work somewhere where you're trusted to pursue the ideas that you think matter most,
Starting point is 00:27:38 Jane Street is hiring researchers and engineers. Go to janestreet.com slash Thoracash to learn more. One of the pieces that you observed this morning was a special clean that we were looking at, which would eliminate the nodule, right? So the nodule would deposit, and then we'd get rid of it. Some of the other discussion was, well, the source of the nodule, get rid of the source of the nodule, right? So how do you decide what... There's some issue.
Starting point is 00:28:03 How do you decide what the source of it is? For the most part, we work highly parallel, right? So how do you decide? It's not always evident what the easiest way to fix the problem is. So you work on all the potential fixes. And sometimes it's not the one you expect first. Once we've identified it as a primary problem for the technology, that's where this Hot Topics meeting gets involved.
Starting point is 00:28:26 And that's how we align the resources into those engineering teams so that we can accelerate the work. You said there's some fast-strike process where waferers can move through faster if they're bottlenecking some experiment. So we have a tiered system of what we call hot boxes in the factory. and every grade of Hotbox goes a little bit faster, and it's just how the factory prioritizes that particular lot, that block of silicon that's running through the factory.
Starting point is 00:28:54 So our highest grade of Hotbox, Hotbox 1 races through the factory. It gets priority at every single tool, but it's a drag on the entire factory. If you had a factory person in here, they don't like playing that card because you're ending up using the tools inefficiently. that you can go super, super fast. Think of it as a highway and you set aside that one lane for the carpool, which everyone could use,
Starting point is 00:29:21 but you're saying, okay, it's just a carpool. That's our Hotbox one. Yeah. Right? Everyone clear out of that lane except for that one experiment. And that one experiment races down the highway. Kevin's job is deciding what goes on the production line now. But the day before, I went to Intel's research lab
Starting point is 00:29:36 with Jack Cavalierros to see ideas that aren't ready for the node yet. We started with wiring. A transistor is only useful once it's connected to others. And on a modern chip, that takes more than a dozen layers of metal wires stacked above the transistors called interconnect. These wires are made of copper. And as they shrink, copper starts to run into trouble. Intel is exploring a replacement, ruthenium. Ruthenium has higher resistivity.
Starting point is 00:30:02 So why are you guys exploring ruthenium for the future? So interestingly enough, as you scale the dimensions of those copper wires, you run into challenges. For example, copper requires typically a liner in order to deposit the copper to fill those lines. Ruthenium is very different in that regard because it's a material that we can actually etch. And as such, by etching it, we don't need that liner. So now you scale those very fine dimensions. And if you can trade off that resistive liner with no liner, Ruthenium starts to win.
Starting point is 00:30:37 So there is a crossover point that ruthenium will have much better conduct. productivity, better resistivity than copper. And that's roughly in the 20 nanometer pitch range, which means if you can imagine half of the pitches, your metal line, and the other half is the dielectric that isolates. So what is the liner? The liner is, think of it almost like a glue layer, a transition layer that we need in order to deposit the copper and have it stick and make that connection to the copper lines below it. These are all interlocking copper lines that interconnect to each other. But every time you deposit copper, you've always had a liner underneath it. And in the past, that liner may have been a significant portion of the entirety of that conduction path.
Starting point is 00:31:21 But over time, we've scaled it, made it thinner, and so copper comes back into play as a contender. One of the curious about what to know is how you decide that a technology is mature and ready for high-volume manufacturing. So with 10-9mm, you're mentioning you guys moved down from copper to clean. cobalt and there were potential issues with that, how do you decide that this technology is going to work at scale? So the integration of these materials into such a complex system as the transistor ecosystem involves many, many different components. The scalability is one part, but its ability to integrate is another. At the time we made a decision for cobalt, it was the forerunner. The results were stronger at the time. But as we worked with our ecosystem externally, the vendor ecosystem that
Starting point is 00:32:08 provides these materials and the tools that we integrate them with, we find solutions down the road that may bring copper back in line as being the stronger of the two. And that's exactly what happens. Every technology that we go through, we will evaluate multiple options. And as we get closer to our time horizon for delivering a manufacturing worthy product, we have to make a decision. And the leading option at the time was cobalt. Now it's copper again. And perhaps in the future it'll be a ruthinium. I'd love to get your thoughts on C-PET, basically stacking the transistors on top of each other.
