Odd Lots - Jigar Shah on the Pathway to Clean, Cheap, and Abundant Energy
Episode Date: October 6, 2023Jigar Shah is the head of the Loan Programs Office at the Department of Energy and thanks to the Inflation Reduction Act, he has hundreds of billions of dollars to lend to companies to accelerate the ...commercialization of clean energy technologies. The office has already been extremely active over the past year, and there's lots more to come. In this special episode of the podcast that was recorded live at the Texas Tribune Festival in Austin, Texas, we discuss his office's strategy and what it will take to achieve the clean, cheap energy system that so many people want. We also discuss specific industries, including nuclear power, and what it will take to build momentum towards more deployment.See omnystudio.com/listener for privacy information.
Transcript
Discussion (0)
The news doesn't stop on the weekends.
Context changes constantly.
And now Bloomberg is the place to stay on top of it all.
Hi, I'm David Gurra.
Join us every Saturday and Sunday for the new Bloomberg this weekend.
I'm Christina Rafini.
We'll bring you the latest headlines, in-depth analysis, and big interviews.
All the stories that hit home on your days off.
And I'm Lisa Mateo.
Watch and listen to Bloomberg this weekend for thoughtful, enlightening conversations about business, lifestyle, people, and culture.
On Saturday mornings, we put the past week's
events into context, examining what happened in the markets and the world.
That on Sundays we speak with journalists, columnists, and key political figures to prepare you
for the week ahead. Join us as soon as you wake up and bring us with you wherever your
weekend plans take you. Watch us on Bloomberg Television. Listen on Bloomberg Radio, stream the show
live on the Bloomberg business app, or listen to the podcast. That's Bloomberg this weekend.
Saturdays and Sundays starting at 7 a.m. Eastern. Make us part of your weekend routine on
Bloomberg Television, radio, and wherever you get your podcasts.
Hello and welcome to another episode of the Odd Lots podcast.
I'm Joe Wisenthal.
And I'm Tracy Allaway.
Tracy, today we have a special episode of the podcast.
That's right.
So we traveled to Austin, Texas.
We were there for the Texas Tribune Festival and we recorded a live episode with one of our favorite
oddlots guests, Jigger Shaw.
That's right.
Jigger is, as listeners may know, the head of the loan program at the Department of
Department of Energy. This is his third time appearing. The first time we talked to him was early
2022 when the loan programs office was this sort of small backwater office within the DOE.
Then we talked to him again about a year ago, right after the Inflation Reduction Act was
passed when his office got tons of money to lend out. And then this was sort of like a one year on
episode. What are they doing with all this money at his office? And what are the real prospects
for sort of decarbonizing our electricity system.
He's sort of in the groove now.
He's spending some of the billions of dollars that he's been authorized to spend by Washington.
And it's really interesting to see how he's actually putting that money to work
and what's getting him excited in the energy space right now.
All right. So take a listen.
Jigger, we've talked to you a couple of times in the past on the podcast about the loan program office.
what do we start just like sort of a quick summary and we've talked like about what you do like
real quickly just what is the loan program office for people who may have not uh familiar with it or
past episodes and what do you do well thanks for having me back um the loan programs office was
started in 2005 and the whole point of it was that for a lot of this technology the DOE is
awesome at inventing, it tends to not be able to get commercial debt for commercialization.
So a lot of these projects might be a billion dollar project and going to get debt from
the commercial markets for a first-of-a-kind project, you know, namely like, you know,
Tesla's first loan or some of the large solar and geothermal projects we did, was just not
feasible.
But what's more interesting is today, our remit's been expensive.
expanded substantially. So it used to be we had this innovation bucket and then we had this
vehicles bucket basically. Today we have a tribal energy program. We have this energy infrastructure
refurbishment program, right? So figuring out how to take old coal plants and determine
nuclear plants or old transmission lines and double them up or, you know, figuring out what to do
with old refineries or tank farms. And so we have a much larger scope today. So we've got,
you know, a lot more resources today. So how much more?
money do you actually control now? Because of course, I've seen variable estimates, and I get that a lot of
it depends on how things develop. But you've been doing this for a while now. You have extended some loans.
Do you have a good sense of whether it's $400 billion or $500 billion or $600 billion?
I mean, what's a billion between friends? What's $100 billion between friends?
Yeah. I think, so when I first came into office, it was roughly $40 billion of loan authority.
today, if all of our loan authority was used, it would be closer to $400 billion.
We have no idea whether it all be used, right?
So the largest program there is this refurbishment program, which is $250 billion.
Interestingly enough, it really is taking off.
So I think when we first started talking to electric utilities and oil and gas companies
and others about using it, I think they didn't want any part of it.
They didn't really see how it was valuable.
Today, I think we've already got about $56 billion.
million dollars worth of loans either received or being actively prepared that we've seen
early drafts of.
So we are seeing a lot of interest in that program.
And so, you know, whether we get to that number or not, we'll be determined on whether
that program is successful.
Yeah.
The first time we ever talked to, I think it was early 2022.
And someone said, oh, Jigger, he's someone you should talk to.
He knows about energy.
He's sort of an interesting guy and knows about this stuff.
And then I think it was like about three or four months later in the Inflation Reduction Act
past and someone's like, oh, you know, that guy, do you hear you talk to? His office just got
whatever, 600 billion. Like, oh. So what went from like this sort of, I don't know backwater's the
way, but fairly like modest division of the Department of Energy, you are now a key player in
essentially this massive effort by the Biden administration to decarbonize our energy system.
Yeah, look, I think that when you think about my own background, having started Sun Edison,
and then generate capital.
I think I have a unique understanding on how this stuff works,
which is that we have these extraordinary people
who, frankly, bust their hump for 10 years in obscurity
before they get to where the loan program's office can help them.
When you think about a lot of these companies
who have figured out green cement or green steel
or next generation transmission lines
or next generation hydrogen facilities,
I mean, they were in a lab getting some like 50,000,
dollar grant like 10 years ago. And then their thesis worked out. Then they decided to get an A round
and then a B round. Some of them may have spacked prematurely. I remember those. And so, you know, I think
that the goal for me is not to, you know, puff myself up, but to recognize that we have all these
people. And honestly, the ecosystem that we have in this country to take them from the technology
works to connecting it to the American worker, building the facility here, doing all the stuff
here, frankly, we haven't done in 40 years here, right? I mean, most of our technologies went to Asia
or went to Europe to get commercialized. And now I think with the Inflation Reduction Act,
it's sort of my job to convince them to use these resources to stay here and to do it here, right?
And I think a lot of that really means that we've got to do a lot more outrage. We've got to convince
them that this is a place that wants them, because you know how hard it is.
is, right? I mean, you have to get permission from people. You have to get a permit. You have to get
a governor who actually wants to put together an economic development package for you, right?
