SignalsAZ.com Prescott News Podcast - Peoria Begins Major Lake Pleasant Parkway Transportation Project

Episode Date: December 30, 2025

Send us a text and chime in!The City of Peoria has begun a major transportation improvement project along Lake Pleasant Parkway, from Loop 303 to approximately 1,000 feet north of the Central Arizona ...Project Canal. This project will widen Lake Pleasant Parkway to three lanes in each direction, improving traffic flow, safety, and long-term mobility in one of Peoria’s fastest-growing areas. This project also includes the following infrastructure upgrades: A widened bridge over the CAP Canal New bike lanes, sidewalks, curb, and gutter Streetlights and enhanced drainage improvements Extension of water, wastewater, and reclaimed water systems Utility interconnects, dry utilities, and landscaping within a raised median... For the written story, read here >> https://www.signalsaz.com/articles/peoria-begins-major-lake-pleasant-parkway-transportation-project/Check out the CAST11.com Website at: https://CAST11.com Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZFollow Cast11 Instagram at: https://www.instagram.com/cast11_podcast_network

Transcript
Discussion (0)
Starting point is 00:00:00 Text-to-speech audio articles made possible by Cast 11 Talking Glass Media. The city of Peoria has begun a major transportation improvement project along Lake Pleasant Parkway, from Loop 303 to approximately 1,000 feet north of the Central Arizona Project Canal. This project will widen Lake Pleasant Parkway to three lanes in each direction, improving traffic flow, safety, and long-term mobility in one of Peoria's fastest growing areas. This project also includes the following infrastructure upgrades. a widen bridge over the cap canal, new bike lanes, sidewalks, curb, and gutter, streetlights and enhanced drainage improvements, extension of water, wastewater, and reclaimed water systems.
Starting point is 00:00:45 Utility interconnects, dry utilities, and landscaping within a raised median. As part of this project, construction is also underway on Encoreway, a new roadway connecting Lake Pleasant Parkway to 96th Avenue. This project is the first infrastructure project as part of the Peoria Innovation Corps, PIC, a partnership with the Arizona State Land Department that allows Peoria to lead the land planning efforts. For project updates, timelines, and traffic information, visit www.com or call the project hotline at 602-532-6250. Read more stories from the Phoenix area on Signalsaz.com. Be in the know with the F1RSD2 No Ultimate holiday guide.

There aren't comments yet for this episode. Click on any sentence in the transcript to leave a comment.