Starting point is 00:32:48 What is progress like there? Can you keep making more and more layers? Is it just two? Can we go three, four? How high can you get? Yeah. So that evaluation of C-FET is currently underway. Not just by us, by our competition.
Starting point is 00:33:02 labs externally are looking at it. It is the ultimate in stackability. We're taking transistors that had to be compressed more and more, and we're relaxing that in some ways, because we're going to stack them on top of each other. But the act of stacking does not mean that they're not interconnected. What used to be connections on the top or even on the bottom, as you've seen from our press release,
Starting point is 00:33:23 now has to go vertically in between the transistors. And that's a new challenge, because the aspect ratio of creating trenches and filling those trenches becomes more and more difficult. So it's not as straightforward as stacking the transistors because you still have to think about interconnecting them. Is the issue there the etch to get that deep hole? Aspect ratio for the edges is a big part of it.
Starting point is 00:33:45 We're working with our vendors to evolve on that. But it's also what you fill those very tiny spaces with because filling can sometimes leave air gaps or holes that never really fill. And that's not ideal. I assume there's a version of C-FET that works inside this lab. What is the kind of wafer or process or whatever that it's working right now? Then what's the next step? What's the next step?
Starting point is 00:34:07 What's the next step? Until it's inside the full high volume process. Part of the process of evolving these technologies, especially something more complex like an architecture, not just a basic chemistry or a material, but a full architecture like CFET, is that we have to make short-loop vehicles that can give us faster turnaround.
Starting point is 00:34:28 The normal manufacturing process can take a month or longer to complete the thousands of steps that it goes through. Our goal here is to take unit cells of that process and qualify them. So we take advantage of short-loop vehicles that can give us, you know, electrical parameters, chemical parameters that can resolve some of those challenges, those speed bumps. And once we've resolved them, then we combine them into a more complex test vehicle. So what you would find in here is something very simple. You might be making a diode. You might be making a capacitor, which are components of the transistor. And as those evolve and become stronger, better performing, you combine them to make the next stage,
Starting point is 00:35:15 which might be the transistor itself. So in the CFED example, you might not choose to do four ribbons on top of four ribbons, you might just choose to do one-on-one, because naturally the aspect ratio of dealing with something that much taller becomes more and more challenging. So we would have a simplified version of a CFET, which has only one wire for the N-MOS and one wire for the P-MOS, and that simplifies our job, but it still helps us evaluate the stacking of devices and how they will interconnect. Are the feature sizes here as small as they will be eventually, or are the feature sizes Oh, absolutely. In some cases, at least this small. For example, you know, you've heard of 2D materials, these transition layer dichot collagenides as they're called. They're very, very thin materials. They're essentially one monolayer of atoms that we deal with. Those depositions can happen in this lab. We can evaluate those films in terms of conductivity, our ability to contact them, our ability to modulate that conductivity, which is what the transistor does.
Starting point is 00:36:21 So, yes, we do have the ability to not only deposit films that are very small and thin to the atomic scale, but also print very small features. We have EUV technology that can, or eBine technology that can allow us to print very small features similar to what we will eventually make in production. So I guess I don't understand intuitively lacking the context in this process. why that you have the features that are as small for working CFET right now. Yes. Why will it take 10 years for it to be in my phone? I understand it is like a process, but why is it such a long process? The answer is slightly different when you're dealing with an architecture like CFET versus a novel material.
Starting point is 00:37:11 Materials have, of course, the challenges of being deposited, etched, removed, their compatibility with other layers above and below, all those things have to be researched first before you put them in a production line. An architecture may seem like a simple evolution. Oh, you're making nanorubin transistors next to each other. What's wrong with just stacking them? But the act of stacking them, of course, increases the aspect ratio for edges, depositions, cleans, and the technology may simply not be ready yet. But if you've already made it here, there's a version of the technology that's ready, right? Correct.
