Odd Lots - Lots More on America's Electrical Components Crisis
Episode Date: April 12, 2024In 2021 and 2022, the US economy experienced historic shortages of many different goods. All kinds of consumer, construction, and high-tech components were tough to come by. Since then, most of these ...shortages have eased or gone away, but there is one category that is still struggling to meet demand: electrical components. Years after the height of the pandemic squeeze, there are still complaints about missing transformers and switchgears, which are crucial for connecting new construction developments to the power grid. So what's going on and how much is this shortage messing up economic activity? On this episode, we speak with commercial real estate developer Chris Hatch, partner at Forza Development, about how the situation is hurting his business. He talks about projects that are entirely finished — except for this one necessary component. We walk through the causes of the problem and how costly the delays are proving to be.See omnystudio.com/listener for privacy information.
Transcript
Discussion (0)
Bloomberg Audio Studios.
Podcasts, Radio News.
What's up, Chris?
It's Joe.
Hi, how are you today?
Hey, Chris.
How's it going?
Hi, Tracy.
How are you today?
I'm good, thank you.
I'm sorry we kept you waiting.
I saw your tweet.
No problem whatsoever.
I was just giving you guys a hard time.
So, Tracy, we're back with our favorite Dutch bros.
The bro of Dutch bros.
The bro of Dutch bros.
I did a deadlift.
One, two.
Two, three.
Hedemite.
Okay, go.
What's the?
Gemini.
Barges.
This is an after-school special, except...
I've decided I'm going to base my entire personality going forward on campaigning for a strategic pork reserve in the U.S.
Where's the best with impostin?
These are the important questions.
Is it robots taking over the world?
No, I think that, like, in a couple of years, the AI will do a really good job of making the oddlots podcast.
And people will say, I don't really need to listen to Joe and Tracy anymore.
We do have...
Cha-ching.
The perfect guest.
Welcome to lots more
where we catch up with friends
about what's going on right now.
Because even when Odd Lots is over,
there's always lots more.
And we really do have the perfect guest.
Chris Hatch, we talked to him several weeks ago
about opening up drive-thrus,
but Chris, what are you up to these days?
Yeah, just continue to try and build buildings
and figure out how to get some of the stuff
out of the ground
and get these projects built and constructed.
It seems like it just grows harder every day,
more and more challenges.
So, yeah.
So, Tracy, we've talked about, like,
almost every supply chain crisis under the sun
over the last three years.
But there's one thing,
it's been in shortage for 42 straight months,
according to the ISM,
and that is electrical transformers in parts.
We've never talked about that.
You finally get to do your Transformers episode.
Chris, what's a transformer?
In the electrical...
Sorry, I guess.
I have a six-year-old son, and we talk about Optimus Prime.
And Megatron basically nonstop at my household.
The Louvito album.
Yeah.
But what does it mean when you're trying to build a new Starbucks or Dutch Bros.
location off the side of a highway in Texas?
Let's use Utah if that's okay.
And mostly just because it's easier, there's less power companies in Utah.
So starting with Rocky Mountain Power, who supplies the power for probably 80% of the state of Utah.
there are a few cities they have the power company.
There's a different power company, Southern Utah.
You have kind of the main grid.
So think of that as like, you know, basically the main power supply that's going into a huge city.
And so once you come off of the grid, the first place the electric comes to is a transformer that sits on your site.
And the easiest way to think of it is this is kind of, it's a green typically or blue or some kind of kind of darker landscape colored cabinet that sits in the landscaping area somewhere.
usually three, two or three feet tall, maybe sometimes four or five feet tall, about three or four
feet square. And that's where the power comes in from the power grid to your site. So that is
a transfer. Got it. So Joe finally gets his transformer episode. I think he's been tweeting like
religiously every time the ISM survey comes out where they're talking about the shortage. But is it
at all common for transformers to go through periods of scarcity?
or has what we've seen over the past couple years now been unusual?
Yeah, that's a great question.
Definitely during the kind of over the last four years,
let's just call it kind of the post-COVID world,
we've definitely seen some real strains on the supply of transformers into the world.
At the moment, with at least the type of buildings that I'm building,
the transformers actually aren't the longest lead supply item.
So that's the first step of where the power comes off of the line.
and it's actually the switch gear.
That's the problem right now today
is that there's these massive delays
with switch gear
that are going in the United States right now.
What's switch gear?
So power comes in from the grid
to the transformer,
from the transformer to the meter,
which makes sense.
That's what the power company comes and reads
to determine how much power you use in a month.
And then from the meter,
it goes to the switch gear.
The switch gear is where the power comes to your building.
So this is usually
cabinetry that sits flush
or on the back of the building or one of the sides of the building most of the time.
And that is, you know, in the example that I've got of a building that we are done building
the building in West Valley City, Utah, I need a 1600-amp switchgear piece.