And if you haven't done it in 40 years, then it could be that, you know, it's a little bit
harder to do it here. Do you feel pressure to spend the money? Like, is there a sense of urgency
here? And then how do you actually balance that with the need to make efficient and useful
and ideally profitable investments? So I definitely don't feel pressure to put the money out
the door. I think that the money should go out the door if it deserves to go out the door. We have
300 people who work for us at the loan programs office, and so they are the ones actually evaluating
and doing the work to get the loan to the finish line. I certainly have a lot of subject matter
expertise so I can be somewhat helpful. But honestly, the biggest part of my job is to get people
to trust us, right? So getting the growth companies to trust us was something that was fairly
easy for me because a lot of those people are my peers from my professional life. But getting the
electric utility companies to use us, I mean, that was not an easy task. And now I've got to get
the oil and gas companies to get to use us, right? And that's not easy at all. Many of them feel like
they're going to get stripped of their country club membership if they use the loan programs office,
right? And so, but they're not going to do the right thing unless they do it, right? Because the numbers
don't work without our debt. Like the returns aren't high enough without our debt. And so I need them
to come into the office. And so a lot of what I'm doing is trying to build trust.
So your company that you started Sun Edison, I mean, it was a finance breakthrough, right?
I mean, the solar technology has existed, but you understood that there was an opportunity to finance
the deployment of solar in a new way. Can you just speak theoretically or big picture?
Why are there projects that can pay back the debt but which private sector money is not there?
Why is it important for the public sector balance sheet to be deployed for certain types of energy projects?
And then maybe we can get into some of these specifics.
There's a couple of reasons that I'll go through, right?
One is the Department of Energy has 10,000 expert scientists and engineers on the platform, right?
Most of the fundamental patents on these technologies were invented by one of those 10,000 people.
So when you have a methane pyrolysis project like monolith materials that we gave a conditional commitment to in 2021,
Like, there's somebody in a national lab who actually invented it.
And so when I go to him and I say, hey, you know, like, what do you think about this thing?
Right?
They're like, yeah, we've done like 18 demonstrations of this project and we think this will work and the way that they're approaching it's going to work, et cetera.
There's nobody for J.P. Morgan to go to for that.
They're going to be like, this scares the crap out of me.
I'm not going to do this deal.
And so you can imagine that there's a lot of technology risk that is perceived by the banks that we can actually manage because we have all these experts on a platform.
The other piece of it, though, is that, you know, with the Basel 3 rules, you know, passing
up to the global financial crisis, for a lot of these banks, if they don't actually have
investment-grade off-take agreements for some of these things, like I'll give me an example,
like for a lot of these critical minerals projects, there's no history whatsoever for someone
to say, you know what, I'll pay a fixed price for that lithium for 10 years.
Generally speaking, it's like, well, whatever the lithium price is, we're going to benchmark
to that price.
Lithium has gone down by 45% already this year, right?
And so the government is actually willing to take that risk because we know that, you know,
we're going to have all these electric vehicles purchased over the next 10 years.
The world's going to be short lithium.
So even if in the short term, lithium prices went down and long term, you're going to need
these resources.
Like that formula under a bank's rules would require a huge amount of tier one capital to be set
aside for that loan.
so you can imagine them saying, I'm not making investment banking profits on this.
I'm not going to use my tier one capital for this, right?
Because there's a bit of a friction, right?
Because on the other side, you've got the Federal Reserve and the OCC commissioners who are saying,
that looks like a risky loan.
We're going to make you put more tier one capital against it, right?
And so there's lots of reasons why you have friction in the marketplace.
But before we were active, most of these companies had to 100% equity finance everything.
right they would just have to raise a billion dollars in the marketplace and then do that and you can imagine there's very few companies that could do that so then we were restricting innovation and restricting it's getting commercialized i'm franzine lacquer an award-winning journalist and i've got a new podcast leaders with franclaqua from bloomberg podcasts i've interviewed everyone from heads of state to fashion icons about the news of the moment but i've always been curious who are these people as leaders i don't think there's one right way to
to be a leader.
Make decisions.
A poor decision is always better than no decision.
Listen to new episodes every other Monday.
Follow leaders with Francine Lacroix wherever you get your podcasts.
I realized I made an assumption in my previous question because I said, ideally,
you would make loans that make a profit, and that's probably true.
But how do you think about profit versus risk?
Do you have to make a profit?
Or do you think there's a role for government to finance riskier projects that maybe
have a public good or utility? Yeah, a profit is a very strong word, right? Because we don't really make
a profit in the government. So I don't think about it that way. I think about it is Congress gives
us a couple of things. So let me just maybe help you understand how the money flows. So, you know,
when we give somebody a loan, the U.S. Treasury Department theoretically issues bonds and then we
issue that loan. So the U.S. government has to pay back those bonds. And so, you know, we give somebody
And so there's a certain cost to the U.S. government of that thing.
So if I'm charging someone, U.S. treasuries plus 37-5 basis points, which is a lot of our loans are at that rate, then the money I'm getting in for the U.S. treasury bond coupon, I'm not viewing as profit for, because that's just going back out of the tour to investors.
So it's a 37-a-bap basis points that, you know, was coming in abovehand, right?
Separately, the U.S. Congress gives us something called credit subsidy.
And what we use that for is to put a loan loss reserve in place.
So I might say, like, our average loan is rated B minus, right, what you guys would call junk bonds.
So, like, you know, by definition, when we issue the loan, we are saying that we'll likely have a default, right, of let's say maybe a 12% risk of default or a 22% risk of default.
But it's not a 1% risk of default.
And so then we put that much money to the side in a loan loss reserve.
So the Congress is saying you have this amount of money to quote unquote lose, right?
And that's the money that they allocate through a budget process.
And what we've averaged to date is that we put aside $5 in loan loss reserve for every
dollar of actually like realized losses we've had.
So we put together roughly $5 billion of loan loss reserves and we've lost about
$1.03 billion total.
And so from that perspective, that's, you know, $4 billion that the Congress gave us to, quote, unquote, lose, that we didn't lose, and that we returned back to the taxpayer.
So, but, I mean, the other way I think about it, right, so that's strictly answering your question.
But the other way I think about it is, it is clearly the case that Tesla is the best electric vehicle company in the world, clearly.
And they will fully admit that there is no chance that they would have gotten the amount of less off the ground without our loan.
And so what's it worth to dominate these industries into the future, not just electric vehicles,
which happened in the first generation there, but in the future, right, when you look at methane pyrolysis,
what they do is they take natural gas, they split it into hydrogen and carbon.
Carbon black is something you need to make tires.
Even electric vehicles use tires.
And so we need to use that, right?
And so right now the largest exporter of carbon black in the world is Russia.
right? If this works, which I'm pretty sure it will, we will be the largest exporter of carbon black
in the world, right? And that's a really important market for us to dominate, right? So the question really
is like, you know, yes, there's, you know, being good with taxpayer money, but the other piece is
actually reaching real outcomes. All right. So we sort of, we've covered in the very broad strokes,
the bank that you basically run within the Department of Energy zooming out as part of this whole project.