Starting point is 00:37:49 So we've made a simplified version that may not be an advantage over our current planar side-by-side technology of nanoribbons, but we need to evolve it to make it maybe two nanoribbons or to add the right type of metals and dielectrics in order to extract the maximum performance out of that device. Got it. Okay. So it's like a long tail of... There's a thousand different steps that all have to come together in a very... unique way to make the performance compatible or actually supersede the prior technology.
Starting point is 00:38:22 Where do the ideas tend to fail? So you have like 20 ideas that are like 2D materials. What is the kind of way in which you're like this is actually not worth pursuing further? Sometimes the idea becomes something that we discover fundamentals about the material that will be incompatible with the rest of the processing that we do. At first, you know, the first level of experiments may simply be very simple depositions and you say, okay, I can deposit the film, I can look at it, I can measure it, but the moment I try to make a contact to it, nothing sticks. It could be something fundamental as simple as the adhesion of the next step in the process
Starting point is 00:39:02 simply has no way to adhere to the material. So you may rule out a material because of something as simple as that. more complex challenges might be the subsequent processing may have gaseous interactions with downstream steps. So for example, I've deposited the film, I've capped it with other materials, but they're not hermetic. And so my third or fourth or fifth step in the process may actually still interact with it and change its properties. That makes it unstable, and now we have to find better hermetic sealing for that process. and if you don't find a way to control it, then it's a dead end for us. Stacking Transistors is still in the research lab.
Starting point is 00:39:48 Stacking whole chips is already in production, and it tackles a different problem, how separate chips communicate with each other. Modern computers are divided into multiple parts, each optimized for a different task. For example, Nvidia's Blackwell Data Center GPU joins two huge processor chips
Starting point is 00:40:04 and surrounds them with eight stacks of high bandwidth memory. These chips have to constantly, to send data back and forth with each other, and in AI, the speed of that traffic, not the raw computation itself, is often what limits how fast the workload finishes. Imagine two chips side by side, communicating through their facing edges. If you double each chip's width and length, you'd have four times the area for circuitry, but only twice the edge length for connections. This is the area versus perimeter problem.
Starting point is 00:40:33 As transistors become denser, a chip's ability to do computations increases faster than its ability to move data around. The industry has known about this problem for years, so multiple technologies have been invented to address it. The completed circuits must undergo two last operations, bonding and packaging. Once the ship is made, it still has to be connected to other chips and to the rest of the computer.
Starting point is 00:40:56 That step is called packaging, and it has changed a lot in the last few decades. At a high level, you can think of the evolution of packaging like this. Initially, chips were laid out side by side. Wires connecting them went out the side of one ship, to another. To allow for more communication density, the industry introduced a shared piece of silicon, called an interposer, for multiple chips to sit on. A chip can talk to other chips through the wiring that runs directly through the interposer. This type of packaging is often called 2.5D. Another way to increase connection density is to bond chips directly to one another. This allows for shorter
Starting point is 00:41:31 connections between chips, but the early versions of this idea use solder bumps, which are bulky and increase resistance. It would be better to skip the solder and fuse the signal wire connections of the two chips directly to each other. This is called hybrid bonding, and it is one of the technologies the semiconductor industry is investing in the most.
Starting point is 00:41:51 Hybrid bonding works by aligning the copper interconnects of one chip with those of another. Then these chips are pushed together and heated so their interconnects expand and bridge the gap between the chips. This process makes the insulating surfaces around the copper bond as well. And so by removing the solder bumps, you end up with much denser connections.
Starting point is 00:42:08 But the reason this technology is only now entering volume manufacturing is because it took a while to iron out the alignment and defect challenges that it introduced. In the packaging lab, I asked Tyler Osborne, a director in Intel's Advanced Packaging Technology Development Group, how they put this into practice. Intel has spent over 50 years optimizing its CPUs for speed, but lots of these optimizations like cache and branch prediction and speculative execution reduce predictability.
Starting point is 00:42:34 The exact same instructions can take four cycles of speed, to execute one time and 300 the next. When you stack billions of instructions together and execute them across multiple threads in course, these non-determinisms compound into all sorts of hard-to-reproduce bugs. If you work on serial systems, you've definitely experienced this. Antithesis solved this by doing something a bit crazy. They built a 100% deterministic computer. They identified every single door in Intel's x86 architecture where non-determinism could leak in.
