SignalsAZ.com Prescott News Podcast - Flagstaff Road Repair Project

Episode Date: April 27, 2026

Send us a text and chime in!The City will begin the 2026 Road Repair and Street Safety (RRSS) Project Phase 1 the week of April 27. The project will address numerous roads around the City and will inc...lude crack sealing, chip sealing, asphalt overlay, patching, curb, gutter, sidewalk, and pavement marking. The goal of the project is to update infrastructure for motorists, pedestrians, and cyclists. The public should expect intermittent traffic impacts, including short delays, and minor backups, on portions of the routes listed below. These impacts are expected throughout the project, which is scheduled to be completed in the fall of 2026. Woodlands Village Boulevard...   For the written story, read here >> https://www.signalsaz.com/articles/flagstaff-road-repair-project/ Check out the CAST11.com Website at: https://CAST11.com Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZFollow Cast11 Instagram at: https://www.instagram.com/cast11_podcast_network

Transcript
Discussion (0)
Starting point is 00:00:00 Text-to-speech audio articles made possible on the Cast11.com podcast network by Fane Signature Group. The city will begin the 2026 road repair and street safety, RRS, Project Phase 1 the week of April 27th. The project will address numerous roads around the city and will include crack ceiling, chip sealing, asphalt overlay, patching, curb, gutter, sidewalk, and pavement marking. The goal of the project is to update infrastructure for motorists, pedestrians, and cyclists. The public should expect intermittent traffic impacts, including short delays, and minor backups, on portions of the routes listed below. These impacts are expected throughout the project, which is scheduled to be completed in the fall of 2026. Woodlands Village Boulevard
Starting point is 00:00:47 Marketplace Drive Switzer Canyon Drive Downtown, Columbus Avenue, Aztec Street Zuni Drive Boulder Point, Cliffview Street, Nata Street, Needle Street. Highway 89. Industrial Drive. Country Club, Coulter Drive, Burning Tree Loop, Abano Canyon Drive. Astro Lane slash Apollo Way.
Starting point is 00:01:14 Canyon View Drive, Circle View Drive, and Clearview Drive. George Street Coquanino Estates, Hopi Drive, Paiute Road. University Heights, Debbie Street, Coy Drive, Dolores Lane. Lutzeron Circle. Lockett Road. Aztec Street Dodge Avenue
Starting point is 00:01:35 The city is committed to repairing and improving streets in Flagstaff and keeping residents informed on the status of the project. For additional information regarding this or other projects associated with the RRS improvements, visit Flagstaff.orgas.gov slash road repair or contact the city of Flagstaff Public Works Division at 928, 213, 210. Read more stories from the mountain cities on signals aZ.com. and be the F-1 RST 2-0.

There aren't comments yet for this episode. Click on any sentence in the transcript to leave a comment.