So that electrical supply is enough to power 1,600 amps going into the building.
So from the switch gear, then the power gets distributed to the panel in each individual
tenant space.
Wait, so when we say there's a shortage of transformers or switchgears or whatever, what do we actually mean here?
Is it that you can't get them so the problem is your lead times expand or the problem is there aren't enough of them to satisfy demand?
And so prices go up maybe to a prohibitive point.
Maybe to start with my specific example, I originally ordered my switch gear a year ago, April of 2023.
I was told that there was a one-year lead time, which felt like an exorbitantly long time.
That's longer than, you know, the lead times kind of were building over the last three or four years,
but that was the longest we had heard up to that point.
So we set a schedule with my contractor to have the building more or less complete right in April of 2024
so that the switch gear would then arrive and we could power up the building,
and then the tenants could step in and do their individual buildout.
The problem is that four weeks ago, for the first time, the supply house called my electrician,
who called my general contractor, who called me and said, it might be up to one more year.
What does that cost you?
Yeah.
Because you have to finance this.
So it's like, you're built.
Can you tell us what, what's being built here?
Is it another Dutch bros or Starbucks or something?
It's a great question.
This is a four-tenant building.
It's all restaurants.
Cafe Rio is a Mexican grill with a drive-thru.
Marcos Pizza, Chip, which is a cookie company, and Jersey mics.
So what happens when your general contractor or whoever it is gets the call from the electrician,
like, okay, you got to wait another year?
You don't just drive to Home Depot and buy one of these parts.
They don't exist.
So you really have not a lot of great options at that point.
And so it's been interesting because most of the people that are sitting in my seat as the developer
have no idea what to do.
And I mean, I have talked to probably two or three hundred developers over the last two months.
You know, month, as soon as this problem became real,
I've just started calling every peer I know in the space anywhere
trying to figure out how I can solve the problem.
And I would tell you that at least half of the people I've talked to
are building buildings with a very similar power requirement to mine.
And they're not as far along in the process as I am.
And they're kind of content because they're like, well, we don't have that problem.
Our switchgear is supposed to be here on this day.
And as I've dove in further, 100% there is a big problem.
It's not just me.
It's not some micro issue for Chris Hatches building.
This is a massive issue that's impacting the whole, you know, all of North America, really.
There should be more switchgear sympathy in general.
But, okay, I get that this is incredibly frustrating for you and, you know, waiting a whole year for something
and then being told that actually it's going to be another year is kind of crazy.
But in terms of the actual financial impact, who does that fall on?
Is it you as the developer or is it like the retailer, Dutch brothers or whoever who might have pre-leased that space?
Yeah. In this case, it is the developer that's going to take the brunt of that impact.
So it's the developer being me and my investors that are in the building.
the good news is we built in a few line items and contingency line items.
You don't necessarily hope to burn through all the contingency line items.
And it's hard for me to guess when the switchgear is going to arrive
or when I'll be able to source it through an alternate means.
If I just look at the one year out and we sit with this building,
my contractor, by the way, finished the entire building two Fridays ago.
So they're done with the site.
There's nothing left for them to do on the building until the switch gear gets here.
So there's this whole complete building.
that would otherwise be totally ready for the Mexican restaurant and the pizza restaurant,
etc., to move into.
And the one thing that's preventing it is this part that could still take another year.
Yes.
And, I mean, we're not doing anything crazy here.
We're trying to serve the world, you know, tacos and pizza and cookies and sandwiches, right?
Yeah.
You know, and so if I just sit for one year, you know, first off,
I'm going to have to go extend my loan with the bank for sure because I don't think I have a full
year of time. But if they allow me to continue on it, more or less the same terms I'm at today,
my dead interest carry, just my just my interest expense for holding the building for a year,
it will be $158,000. Wait, I still don't understand. Like, why do we have the shortage again?
Can you maybe expound on that a little bit more? Like, what is the bottleneck here exactly? So,
okay, switch gears, sure, but like, who is making these things? Yeah. Sure. So if you think
of it in terms, if you start looking at it through first how the contracting typically
works, a developer contracts with a general contractor when he goes to decide to build a building
and the contractor is going to build that building for them. The contractor then signs up subcontractors,
one of which is an electrician. The electrician then signs up through a supply house and order
that's going to get filled, you know, and what they're filling is whatever the developers,
you know, electrical engineer had specced for the building, right? So in this case,
It's the 1600-a-amp switch gear and then, you know, my five panels that I've ordered.
And so he's ordering that through a supply, he or she's ordering that through a supply house.
And then occasionally a supply house orders through a larger regional supply house.
And then the regional supply house then orders from the manufacturer.
Right.
So I have full steps, but that's kind of how the contracting works.
That was literally just a description.