Starting point is 00:43:04 network packets, discreet's, temperature sensors, even time itself. And they either welded each of these shut or slotted in a controlled simulation. This deterministic computer is just a foundation. On top of it, antithesis built a testing platform that compresses years of production hardening into minutes and runs your software through thousands of parallel worlds, injecting faults and intelligently steering each one towards a one-in-a-billion failure that you'd never be able to test yourself. This determinism is what's behind all the other insane antithesis features that,
Starting point is 00:43:33 I've mentioned over the past few episodes. It's what lets you reproduce any bug and time travel to any point in the test front. Most importantly, it's what lets you or your agents trace every failure back to its root cause. Go to antithesis.com slash Thor Cash to learn more. Two different ways you could do hybrid bonding is die to die, then died to wafer.
Starting point is 00:43:58 And maybe you can talk about the advantages of both and which one actually practically works better. Sure, so actually around Intel, typically, I think as you're referring, who die to die, we typically call it wafer to wafer. So we actually take a full wafer and another wafer and bond them together. That's an approach that's really popular right now in the Seymoss image sensor industry. In fact, basically dominates it.
Starting point is 00:44:18 And it's being looked at for other things like memory stacking, all kinds of stuff people have published ideas about. One of the challenges with that, though, is that you need dyes that perfectly match each other and are perfectly like left-handed and right-handed, right? So you have to be able to plon exactly one to the other. So one-to-one dye size is a challenge. So if they're not the exact same design device on top and bottom, that's a problem. So wafer to wafer, it's just challenging to make sure that you have wafers that match really well in terms of the sort, right?
Starting point is 00:44:45 So sort good array here versus sort good array here. If they match exactly good dye and bad dye that they all match, I can get 100% yield of that operation of the good dies, but the chances of that are very low. It's going to be some randomization of the two. And whatever that randomization is, it's just going to be loss of good batting-bondon. to bad. Whereas it chipped a wafer, I can dictate the terms, right? I can singulate and have known good dyes that I've tested at the chip level, and then only bond known good to a known good base position. Do you think then chipped a wafer is the way that you'll do hybrid bonding
Starting point is 00:45:18 in the future? I think we're going to do both. We definitely have the capability to do both. It's really customer and architecture driven, but certainly chipped a wafer in the logic to logic space makes a lot of sense. So you were explaining that going from advanced packaging to hybrid bonding, the size of the pitches is decreasing. How much further could that go? That's a wonderful question. So, you know, historically, like we were saying, 15 years ago, first level Interconnect was 130, 150 micrometer pitch. Today in HVM we're doing 25 micrometer pitch in Foboros. Here we're doing sub 10, but there's already been literature out there. In fact, the biggest conference every year in packaging is the ICCC-C conference that happens in May. And there was a paper there this year
Starting point is 00:46:00 showing reliability data on a 0.45 micron pitch hybrid bonded device. So you can imagine that's a whole other order of magnitude and density again from where we are right now on HBI and scalability that's already been proven. So I see a long runway there. Within interconnect, within a single wafar, how far separated are they usually? So the back end of the fab, you can imagine, like the few layers below packaging are typically around one micron to a half micron in size. So if you can push packaging down to 0.5 microns or below, we can start, you can almost think about taking layers off the top of the dye and connecting to a lower layer within the silicon to another lower layer within the silicon, right? That's really kind of where the beauty of hybrid bonding happens.
Starting point is 00:46:49 You can think someday about even having reduced interconnect layers on both sides that we can bond together and have less total, you know, IR drop between the two transistor layers. It's really kind of cool to think about where that could go once we get into those regimes. Actually, I am very curious about where AI, it makes sense why hyperbonding is so powerful because then you can get like higher bandwidth of the memory. Absolutely. You're saying with issues with heat and everything, what is the advantage for non-AI applications of hybrid bonding?
Starting point is 00:47:17 Excellent question. So there are companies out there that are looking at it for non-AI applications, even in fact in client devices, right? And one of the big things I think that that can help with there is, well, number one, obviously the same raw interconnect density, especially between something like a CPU and a GPU. But the other one is around power, right? So like we talked about before,
Starting point is 00:47:39 is you get to find and finer interconnects. You can reduce the total power consumption in picojoules per bit for that interface. So with hybrid bonding in those applications, you could think about that is another way that package you can help reduce the total system power budget. Interesting. So then that gives you lots of benefits, right?