And we're here in Texas in Austin at the Texas Tribune Festival.
This is a state, of course, where energy and the grid has been in the news a lot in the last few years.
And it seems to me like when we think about the grid, well, a few years ago, most of us weren't even thinking about the grid.
We just sort of took it for granted.
It just worked.
Over the last few years in various states, we've had these problems.
People want cheap electricity.
They want reliable electricity and increasingly clean electricity.
Can we have all three?
We're delivering all three.
I mean, look at Texas, right?
Texas is the, like, ground zero here, right?
You're talking about the state that has installed more wind power
and more solar power over the last five years
than any other place in the entire country.
I think it's number one in the country in wind
and number two in the country in solar,
and we'll be number one in the country in solar in like 18 months.
It's also number one in the country
on an ongoing basis in installing battery storage, right?
I mean, it's also the one that's actually like, you know, piloting these virtual power plants where there were Tesla electric customers this last summer who had like negative $600 bills because they were selling power from their power walls into the marketplace at $5 a kilowatt hour when market prices dictated it.
And so they were helping their neighbors, right?
And so that is not allowed in California.
Like, that is allowed here.
So when you think about the level of innovation happening in Texas right now, it is at an all-time high.
And I think that part of it is because Texas needs that level of innovation, right?
I mean, their natural gas fleet didn't perform as well as they wanted it to during, you know, Uri and then some of the other issues.
So they've recognized that they need to diversify where the electricity comes from, which is why they're building so much solar and wind.
But also, they've decided to put two new semiconductor plants.
here in Texas. They have all this growth. All these companies are deciding that Texas is where
they want to build stuff. If you fly into DFW Airport, there's all these roads and you're like,
where are the houses? They're coming in like the next 18 months. There's so much load growth here.
So now the question really becomes like how do we build the grid of the future? And they're figuring that
out here in Texas. It's pretty exciting. Well, setting the great state of Texas aside, and we are recording this
live in Austin, so I feel like I should describe it that way. Setting Texas aside, I mean,
it is true that you have seen demands on the grid rise. And in particular, I think I saw a
statistic saying that something, there was a 40% increase in the amount of grid connection applications
in 2022 alone. And a lot of this is coming from, you know, renewable, solar, wind that need
electricity and want to feed it back into the grid, how do you solve that problem?
Let me back it up for a second and then explain to you where the friction points are and
then maybe we can talk about how we solve it. So in general, you've got three major pieces here,
right? You've got generation of electricity. You've got the transportation of that electricity
to your home or business or whatever is the transmission distribution grid. And then you've got
the load itself, right? And so you've got a lot of load growth from
New manufacturing facilities being announced because of the Inflation Reduction Act.
You've got electric vehicles being added to the grid at record numbers.
You've got heat pumps, all these other things, right?
So the main thing that I think you're asking about is the transmission grid.
So you've got a whole bunch of people who...
Wait, can we back up for a second?
What's the difference between transmission and distribution?
So the transmission grid is generally at much higher voltages,
and they're transporting power long distances from where, you know, like the panhandle of Texas,
where they have a lot of wind down here to populated centers, right?
The distribution grid is what's in your neighborhood.
And is, you know, basically having to manage, you know,
making sure that you have power for your 400 amp service.
Because if you plug in 15 electric cars at the same time,
then the distribution grid has to either be able to handle it
or be able to throttle the amps to each home
so that the distribution grid doesn't, you know, get overloaded.
So what are the issues sort of facing the transmitting?
mission aspect of the grid at the moment.
So basically what happens is that, you know, someone says, I've got a fantastic piece of land.
I think I can put wind power on it or solar power.
Mostly it's solar these days.
There's a lot less wind in that transmission queue.
And they say, great, you know, like I'd like to apply to be able to use that transmission
line.
Now, there's many different regions of the country, and each one of them does it differently.
Texas is arguably the best region for this.
And so what they do is they check to make sure it'll be safe.
So when you connect it to the grid, it won't actually make the grid like unstable and, you know, and then take something down.
So they'll check that.
But then they don't actually check necessarily that there's capacity for you.
They sort of say, you should just interconnect.
And if there's too much on the grid, any one time, we're going to tell you to curtail.
So we're going to tell you to shut off.
And, you know, you can imagine you're not making any money when you shut off, right?
And so, but Texas is like, that's your problem.
Like, you know, and then separately, they actually calculate really well what the loss to ratepayers are for that congestion, right?
So if there's not enough transmission capacity, then the coal plant that's next to somebody's house has to turn on and be used more.
That's more expensive.
They say, oh, if there was enough transmission capacity, then that would have been cheaper and better, right?
And then that's what they justify paying encore, which does a lot of the transmission distribution, to be able to build new transmission.
They're like, well, the congestion charges were so large that we should build new transmission to make sure people have lower bills.
So that is the ideal situation.
And that's what Texas does.
And you get a lot more movement.
I mean, even Texas is clogged up just because there's so many applications, but they're the fastest.
But places like the Northeast or the mid-Atlantic states or the Midwest states,
I mean, people are actually waiting like four to five years to get permission to interconnect
because in those states, they largely say, well, we want to know that there's actually
a piece of transmission that's available for you.
So we're waiting for this coal plant to cease operations or this natural gas plant before
we allocate that transmission for you because we don't want to do this curtailment thing.
And so as a result, we have 1,200 megawatts, 1200 gigawatts of like roughly like of generation
in this country, we have the same amount, 1,200 gigawatts, waiting in queues for permission to be added
to the grid right now.
Wow.
As soon as the Inflation Reduction Act pass and everyone got really excited about all of this new,
you know, energy that was going to be in a wind and solar, et cetera, then immediately
people started saying, oh, but we don't have the transmission capacity and then there was this
big fight.
We need permitting reform and we need that because that's the only way.
Otherwise, we're going to have all this stranded energy.
Like, are we at risk of.
having a bunch of government subsidized or government influenced energy that ultimately does not
make it onto the grid because of some other fight that hasn't gotten taken care of yet?
So let me answer that question from the other side.
Okay.
But I will answer it.
I think that in general the question is why does any of this stuff matter?
Right?
Like, I mean, why do you care?
Rather we actually interconnect all this solar and wind or new nuclear plants or a geothermal
facility, you know, we want to reliccense 37 gigawatts of hydro dams that are like from 1910, right?
Why do we even care?
It's because everybody wants to use chatGBT, right?
ChatGBT is 10,000 megawatts of compute power by itself.
Now you add like Google and all this other stuff and then people want electric cars.
They like it.
You know, like my son yells at the car in front of me because he's like, they have a tailpipe.
My daughter does it.
My daughter does the same.
That's how it is, right?
So that's why we care about this stuff.
Like, we're not doing it because we're trying to, like, just make everything more complicated.
We're doing this because Americans believe that using more electricity makes their life better, right?