That was the, you just walked us through the supply chain.
Okay, keep going, but that was fantastic.
Yeah.
Right. So the real problem that exists here is that there's more or less five big manufacturers of all of this electrical gear.
So whether you're talking about the panels or the transformers or the metering equipment or the switch gear, all of it.
It's all coming more or less from five big manufacturers.
Siemens Eaton, Cutler Hammer, Square D, and then GE sold off recently their unit a couple years ago, and I can't remember the subsidiary that they sold it to.
But those five provide the electrical components.
When your developer talks to the electrician or the electrician talks to the supply house or the supply house talks to the regional supply house talks to the manufacturer, do they give you a reason?
Do they say what's going on?
Or do they explain why, hey, we told you it was going to be April 2024 and now it's going to be April 2025.
Do they give you some sort of excuse?
Or, yeah, can you call them up and complain?
Can you be like an electricity Karen or something?
Like, what do you do?
Yeah, there's not much recourse.
I mean, that's the downer.
It's an interesting world, and I don't know why it is exactly.
And Joe, you and I were tweeting about this or DMing about this before the show.
But for whatever reason, anytime you deal in electrical, electrical is hand in hand with mansplaining.
It doesn't matter what you do, somebody's going to mansplain you how you're wrong.
And so even this podcast episode will come out, and hundreds of people will mansplain how you said something.
Tracy or yeah it just I'm sure though mansplained to me I'm not if if a guy explains
transformers to another guy does it count as mansplaining then it's just explain yeah it's just explaining
yeah it's just explaining in a gender new term what do they tell you what it's the what's the what's the how
they mansplain it to well and that's the interesting thing it's it's you know I so I started calling
through I started with my electrician then I went to my supply house and I quickly realized my
supply house we have two supply houses in the state of Utah and they're
both too small. For the vast majority of their orders, they order through a regional supply house.
They don't order direct from the manufacturers. And so that's not a very good position to be in.
And so I started, I went to Twitter. I went to LinkedIn. I went to colleagues. I started pushing
this message out. And since then, I have spoken to somewhere around 100 people that have told me they
have a guy or they have somebody that can source the materials that, you know, what I need, the switch
gear. And I've been on the phone with them. And a lot of those.
folks were the regional supply house contacts. And here I had to try to not lose my cool because
multiple times I was talking to somebody at the regional supply house. And my particular order is for
a Siemens switchgearboard. And so the regional supply house person would talk to me and say,
well, give me your, you know, give me your spec, send them all over to me. I'll call the manufacturer.
I'll find out where you are in the order process. And then I'll call you back and tell you if I can
move you up and then what it will cost us for, you know, for the fee to move you up. And you have to
kind of not lose your mind right there because you're looking at your supply house saying,
why couldn't you move me up? Are you not, you don't have the capabilities, you don't have the
buying power? For what reason can you not get this faster? Why do I have to go through this alternate
path to go somewhere else? And, you know, it's really just a buying power thing, you know,
and so this is kind of assessing the problem. So I've spent
30 days figuring out what the problem was. I feel like I've at least come to some version of a
conclusion of what this is. And I don't, I'm not some end-all expert. I have no idea. I went to,
you know, college and I studied finance. I didn't study electrical supply chains. So,
nor do I totally understand how electrical systems work. I just know that I have a building, you know,
that's burning and I've got a lot of interest carry every month. And so now I'm trying to come up
with alternate solutions for how to get my electrical on site.
Part of me is amazed that it's now 2024, and we are still talking about shortages that are this impactful.
So, Joe, I remember when we spoke about, you know, residential real estate, we would talk about the idea that maybe there's like a sink missing or something in 2021 or even early 2022.
But it is the persistence of this particular shortage is kind of mind-blowing.
Yeah, I imagine when you were building buildings like in 2026.
I assume, like many others, you had multiple shortages of things. Like, is that the case? Like,
was there a time when, like, you know, like everything was in scarcity for you?
Yeah, 100%. And then what is, like, so do any of these people that you get on the calls,
like have an explanation for why this particular supply chain hasn't caught up?
Not really great. And so that's had to, I think I've had to really do a lot of homework in
other areas to figure out what the problem is. But when you start to think through it logically,
it does start to make sense. I mean, think about the amount of electrical vehicle charging stations
that have come into the country just over the last couple of years here. Think about the amount
of data centers that are going in. Think about what the amount of energy requirement has increased
just with the invention of, you know, like chat GPT, for example, right? And AI. And think about all
of that is requiring power. You have solar farms going in left and right. I mean, all of this
stuff ultimately all has electrical components. And there are five major manufacturers that produce
all the electrical components. And so I think it literally is just a product through the system
problem. And I think to totally understand that, you would probably need to get somebody on the pod here
from one of those manufacturers. By the way, Tracy, you know, obviously we touched out some of the stuff
recently with our episode of Steve Eisman, like some of these like old school industrial players
that went to the moon, I just looked up Eaton, which I don't think had come up on a previous
episode is one of the names we talked about. That is another stock that basically looks like
in Vidia right now when you look at it. Here is this like sleepy stock from a few years ago.