Starting point is 00:47:55 Lower power, less heat, for the same benefit in terms of actual electrical performance. So far, this has been about making better chips. The other half of the question is how many ships the industry can make if AI labs are willing to pay for far more of them. I'm getting a chance to talk to Pushkar-Rande, who is the CTO of Intel. I'm very interested in understanding how the fact that the entire industry has to rely on the same suppliers, bottlenecks your ability to ramp up production. So for this EUV tool, ASML produces less than 100 of them a year.
Starting point is 00:48:26 And they don't plan to produce more than 100 a year, even by the end of the decade, or significantly more than 100 year. And that is to be split between you, between TSM, between all the memory makers or ramping up production like Ski-Hinex. How does that limit your ability to scale up to all this demand? It is a limiter. So we have to make the most of the capacity that we already have installed, and we'll try to increase the output from our existing fleet of tools. And UV or ASML is not the only bottleneck.
Starting point is 00:48:54 It is definitely a bigger bottleneck than some of the other tools. But to a large extent, we're seeing all equipment seeing tremendous supply shortage. Even though there are multiple providers of other tools, you know, once you lock into a process flow, let's say 18A, right? 18A is a mature process now. So we need a specific tool. We can't just go and get a different tool for the same. So therefore, we're locked into that one tool, one supplier. And so we rely on that.
Starting point is 00:49:31 What lessons does this give for 14A in terms of by 2008, it's going to be such a crazy world? Yes. How do you structure things in such a way that you have flexibility in ramping? Actually, the way to do it, and we've been doing it, and generally everybody does it, is you try to maintain as much fungibility as possible, going from one note to, the next node. So let's say going from 18A to 14A, maybe you would say 80% of the tool set can be reused. And then of course 14A, for example, would require some new capabilities because it's a denser geometry. So it would require some unique tools.
Starting point is 00:50:03 Do you have a sense of what is the ultimate bottleneck of how many wafer you guys could produce a month, even if you were decided to invest infinity money into doing CAPEX? Given the existing constraints, let's say we had to max the output from a given footprint of tools, then I think it's incremental because the process today is already yielding pretty high. And to get, you know, if you yield is already pretty high, to get every 1% extra yield is extremely hard
Starting point is 00:50:34 because it's already a finely tuned process. Are there enough tools in the world that's so you could 10x the amount of wafer as you're producing at the leading edge? Not 10x, but probably like 2x, yes. That's quite interesting because the AI industry AI industry for a decade has been 3X in compute. Yes.
Starting point is 00:50:51 Year over year? Yes. And you're saying that that just can't continue. Unless the entire supply chain, starting from, you know, the equipment suppliers, their suppliers, their sub-suppliers, unless everybody produces more, you can't increase the output collectively. Just to give the audience a sense of how big the AI demand is and how well it monetizes the products you guys are producing, you can crunch the number.
Starting point is 00:51:16 And the numbers seems to suggest that just a couple billion dollars of CapEx on Intel's account results in enough chips or the logic for enough chips to produce, say, $100 billion of revenue for the A model companies. And of course, there's so many other players within that stack. There's also memory and other things. But it's crazy that within a couple billion dollars of CAPEX, which can be amortized over many different years, produces $100 billion of revenue every single year. Yes. Which seems to suggest that at some point that should percolate down and there should be some, you know, at some point the AI labs could just say, we'll just buy everything, produce as much as you can, we'll just guarantee future income streams and stuff. There's early signs that that could actually be happening already. The demand signals are just so high. But I thought you, I think you were alluding to how the value is accumulating at the top of the technology stack. Yeah. Which is, which is essentially what is happening is, You know, we move from a fully vertically integrated industry, like 30, 40 years ago, maybe longer, to a very horizontal industry, right?