Whether it's, like, storing photos that they probably should delete, but they're going to keep them around anyway, right?
And then paying like Apple, another dollar 99 a month, right?
That's why we care about this stuff, right?
So now the question becomes, like, if we all care about this enough, right?
if we all want this enough, what are we willing to do to accelerate it?
Right?
So you've got permitting.
You've got the National Environmental Protection Act.
And so people talk about NEPA and all this other stuff.
And so do we want to make this stuff easier?
Right.
And you've got Bill McKibben who wrote a big article about saying it's time to build.
I mean, this is the guy who led the movement to like kill the Excel pipeline.
Right.
And so even he's saying like, we sort of need to build, right?
And so now the question really becomes, how do we build and how do we do it in a way that's equitable that make sure that we're paying people a fair wage and all these other things?
And what we're looking at doing is figuring out how we actually check to make sure that things that we really care about are checked.
We don't want to like just gloss over things and just say, whatever, we should just lower our standards.
we're just saying that we might be applying the standards in an incorrect way for certain projects, right?
Because certain projects really don't have the level of toxicity within air pollution issues or local impacts or other things.
And certain projects maintain those things, right, like green chemical plants or some of these other things.
And so we just need to be more appropriate in the way in which we implement those rules, right?
So that's one piece of it.
The other piece of it is, you know, we need to do things differently.
right for a long time for 20 years we have not had load growth in this country right so we
basically sell the same number of tarot hours today that we did in 2003 and largely that's
because there was a good reason that no one really paid much attention to this stuff there just
wasn't the need for it there was no need for it right but now everyone is like oh my god we got
to grow again that's a lot right but the beauty is we actually have solutions to all of it like
The crazy thing is, like on the grid, right, there are all these things called grid enhancing
technologies.
I'll give you an example.
Like, the grid basically is operated by slide rule.
And so people say, this thing basically has 3,000 megawatts of capacity, right?
That's actually not true, right?
What's true is that the capacity changes based on the temperature outside, right?
So there's less capacity when it's like 102 degrees outside, way more capacity when it's 45
degrees, right? So you can put in dynamic load ratings, right? Guess who does that? Everybody but
the United States, right? And so, and we invented it. So the UK has fully deployed it,
Belgium is fully deployed it, all these other, Brazil, India. Everyone's doing this stuff,
except for us. So, like, this is what I was saying. We have all these entrepreneurs who invented
all this stuff, and we didn't deploy it here. We let them go overseas to deploy it there.
Wait, why? It seems like a slam dunk. Why? Why not? What's the impediment?
So, like, PPL was on a podcast the other day, which is Pennsylvania Power and Light.
And they were saying, you know, basically they had this thing where they had to solve it,
so they put in dynamic load ratings.
It was only like $900,000 to do it, but it saved $50 million of upgrades.
And they were like, we make money to deploy dollars.
Like, this was a terrible decision for our shareholders.
We did it because there was no other way for us to upgrade that line,
and we had a customer that really needed it.
And so to upgrade the entire United States of America,
grid enhancing technologies to unlock 30% more transmission capacity would cost a total of $3 billion.
Let's do it.
Right?
But like, but you have like all these competing interests of people who are like, but jigger, I was going to spend $23 billion to upgrade the transmission grid.
That was going to be rate base for my shareholders.
Why would I want the $3 billion?
But you know what?
All of that is evaporating away today because they're all just saying we can't keep
up with load growth. So we'll do the $3 billion and we'll invest even more money because a lot of our
stuff's 50 years old. So we kind of have to like replace it anyway. And so all of these traditional like
loggerheads that we've been at for 20 years is really going away because people know that we need both.
I'm going to take a cue from a member of the audience and ask like how much interest do you see from
the utilities themselves when it comes to your loan program? Are they knocking at your door?
or is there still a lot of reticence?
So when the Inflation Reduction Act first passed,
we got this energy refurbishment sort of program.
And I reached out to them all and they said,
jigger, we can raise money ourselves.
We don't need to use your program.
We're never going to use your program.
Then I was able to recruit Leslie Rich,
who's the most feared stock analyst on Wall Street,
for the electric utility industry from JP Morgan
to come run the program.
And suddenly I've got like $58 billion with a loan applications
in the loan programs.
office. So, you know, people really do matter. And so she's been able to convince them. She's like,
well, you know, you kind of are at a soft rate cap. You can't keep raising rates 10% a year and
continue to, like, have a social license in your state. Like, you should actually figure out how
to reduce rates for rate payers. And so the arguments are like, you know, filtering through,
people are having these conversations. I do think that, um, for sure in 2019, people were not
serious about the fact that we might have load growth again.
even when the Inflation Reduction Act passed, it's not clear to me that people really had internalized it.
Today, no matter where I go, people are actually actively interested in learning about how they should do things differently within the utility sector in all three areas, right?
So generation, transmission distribution, and what we call virtual power plants, which is actually, you know, flexing demand with the same level of dexterity that we currently only flex supply.
I definitely want to talk about virtual power plants, but since you mentioned electricity rates just then, I mean, both Joe and I live in New York.
We are the slaves of Con Edison in some respect, and every year, it seems, Con Edison will announce a rate hike.
And a lot of that goes into not necessarily the price of electricity, but the distribution costs.
And I think that's been a trend for a few years where, you know, actual load demand or consumption of electricity has been pretty stable, but,
distribution costs have gone up and up. Can you explain what's happening with that dynamic and how
the DOE can help with that aspect of it? Yeah. So let me start from first principles and then I'll
answer your question directly. So in 2000, right, the National Academy of Sciences said, you know,
the most important machine in the whole world was the electric utility grid, right, of the 20th century,
right? And so they got this award for, you know, the best engineering marvel of the 20th century, right?
This engineering marvel has cost us over a trillion dollars to build, right, over time. And we use it 40% of the time.
So if you're a private sector company, which some of these utilities are, and you have a machine that you built that cost of a trillion dollars,
and you only use it 40% of the time, you'd be like, usually we're trying to maximize the like operational, like, you know, capacity utilization of the
machine. We spent a trillion dollars on it. We should use it more, right? So the reason they don't
use it more is when air conditioning came in in the 1970s, right, then you had this peak, right? So
whenever you have a hot day, you have its peak. And so they built the transmission distribution
grade to handle air conditioning. They built a bunch of natural gas peaker plants to be able to
power that air conditioning. And so the peak to trough utilization, like, has gone bigger, right?