And then now in this great electric era of electrification, that is like another stock that has
gone absolutely to the moon. It is truly remarkable that there are those sort of old school
companies out there. I mean, tractor supply is another one, but these businesses in the business
of doing these old-fashioned things that look like semiconductor stock charts. Yeah, it's really
remarkable. So, Chris, you posted on Twitter, you're like, someone just goes start a electrical
components factory in Mexico. You get upset up. Did anyone take you up on that offer? Is something
going to get built to expand this capacity that you know of? There are a number of people that are
trying to figure it out. I would, you know, the obvious statement here is that when Siemens is one
of the companies that you're competing against, or I mean, I don't know, you've got the stocks in there,
I'm not sure what the market cap is on Eaton. None of these are small companies, right? So I think
there's pretty good fear from those that are in the manufacturing space that they are concerned about
how do we actually? Eaton is a $139 billion company now. Oh, no, sorry, wait, Simmons is a $139 billion company.
Eaton is just a, oh yeah, it's $125 billion.
Yeah, so these are massive companies we're talking about.
Right.
So the concept that you're just going to walk out, you know, and grab a P.E. firm that's worth, you know, $20, 30 billion ago just compete head-to-head against these companies is a little bit intimidating, I'm sure.
What is interesting is the reason I referenced Mexico is because one of the possible solutions that's come forward here on our building and one of the paths I'm actually going down is we have.
have a friend that runs some factories in Juarez, and I got on the phone with his engineer that
runs his five factories. They have like six or seven thousand employees, a whole bunch of people
that work for him there. And so these are very large facilities. I got on with his engineer,
and his engineer reached out to his electrician, and we have actually sourced the exact same
semen spec item that's going to come from a Mexican supply house that is supposed to deliver in
eight weeks from today. Oh, well, this is like, I was, this was going to be my concluding.
thought, which is that in any business, a delay is awful and costly. But it feels like when interest rates are as high as they are right now, it just sort of compounds the crisis. And so, like, obviously eight weeks versus a year is always going to be like a massive difference for anyone in business. But with interest rates high, it really is striking the degree to which these sort of like supply chain constraints and high interest rates are like these like interlocking problems that compound each other.
Yeah. My concern is I have no idea if this is going to show up in eight weeks.
So here you are, you're setting off a wire for a substantial deposit for these units,
and you have no idea if this is going to show up any faster. At one point, I was told 12 months.
I know we got to 11 and a half months, and then I was told maybe 12 more months could be longer.
Don't know. And so, you know, it's just such an unknown world.
One of the other things that's causing some constraints on the supply as well.
So, Trace, you asked the question about what's causing the problem.
The factories is just a throughput issue, I think.
But then on top of that, you have a number of tenants that have identified that this is a big problem.
And so if you're in hyper expansion, we started talking about Dutch bros.
If you're in hyper expansion, it's the same switchgear to build the Dutch bros,
whether you're in Arkansas or Florida or Texas or Utah or wherever else you are.
So companies like that are going out and buying 50 and 100 switch gears at a time.
And then they basically what they do is they sell me as the developer a switch gear when we're ready for the switch gear.
It's crazy that you have to switch gears because of the switch gears.
Just saying.
Yes, exactly.
And then there's this whole other world.
There's this whole other world of people.
These are a lot of the mansplainers for sure.
There's this whole other world of electricians that have seen this problem coming down, you know,
the line here. And what they've been doing now is basically buying parts opportunistically over the last
24 months. And so my switch gear in West Valley is $62,000. That's what it cost me to order it
through from Siemens. And then there's markup to the supply house and everybody else involved.
But the actual unit costs $62,000. So that unit, I have been getting quoted. There are people who
are building these and they're kind of Frankenstein switchgear boards because they're basically
piecing anything together they can find to make a work. And they're piecing those together,
and you can usually get the power company to sign off on them. The cheapest I've seen out of those
folks is 3x, so three times my cost. Well, I hope you get your switch gear in eight weeks from now.
Switch gear and gear. Keep us updated on the journey. Lots more is produced by Carmen Rodriguez
and Dashel Bennett with help from Moses Ondom and Kale Brooks. Our sound engineers,
Blake Maples. Sage Bauman is the head of Bloomberg Podcasts.
Please rate, review, and subscribe to Oddlots and Lots More on your favorite podcast platforms.
And remember that Bloomberg subscribers can listen to all of our podcasts,
add free by connecting through Apple Podcasts.
Thanks for listening.