Starting point is 00:52:24 Where, you know, you have foundries, you have equipment makers, you have, you know, their suppliers. And today you think about it, every hyper-scaler is designing their own chips. And the scale of the hyperscalers is so large. And some of the, you know, the model companies, for example, and their demand is so high. they could easily just like consume an entire fabs worth of silicon on their own or or multiple fabs worth of silicon on their own and they definitely have the the capital to fund that so in some sense we are moving from a sort of a horizontal world again to a pseudo vertical world where it's like the you know it's it's it's not monolithically vertically integrated but it's kind of vertically
Starting point is 00:53:11 virtually vertically integrated. Interesting. What is the nature of economies of skill in this business where you look at how many waivers of the leading edge TSM versus Intel are shipping upwards of 3X for TSM? What kinds of advantages do you get at this point from economies of skill?
Starting point is 00:53:32 Or is it that once we reach a certain point, the economies of the scale get weaker? That's a very important question. This entire business is just relies on scale and economies of scale. I mean, if you look at sort of all the advanced manufacturing companies out there, probably semiconductor foundries, the scale economics is probably the purest. And the reason for that is the fixed cost is just so incredibly high that once you build
Starting point is 00:54:02 a fab, like 80% of your cost structure is fixed. And so what that means is every extra percentage of utilization is, is, you know, adding far more in sort of in revenue. So therefore, it's extremely important. And we'll fight for every extra percent of fab utilization, but also every extra percentage of fab output, as in, you know, let's say I'm making some wafers today, and the yield is like 60%.
Starting point is 00:54:30 But if I improve the process and the die yield becomes 65% or 70%, it's not a linear advantage. It's like I'm getting way more output for the given footprint, right? So there's always room to improve the economies of scale. And that's one of the reasons why you're seeing so much consolidation in this business, right? There's only three foundries left at the advance note for that exact reason. And just along the way, many companies just stop manufacturing. I don't know if you've seen there's a chart where like 40 years ago there were like 20 foundries.
Starting point is 00:55:10 and over time, like, the number of foundries kept diminishing until today there's only three. What is basically then the concrete master plan to catch up to TSM? Even though TSM is ahead, there's so much overflow demand of their leading edge. Absolutely. Where N3 is now a majority AI accelerators, maybe majority of NVIDIA alone,
Starting point is 00:55:29 that all this demand for CPUs, for other things, which are also, by the way, needed for AI. This humongous influx in demand for CPUs because of AI. How do you see this opportunity right now where Intel's a few years before while TSM is just way over saturated. Catching up to TSMC has maybe has multiple facets. I would say the catch up that we need to do is in scale. You know, like you said, they're just a much larger way for manufacturer today than we are,
Starting point is 00:55:58 and even bigger than what Samsung is. Caching up in scale will be a slow process, a gradual process. if you meant, you know, catch up in terms of just the technology, I think that, you know, I think we're already there. Like, you know, we might maybe, you know, a few percent off on performance or power or area density. But, you know, this sort of benchmarking of, you know, one foundries ahead or one foundry's behind, it makes sense when you're like a whole generation behind or two generations behind or ahead.
Starting point is 00:56:44 That's when it makes a meaningful difference in your dye output or your, you know, dye area or functionality like power. But if you're within like a few percent, it's really, it's really you're splitting hairs at that time, at that point in time because it's it's not very unidimensional at this point. It's not just about density. It's not just about raw performance. Different applications require different vectors. So, you know, you can be off by a few percent, but you need to be on time. Your execution needs to be such that your yields are very high to support very large and very rapid ramps. So that actually is more important than, you know, catching up on a few percent in performance or area. I was looking at some semi-analysis,
Starting point is 00:57:34 that seem to suggest that in terms of transistor density, 14A will actually be, which will come out in like 2028, would you be comparable to N2? Yeah, first of all, I would dispute your benchmarking. But like I said, I think, you know, it's important to be generally in the right ballpark, be very predictable, and also, you know, it's not unidimensional in terms of, you know,
Starting point is 00:58:00 we don't build one type of transistor, let's say 14A or 188, you build a few different types of transistors. Let's say there's a low leakage transistor, there's a high-performance, high-drive current transistor. You're building S-RAMs. There's a high-density S-RAM. There's a high-performance S-RM.