So now you're using 100 units of energy at the top. And you're using, like,
like 25 units of energy at the bottom, right? And so what they have said to homeowners or, you know,
condo owners or, you know, renters, is you can do whatever you want with your demand,
and we will make sure that the lights work, right? That's really expensive, right? So every time you
buy something, whether it's a hair dryer or an espresso machine or whatever it is,
they have to upgrade the service to make sure that if all of you turn it on,
at the same time or some reasonable amount of you turn at the same time, then you can be accommodated,
right? The other way for them to do that is to say there are some loads that you just don't
care about, right? Like your water heater. You don't really care whether your water heater turns on
right after you finish taking a shower or whether it turns on like six hours later when there's
excess capacity in the grid. And a lot of real electric co-ops have controlled those water
heaters for 30 years, so it's not new technology. But like if you flatten the load, right,
and you shift like, you know, and the reason this is coming back in a big way right now is because
of electric vehicles, right? Like it, most people who have electric vehicles, they plug in their
car when they come home from work or school or whatever, and they leave it plugged in for 13 hours,
but it's only charging for three of those 13 hours, right? So people don't really care which
three hours they're charging as long as it's charged by the time they wake up in the morning,
right? And so people are like, oh, like we can actually accommodate a lot more electric vehicles
if we do manage charging. And so once you open that door, well, now you've got to allow water
heaters and thermostats and all sorts of other stuff that you have an app for on your phone,
right, to be able to do manage charging. And so the old paradigm was that Con Ed just upgraded the
distribution circuit every time.
you found some cool new thing that you wanted to buy. And now we're saying, ah, that's kind of getting
expensive. You should actually do managed, you know, charging. You can get the news whenever you want it
with Bloomberg News Now. I'm Amy Morris. And I'm Karen Moscow here to tell you about our new on-demand
news report delivered right to your podcast feed. Bloomberg News Now is a short five-minute audio
report on the day's top stories. Episodes are published throughout the day with the latest information
and data to keep you informed.
Yes, there are other products like this from a variety of news organizations.
But they usually rerun their radio newscasts throughout the day.
That's not what we do.
We create customized episodes that can only be heard on Bloomberg News Now.
And we don't wait an hour to publish breaking news.
When news breaks, we'll have an episode up in your podcast feed within minutes.
So you're always getting the latest stories and developments.
Get the reporting and the context from Bloomberg's 3,000,
journalists and analysts we're all over the world. Listen to the latest from Bloomberg News Now
on Apple, Spotify, or anywhere you listen. So we're about halfway done with our time with you here.
And I want to like get into like some of the specific source of generation. We should talk a little
wind and nuclear and all that. But before we do, there's this critique of the way and our infrastructure
in the U.S. has developed these days, particularly under that Biden administration. And the
critique is basically, okay, we have this mission to decarbonize the
grid, add capacity, all that. But that the administration adds all these other requirements,
social requirements. Oh, the companies have to provide child care and they have to do this or that,
all these other things that maybe didn't make it into the bill and maybe other progressive or
liberal interests, like want to squeeze it in somehow to how we build out. And they're like,
we're never going to accomplish these goals of decarbonization. If the company's building this or
that also have to satisfy X, Y, and Z, you know, sort of.
of liberal wish list, progressive dreams, of whatever it is.
Do you see that in your day-to-day that this is an impediment
that things that are not directly related to building and electrification
get in the way of new construction?
No.
So in general, I'd say that we have statutory requirements, right?
So for our office, you have to pay Davis-Bacon wages for construction.
You have to use this thing called the Cargo Proference Act.
But other than that, there are no other requirements.
of my office, and so we don't impose any other requirements onto our applicants. Now, that being
said, remember, we haven't done this in 40 years, right? It's not like the United States of America
has been like building manufacturing facilities, brand new manufacturing facilities for 40 years. We haven't.
And so, you know, yesterday I was in Georgetown, Texas, one of our companies, cell link, right,
is building their facility up there. They make these extraordinary wire harnesses for electric vehicles
that are like 95% less weight, which is amazing.
But, you know, the thing is, and you would think wire harnesses are things that, you know,
you can only make in low-wage countries around the world, but they have this innovative process
and so they can make it here in Georgetown, Texas.
We asked them to put together a meeting, right, for, you know, workforce.
They have to hire about a thousand people.
And so, you know, how are you going to do that?
Where are you going to go, et cetera, et cetera.
There were a lot of people who came.
And, you know, a facilitated conversation.
There's no mandate there.
I wasn't suggesting that they had to hire, you know, a good mix of this group or that group or whatever it is.
It's more like, let's have a conversation, right?
It was very clear to me that most of the people in that room were so appreciative of selling,
creating a thousand jobs in that community, but had never had the chance to provide CellLink any feedback
about how they might recruit better, right?
Now, that's not because Sell Link's a bad company, right?
Sellink's a startup company that probably almost went bankrupt like three times.
And, you know, think they're lucky stars that they got the capital when they needed to to actually get to this point.
And now they're building a factory.
They're like the American dream.
So I'm not surprised that the number one thing that he's working on is not figuring out there was workforce issues.
Right.
And number one thing he's working on is making sure that the Chinese don't steal his technology and like that he's continuing to like, you know, succeed on this stuff.
Right.
And so he came up after me.
His name is Kevin Coughley, and he's great.
And he said, you know, Jigger, this was super helpful.
I want to do right by these folks in the community.
I want to actually meet all these people, et cetera, et cetera.
And so it was a good conversation.
I didn't force him to hit some sort of metric or do this thing or whatever else.
But, you know, in general, what I find is all of the people participating in the loan programs office are, you know, Americans who are quite proud of their country.
They want to do right by their workers.
They want to do right by the communities that they're in.
etc. But it's not surprising me
they're not experts in that
part of building a company.
They're experts in their technology.
And so we do facilitate
good conversations. I'll give you one more story.
So there's one company that we
provided a conditional commitment to. I'll
try to keep the details sparse so they have no
outing them.
They are going into a state that has
an extraordinary shortage of construction workers.
Right? So, and they said, look,
Jigger, I'm just not going to be pro-union like
that's not going to happen, right? Fine. So I said, well, but you should sign a project labor
agreement. They're like, jigger, that sounds like a union term. And so I was like, well, it kind of
is a union term, right? So you should sign a project labor agreement. And what that does is it
mandates and requires the union do a couple things. One is start training workers for you right now,
right, six months, eight months before you actually need them. But two, if there's actually
too much work and not enough workers, you get first in line.
right now if you end up doing an rfp and you pick a non-union contractor right that's fine they would
still pull from this union hall or not or whatever like union workers do a lot of non-union
contractor work right he's like jigger i never understood that they never taught me that at
harvard business school like i don't know how any of this stuff works right and so he was appreciative
like you know it wasn't like he was union anti-union like pro union he was like i'm probably not
inclined to go union but
But I do need workers that are trained to actually start working on my job site as soon as I'm ready.
And this is going to make it easier for me to meet my schedule and my cost.
Yeah, I'll do that.
So you sort of suggested that some of these executives, maybe they just hadn't thought about it before or weren't experts in it because they were focused on other things like competing with China.
But just to press on this point, because I think it's kind of timely at the moment, especially given the UAW strikes.
But one of the arguments that you hear is if you attach a lot of expensive conditions to the labor force within the U.S., that makes it uncompetitive compared to places like China or Mexico where the cost of labor is not only cheaper, but also not unionized and is probably not providing things like child care.
How do you think about the competitive aspect of that?
As I said before, the loan program's office requires Davis-Bacon wages for construction.
In general, that hasn't been a problem.
In general, when you construct something, you want the folks who have the most training
doing your construction is, you know, first hand.
It helps.
And so, you know, like that really isn't something that we fight over.
They're like, yeah, that makes sense.
So we want the highest quality workforce so that, you know, when we build this building,
it'll last for 30 years and it'll be done properly, right?
So that isn't really a problem.
There's no requirement for folks to go union for the operating jobs.
And so, like, we're not requiring that.
That being said, we're saying to people that these are, particularly in the manufacturing space, again, which we haven't done really in 40 years.
You know, these are craftsmen, right?
Like, they're actually like, the more they work at that place, the better they get at that job.
And they become more productive and they provide a lot of insight.
I think when you hear Elon Musk talk a lot about this at Tesla, you know, they've sort of onshoreed almost everything that it takes to make a car, right?
so they don't really import from 1,000 different suppliers,
they do stuff here.
And what they say is actually the folks who work on the line
actually bring a lot of the best innovations to the table, right?
They're like, oh, this could be done smarter,
this could be done better, this could do stuff.
So in general, like, you know, I feel like we're having these false arguments
because this is like something that, I don't know,
it finds like certain tribes want one thing,
certain tribes want something else.
So it's a great fault line to create.
But I think we all agree that you want workers who actually want to be there.
You don't want turnover.
You don't want like 10% of your workforce leaving every month.
And you know, you want, you know, folks to believe that they can, you know,
feed their families and, you know, support a community and all that stuff on that.
So I don't think we're arguing over those things.
And we're also not saying that 100% of everything that America consumes, we consume a lot,
is going to be made in the United States of America, right?
And so I think the administration has got to be.
to China, go to other things, saying we're not decoupling. So it's really, but there's a lot of
these high value innovations that we've invented out of the Department of Energy. And instead of
licensing them to other countries, which is basically what we did for 40 years, we're saying,
why don't we tie to the American workforce and make them here? Nuclear power. Two questions.
What is the role in your view in terms of meeting all this demand of nuclear growth in the
And is the reason we haven't had much nuclear expansion in the U.S. because a bunch of people, there's like some combination of anti-nuclear hippies and people who watch the Simpsons too much?
I challenge the premise of your question.
No, no. I'm just asking, is that the reason or not? Am I wrong? I'm not necessarily assuming that.
But I believe a lot of people are blamed them. There's a lot of stuff going on.
Let me try to unpack it for you.
I think, so basically, nuclear power really had its heyday sort of in the 60s and the 70s, right?
That's when we built a lot of our nuclear power plants.
In the 70s, it was already the case that nuclear power plants were becoming more and more expensive.
You had the nuclear regulatory commission.
You had a lot more regulation.
And so, you know, so you were already getting people less interested in doing nuclear power by the time you got to the late 70s.
Then you had Three Mile Island, right?
You can imagine, like that sort of scared people.
And so no one died.
Everyone's fine.
Like, you know, nuclear is one of the safest technologies in the world.
But, you know, it's scared people.
We basically didn't approve any new nuclear plants after that.
We finished the Byron Nuclear Power Plant, which I grew up next to in Illinois in 1984,
and then we finished Watts Bar recently.
And so we've had a couple of nuclear plants come online.
Vogel Unit 3 just came online.
Vogel Unit 4 should come online at the end of the year early next year.
So in Georgia.
So I think that in general, the nuclear problem,
power fleet that we have now was largely built in the 1970s, right? Nuclear power is one of those
things where the frustration that I have, and I was on the board of Greenpeace for six years,
is that they don't actually try to do it better. Right? It's always someone else's fault. It's
like nuclear power is just so damn complicated. It's so hard to build. This solar and wind stuff is so
easy. Like, we build complicated stuff all the time. We build like oil refineries. We build like,
there's like a lot of semiconductor fabs or no picnic. Right. So it's not like we don't know how to
build complicated stuff, right? But what I find is, is that in nuclear power, it's always something like,
well, if the federal government would just do it. We should just get the Department of Defense to
just do it. Right. You know, like, okay, but like that hasn't really worked for you since the 1970s. So
let's not try that because that's not working. So I think a lot of what we've done is right-sized the
nuclear energy industry by saying, look, you know, these 10 to 15 billion dollar nuclear plants,
it's not something that utilities want to build, right? Like, in fact, if you look at like the last
40 or 50 years of utility bankruptcies, like half of them were because of nuclear plants. So, you know,
I can imagine like a CEO of a utility company is like, I don't know.
I don't want to do a nuclear time.
I like my job.
Maybe not.
Exactly, right?
And so now we have this thing called small modular reactors,
which are neither small nor modular, but that's fine.
But they basically cost two to four billion dollars, right?
And in two to four billion dollars,
the utilities know how to do two to four billion dollar projects,
and they can find bonding for that and insurance for that.
There's EPC contractors that have a balance sheet that's large enough to wrap a two to four billion dollar project,
et cetera.
So we now have a size that we actually can handle.
When you look at like,
Vogel 3 and 4. Vogel 4 was 30% cheaper than Vogel 3, right? Because the same workforce was working
in the same reactor, and they did it better the second time around, which you can imagine.
So the way that these small modular reactors work is that you build four in one place.
You build 300 megawatt reactors. You build four of them in one place. And so you have 1,200 megawatts.
The first one's probably going to come in closer to 4 billion. The second one's 30% cheaper.
The third one's 20% cheaper. The fourth and 10% are cheaper.
And so now you get to a place where it can be cost-effective.
folks can handle it. It's bite-sized. You can end at any time if you don't want to build the third one or the fourth one.
And so you're starting to see a formula that people are getting excited about. Not only are people getting excited about, they're getting excited about U.S. designs, right? Because there's Korean designs and Russian designs and Chinese designs.
And so, you know, our good friends in Canada chose a U.S. design, the G. Itachi, BWX-300. So they're building four of them at Darlington. The folks at Synthos and Poland also chose the design.
there's a lot of lessons learned.
We're following those lessons learned.
So I could go on and on and on an entire podcast about this,
but I would say that in general,
I don't think it's the fault of the environmental groups
or the fault of the nuclear regulatory commission,
which everyone likes to blame or the Simpsons.
I think it's the fault of the nuclear energy industry
to not say, look, you know, modern finance works this way, right?
Modern utility CEOs work this way.
Modern public service commissions work this way.
let's create a product that actually works within the framework that we have in the United States of America.
And they've now done that. So I think we now have a product that people can get excited about.
And you saw the governor of Texas announced that he was directing the Public Service Commission to figure that out here.
And you've seen announcements from Duke Energy and announcements from Dominion and announcements from the Tennessee Valley Authority.