Starting point is 00:58:18 There's many other functionalities, like some analog circuits, RF circuits. So it's the sum of all of those that makes a technology competitive. I guess that makes the KAPEX you do right now even more important. So right now, or like TSMC's on. on track to do 50 billion in CAPEX, around 50 billion in CAPEX this year, you're on track
Starting point is 00:58:38 to do around 20 billion. Yes. But if the tools you're buying right now will determine who can service all this crazy AI demand that's coming up, it makes the CAPEX right now, the difference in CAPEX is even more important for like US versus other countries. Yes, very much. It's a little bit of an unfair comparison between us and TSMC today, just because today they're a foundry for basically everybody, and we're largely a foundry for
Starting point is 00:59:04 Intel will become a foundry for others. So in due course, our CAPEX will also grow. Intel started as a DRM business in the late 60s, and then you guys are producing DRAM, which you sold off. A couple years ago, you sold off your Flash business. Yes.
Starting point is 00:59:24 Yeah, thoughts on that. For context with the audience, these are now multi-trillion dollar industries because they've just exploded as a result of of AI demand for them. Yes. I mean, clearly, in hindsight, probably not the smartest time
Starting point is 00:59:40 to sell off a flash memory business. There were good reasons why we did that when we did. Clearly, you know, nobody could see this, this demand, this enormous demand. But no, today, I think, I mean, essentially, the world will eat up as much compute as can possibly be made. And it'll eat up as much memory. as can possibly be made.
Starting point is 01:00:05 I would argue that the supply crunch is larger for memory today than it is for compute. So can I summarize what it seems to me the takeaways from your projections are, and you can tell me if that's correct. Yes. Marginal production can increase actually very fast, you know, on the scale of 12 months,
Starting point is 01:00:22 but the amount of increase up until the end of the decade is extremely limited. Yes. Production could be higher next year than what people are forecasting, but production in 2030 is not going to be significantly higher than what people are forecasting. Unless the entire supply chain ramps,
Starting point is 01:00:34 sub-production very quickly. I mean, we're already in the middle of 26. So there's, you know, only not that many years until the end of the decade. And given the lead times, you know, let's say you place an enormous order for tools today, right? And you're looking at, let's say, 18 months to get those tools. You're already into basically 28. And from that point on, if you have to build a new shell, build a new fab, I mean, you're basically looking at the end of the decade. I think it'll be interesting to discuss the, um, partnership you guys have with Elon on TerraFab. Hmm. What's going on there?
Starting point is 01:01:10 Well, I think, so Elon's publicly talked about his desire to build a fab. We either build the TerraFab, or we don't have the chips. And we need the chips, so we're going to build a tariffab. Sort of the same thinking, you know. I think he's
Starting point is 01:01:26 seeing just an enormous increase in demand for silicon, for compute and for memory. And, and And I think he came to the conclusion that his own businesses are going to require a lot of silicon. And so he thought maybe he should just do it all on his own. Unlike building a car, for example, this is such an intricate and complicated process. We thought we could work together to help accelerate his bringing up his fab.
Starting point is 01:01:58 But because of the bottleneck at the tool level, it seems like the net amount of silicon in the world won't increase. It's just that maybe if somebody were to start a new fab, they would get access to guaranteed supply in a way that they wouldn't have if they're working with another person's foundry. It's actually not just tools. I mean, a fab does require a lot of power, a lot of water,
Starting point is 01:02:21 like a lot of consumables. There's many other input variables as well. But those can be scaled in the way that tools cannot. Yeah. Some more than others, but yes. But yes, in one sense, yes, we need a lot more equipment. But it is true. I mean, we also need a lot more just raw fab space, raw clean room capacity.
Starting point is 01:02:46 So if you think of a foundry like Intel, which has to build these expensive facilities, buy expensive tools, I wonder what you think the economics of that fundamentally could look like, whether it could get more economical, whether it could scale faster. Like I described earlier, this is an extreme. capital-heavy business and if you look at the if you just plot the you know how much does it cost to build a fab and if you just over the last I don't know 20 30 40 years I think it's like doubling every four to five years even inside the fab if you look at the cost to do lithography which is the most expensive
Starting point is 01:03:24 module just patterning that itself is doubling like more than that at more than that rate right so like today a high in a UV scanner costs like and all its associated equipment, it's like $400 million, right? And so what does that mean? If that rate were to continue, if you just draw the line and say, okay, does that mean like four years from now, like cost of patterning is going to be like $800 billion, right? Doesn't, you know, 800 million? It doesn't really make sense, right?
Starting point is 01:03:57 I think a very interesting thought exercise to do is to say, you know, are there things that could be just very radically different that we could do today that we perhaps couldn't do 20 years ago. This is a very risk averse industry for very good reason, for exactly that reason, right? You put in like tens of billions of dollars and you really don't want to take any risks. So you want to keep doing things the way they've been done for literally decades. And this is not just true of semiconductors, but like everything really. But if you've just kept on doing that for decade upon decade, many things just become like, you know, you just become indoctrinated, right? And, I mean,
Starting point is 01:04:42 there are engineers who probably work at Intel, who are new, who just, you know, come in and they're taught, this is how the fab, this is the process flow. And they just take that as gospel, right? That's just how it is done. But is that really the best way to build a chip today? it's a really valid question. I'm very curious what you're hinting at, because it could be anything from, you know, we can figure out ways in which you use fewer lithopasses and economize on this expensive and spend it could phone
Starting point is 01:05:11 until like maybe we need to rethink the transistor. What is the level of? I think all of the above. Transistor architecture and, you know, evolving, you know, just a silicon transistor has continued to evolve over 30, 40 years. And that will continue. So, right, you've seen the evolution from like the planar transistor to FinFits to now gate all around transistors. There'll be more, like that roadmap is pretty, you know, it exists and it's pretty well defined. A lot of people working on it.
Starting point is 01:05:47 But there's things like, you know, do you really need a clean room today? Right. Do you need the infrastructure to be as as sophisticated? as complex as it is today. Surely one can run an experiment where you just, you know, people are eating hamburgers and smoking cigars in the research fab and see what happens to yield. That would be a great experiment to run, but, you know, no incumbent, like, you know, Intel or TSM or Samsung.
Starting point is 01:06:19 I mean, nobody would want to just willingly do that. So that's what I meant really by this, you know, it's a very risk-averse business for good reason. You know, every one day lost in productivity is like, I don't know how many dollars, right? But you save so much money and not having to vote clean rooms in the future. But, you know, it's really the risk of the fear of the unknown, right?
Starting point is 01:06:41 So nobody is going to willingly take that risk. But that's why I think, you know, sometimes it's good to sort of just start with a clean slate and rethink everything. And it's like, okay, these things, you know, same thing applies to like, you know, chip design, by the way, right? Many of the ways we do CPU design were probably locked in like, you know, 30 years ago. Does that mean it's the smart to still do it the same way? Probably not, right?
Starting point is 01:07:13 But this is a very complex problem, you know, chip design is like easy to, it's fairly low, you know, I guess the capacity to take risk is maybe higher. This one, you know, this one, you less so. But given where the economics is today, I think it's a very valid question to ask, you know, like maybe there's a smarter way to do this. So to close out, maybe we'll start off at the same question we began the interview with, which is how does Intel
Starting point is 01:07:45 respond to this crazy AI demand that's incoming and has already arrived? And it sounds like what Intel ought to do, if the ultimate bottleneck is, you guys already have these foundries, you guys already have ability to expand these foundries. But what you're, what you will eventually lack is the tools from upstream in the supply chain to just like raise as much capital as possible right now. The same way that Envidia has locked down memory and other components for, you know,
Starting point is 01:08:15 reportedly hundreds of billions of dollars worth of commitments that it's made. Yes. Intel should maybe do the same thing, make all these commitments so that as, um, over the coming years, yes. the U.S. is in good position to have the bulk of semiconductor manufacturing at the most advanced levels happening here. You're saying, we should be buying a lot more tools, right? Yeah, because it sounds like it's just like, well, in a couple years, otherwise, you'd just
Starting point is 01:08:38 be in a position where you're like, oh, man, we can be making trillions of dollars right now. But all the tools are in Taiwan. Yes. I mean, no, that's a very, very valid question. Had we known what we know today, we would have bought, invested more like a year ago. Knowing what we know now, I think we'll be investing more.

There aren't comments yet for this episode. Click on any sentence in the transcript to leave a comment.