So you're starting to see utilities, you know, say this is actually a really interesting approach.
And so we'll see if it works.
but I think that there's an approach now that's fit for purpose.
Setting three-eyed fish aside and other Simpsons references.
I mean, can you talk a little bit more about how you see it developing?
Like, what are the hurdles to actually getting some of these smaller plants set up?
Can you walk us through what the process would be and how you would imagine it unfolding?
So one of the challenges with the nuclear power industry is that there's no nuclear power industry.
So you have like the Nuclear Energy Institute, right?
and they're made up of a bunch of utility companies
that basically own nuclear power plants.
But if you ask the CEO of like Entergy or, you know, Duke or Dominion
and say, are you a nuclear power person?
They're like, no, we own nuclear power plants,
we own renewable energy power plants, we own coal plants,
we own natural gas plants, right?
And so you can imagine, like, they're not necessarily like the driving force
behind new nuclear, right?
So then you've got a bunch of other companies you've heard of,
like New Scale, Oklo, you know, Giatachi, Holtac, Terra Power, X Energy, right? But they're also
not the nuclear power industry. They are nuclear power designers. So that's like saying,
I have an architect. And that architect designed a beautiful house. Yes, they've designed a
beautiful nuclear power plant. And it works. And, you know, when I say it works, like they've
spent a lot of money at a supercomputer and told me that it works. Right. So like,
it's not like they've actually built one of these things before. So now you've got that.
So then the question becomes, like, who is the industry, right?
And so in the case of the Gattachi BWRX 300, right,
Gattachi is only a design firm.
GE does not make any of it.
They don't, like, all they do is design it, right?
And then they'll probably take it through the nuclear regulatory commission.
BWXT is the company that actually has been hired to make it.
And they are in the nuclear submarine and nuclear Navy business.
And so they make a lot of parts for the military.
And so they have some knowledge of how to do this, right?
And so that's great.
And so they're going to do parts of it.
And then we have to now find an EPC contractor that wants to do this.
Remember, the ones who worked on Vogel went bankrupt, right?
So it's not for the faint of heart for them to decide to get into the nuclear energy industry.
But we're, you know, like aspirational, ambitious folks, right?
And think about it from a national security lens, right?
I mean, once a country chooses a nuclear power plant, let's say from Russia, they're tied to Russia for 80 years.
You can imagine the national security complex for the United States would rather that country pick a U.S. design and tie them to the United States for 80 years.
So there's a lot riding on figuring this out.
So a couple things.
One is that if you're a supply chain provider for a nuclear, so you're making a forge or whatever it is, you can imagine ramping this.
whole thing up for one nuclear reactor is not your idea of awesome. So you're like, well,
where are the 10 reactors going to come from, right? So after I do this one, where's the next one
going to come from? So in some ways, when I say that, like, Duke has put nuclear into their
integrated resource plan and Dominion, you know, the governor has been talking about it. And then
you've got, you know, the Tennessee Valley Authority where Jeff Liesh has talked about, you know,
putting four reactors at Clinch River. And then you've got the governor of Texas, directing the
public service commission to do this stuff. Well, now you've got like a critical mass of
people that are saying we should do this. And then the question becomes, what do you need to go from,
this would be really awesome to do in our state to here's an order, right, for the nuclear reactor.
And so we wrote a liftoff report at the loan programs office and the Department of Energy was
led by Vanessa Chan at the Office of Technology Transitions and the Office of Planer Energy Demonstrations,
which runs the Advanced Reactor Deployment Program.
These are very cool, by the way. I don't normally say this about.
government publications, but these ones are worth a read. I was going to see the exact same thing.
They're all really worth reading, very readable and really good entry points and just to understanding
some of these technologies. So well done on that. Thank you. Thank you. We like kept it down to like 30 pages
or so. And then like it's a, it was a really an extraordinary effort. And then the woman who was a lead off
there, there, Julie Kozaraki is like on a speaking circuit. She's going to all these places and
figuring out how to get this person to move one inch this direction and this person to move one inch
direction. And so there's a lot of facilitation and technical assistance that we're providing
in this process. But the roadmap is there told to us by the industry in that nuclear lift-off
report. So, you know, I don't know whether we're going to get there, but like those are some of the
tenants, right, is you need a design that multiple people pick. You need to at least build 10,
hopefully 20 of them, right? You need to make sure.
sure that the supply chain gets built out. You need to have a trained workforce, right, which we have
13,000 people now that have been trained out of the Vogel nuclear plant. You know, you need all these
pieces in order to attempt this. I just thought of a question, and I've been meaning, I've been
wanting for like two years to do a whole episode on this, and I just never happened. So now I'm
going to ask you this to answer this in one, literally one minute. I read the ISM manufacturing report
every month, and there's this section on things that are in short supply. And as the supply chain has
healed over time, that list gets shorter and shorter. But the most persistent thing that is in short
supply for manufacturers is just electrical components. And they complain about that and it's been this
issue. What is going on there? Do you know what the source of this bottleneck is and what is
driving it? Well, I don't know that I know for certain what the source of the bottleneck is. But I would
say that in general, when you look at manufacturing companies, the dynamic with manufacturing,
manufacturing is if you build it, they will come. Right? So, like, I build a factory and you buy one
piece. And then the next week, you buy one piece. And then you're going to buy a piece. And then
you're like, ah, I think I'm going to wait two weeks. Then I'm going to buy something. Right.
Like, I don't know. That's not like a reassuring, like, model by which I want to stay ahead of
the market. I like to stay slightly behind the market so that, like, I could charge a higher price
and, you know, et cetera. Right. And so for those folks who want us to accelerate investments in the
supply chain, they need to make a long-term order, right? And so for a lot of the electrical
contractors or a lot of the utility companies who are wanting transformers or a lot of these other folks,
that's the one that they always say it is in short-examination. But think about it. If you're running
an electric utility company, do you not have a predictable track record of how many transformers
you install every year? Do you not have like an integrated resource plan that says,
over the next 10 years, I think we're going to buy this many transformers? Well, then why when you just
make an order for like 10 years worth of transformers this week. You and like 10 of your closest
friends. And then you build a transformer manufacturing facility in your community. And then they feel
confident because they've got orders for the next 10 years. And you feel confident because you've got a
local supply of transformers. Instead, I got a bunch of people going, oh, jigger, we need to fix
transformers. And I was like, you should give me an offtake agreement. Oh, I don't know. That seems like
a lot of work. And I was like, but there's a formula to how this stuff happens.
Like, it's not like one of those things where it's like, I wish I had an oversupply of the components that I want.
And I'm not willing to do anything to actually make that happen.
Speaking of bottlenecks, this is kind of a cliched question, but I'd still be curious to get your answer to this.
If you could wave a magic wand and make, you know, one aspect of the industry or the political landscape or the regulatory landscape go away to make the process of transitioning.
to cleaner, cheaper energy better?
What would it be?
Oh, gosh.
This is definitely going to get me in trouble.
So maybe let me say it this way.
I think in general, as I've said before,
we have all the technologies we need
to not only tackle this problem,
but dominate not only the sector here,
but then to export and dominate around the world.
Like whether it's hydrogen or transmission
or whatever it is,
solar, wind, all these other things.
We have all those technologies, and frankly, we invented them.
Everyone's like, oh, China makes solar panels.
We invented all that technology, right, along with Martin Green at the University of New South Wales.
And so, like, you know, those are the two places where all came from, right?
We were forced to license it to them because, you know, like we weren't manufacturing in here.
And so one of my big challenges is that as we learned to build again, what we did in the 1970s
is basically divorce all politicians from knowledge in this area.
Right?
So all politicians basically have like an airport authority.
It's very diplomatically put, by the way.
Right.
And they have like a sewer authority, an electric utility and a, you know, whatever it is, right?
So when you ask them like, hey, how do we lead in this area?
They don't know, right?
And so they go to the guy who runs the sewer authority or the water authority or the, you know, airport authority.
And that person says, I want to do things exactly the same way as my grandfather did in the 1970s, and we should replace everything exactly the same way. I don't want to install new technology. I've already got people who are trained in the old technology. Right. And so why do we do this stuff? Right. And so we need to like come back together and commit ourselves to actually taking U.S. technology and deploying it here. Right. And the risk aversion is like leading to a lot of increased cost. Because doing things the same way as 1970s.
is crazy expensive. We have stuff that's 90% cheaper. But what happens is you go to the
consultant who you pay and they say, I don't know if that's going to work. I don't know.
I know it's been deployed like 40 times in China and 50 times in the Middle East and like in Europe,
but I don't know if it's going to work here. We should do exactly the same thing we did in
1970s. And so it'd be nice to like figure out how to break that like sort of knowledge gap so that
We're doing stuff here again.
One last question.
You know, it's kind of, it's an exciting time, and it's fun.
It feels like every day or at least every week, there's some new announcement.
Some of it comes from loan program office funding, like some new battery factory or some new
technology or breaking ground on some new geothermal, et cetera.
So much winning.
So we're getting tired of all the winning with all this.
But like, 2024, like what is, what are we looking for?
Is 2024 going to be another year?
where there's just like tons more in the pipe and we can expect a lot more out of your of all these
announcements is there a lot more coming there is a lot more coming some of which is predictable right
you got the hydrogen hub's announcement coming out later this year you know you've got um uh the grip funding
for like grid resilience coming out here pretty soon and so some of it's predictable some of it's not
predictable because like all the folks who've applied to my office are confidential but you know i think
that the part that is the most exciting to me is that you're starting just starting to get mayors
and county commissioners and others going wait a second how do we make our town or our county
attractive to the next announcement right and so like you know we have like i think less than
one percent vacancy rate right now in industrial properties um and so if you talk to brokers they're
like we have no more properties left i have like four applicants
who are waiting to pick a site.
And that's what's holding them up
to actually make an announcement, right?
But then, like, I talked to this guy in Ohio
and he's like, oh, yeah, I have, like, five sites.
We just forgot to, like, rezone them
and we forgot to re-register them this way.
And so now he's doing that.
And that property doesn't actually earn any property taxes right now
because it's classified as a brownfield.
They, like, are cleaning it up,
putting it back into circulation.
And, like, you know, folks can pick it
And then they can put jobs there and also their stuff.
It's one of those weird things in the United States where, like, we have all this extraordinary wealth, right?
A wealth of innovation, wealth of like engineering talent, applied engineering town, all this stuff.
And like, we forgot about some of it.
It's like just there.
It's sitting there.
And like, so like there's all these pieces that we have to get out.
So part of what's going to make next year so successful is not just the announcements around, you know, the funding opportunities and that kind of stuff.
but also all these micro decisions that are being made by local towns and communities going,
wait a second, you're saying that that piece of property that's just been sitting there is actually
like an asset?
Yeah, it's an asset.
Like clean it up.
Let's put it back into use.
Like they have a rail spur that goes to them.
There's actually on the river.
People want to like use that so they can transport their goods.
They're like, oh man, I thought that was just an eyesore in our town.
And so like that to me is super exciting, right?
And then we're starting to get a ton of people who are saying, maybe I don't have to go to a four-year college.
And maybe I can go to Texas State Technical College and do a two-year degree and make six-figure income, like, actually becoming really good at my trade.
And also the stuff.
And that's bringing pride to people.
Because for a long time, people were like, I like to work with my hands.
Right.
That was like a euphemism for I wasn't like a book person.
But like we actually need a lot of people who want to work with their hands, right?
And so, like, I find that what's most exciting is not the announcements we're making here,
but, like, it's leading to a level of confidence in all these other parts of the economy
where people are like, maybe we can't actually pull this off.
Jigger Shaw, thank you so much.
This is a real thrill.
Always love catching up.
Great.
No, Dan, Don.
Thank you to everyone, Texas Tribune Fest, and appreciate everyone coming out.
That was our conversation with Jigger Shaw.
I'm Joe Wisenthall.
You can follow me at the stalwart.
And I'm Tracy Alloway. You can follow me at Tracy Alloway. Follow Jigger at Jigger Shaw, D.C. Follow our producers, Carmen Rodriguez at Carmen Armin and Dashel Bennett at Dashbot. And a special thanks to Moses Ondom. Follow all of the Bloomberg podcasts under the handle at podcasts. And for more Oddlots content, go to Bloomberg.com slash Oddlots, where we have a blog, we post transcripts, and we have a newsletter. And if you enjoyed this episode and you want to chat about it with fellow listeners,
go to Discord.g.g.
We have an energy room. We have a climate room in there.
Lots of fans of Jigger in there.
So people will be discussing this one for sure.
And if you enjoy Oddlots,
if you want us to do more episodes, for instance,
on the future of the nuclear industry or lack thereof,
then please leave us a positive review
on your favorite podcast platform.
Thanks for listening.
This is Tom Keen, inviting you to join us
for the Bloomberg Surveillance Podcast.
It's about making you smarter every business day.
I'm Paul Sweeney.
We bring you complete coverage of the U.S. market open.
We cover stocks, bonds, commodities, even crypto, all the information you need to excel.
And I'm Alexis Christophores.
Bloomberg Surveillance also brings you the analysis behind the headlines.
We do that through conversations with the smartest names in economics, finance, investment, and international relations.
We do all this live each and every weekday, then bring you the best analysis in our daily podcast.
Search for Bloomberg Surveillance on Apple, Spotify, YouTube, or anywhere else you listen.
On the East Coast, listen at lunch.
And on the West Coast, listen as soon as you wake up.
That's the Bloomberg Surveillance Podcast with Tom Keene, Paul Sweeney, and me, Alexis Christophores.
Subscribe today, wherever you get your podcasts.
Bloomberg's Surveillance, Essential Listening, each and every business day.