In their early days, data centers were largely welcomed by communities who saw their arrival as an economic boost. Today as concerns around noise levels, power prices, water use, and AI grow, they fac...e fierce opposition. In this episode, Shayle speaks to Brian Janous, co-founder and chief commercial officer of Cloverleaf Infrastructure. Together, they unpack the data center backlash and  explore how the industry can approach the problem differently. Shayle and Brian dive into specifics like: - Communities’ shift from “red carpets to pitchforks” on data center development - How misleading information about data center energy and water usage has led to the AI sector losing the public relations battle  - Distinctions between data centers’ micro-level benefits and macro-level price inflation on power grids - The potential, and pitfalls, of "bring-your-own-capacity" and behind-the-meter generation - The viability of taking data centers off-grid, off-land, or off-planet - The emerging market for distributed edge compute facilities Resources: - Catalyst: When to colocate data centers with generation - Catalyst: Explaining the ‘Watt-Bit Spread’ - Open Circuit: The off-grid data center fantasy - Open Circuit: Utilities are in the crosshairs of the data center backlash - Latitude Media: In Indiana, an anatomy of data center opposition Credits: Hosted by Shayle Kann. Produced and edited by Max Savage Levenson. Original music and engineering by Sean Marquand. Stephen Lacey is our executive editor. Catalyst is brought to you by EnergyHub. Peak season puts every grid to the test — and the utilities that pass are the ones that built flexible capacity before they needed it. EnergyHub works with more than 170 utilities to coordinate 2.5 million devices and 3.4 gigawatts of dispatchable flexibility through a single platform designed to perform when it counts most. See what that looks like at https://www.energyhub.com/ Catalyst is brought to you by Bloom Energy. Bloom Energy fuel cells deliver affordable, ultra-reliable onsite power for hospitals, utilities, and data centers – at speed and at scale. Learn more by visiting BloomEnergy.com. This episode of Catalyst is brought to you by ENGIE, the smarter energy supplier. ENGIE doesn't just provide the power to run your business — they supply the energy to move it forward, with reliable, flexible solutions built for what's next. Learn more at engieresources.com.

Transcript
Discussion (0)
Starting point is 00:00:02 Latitude Media covering the new frontiers of the energy transition. I'm Shail Khan. I lead the early stage venture strategy and energy impact partners. Welcome to Catalyst. So you already know that the data center backlash is real. I think the question worth asking is whether it's the kind of thing you can actually fix, at least in the near term. Because I think there are two separate issues kind of wearing the same jacket. One is a set of specific negotiable grievances, some of which are, highly warranted. This substation upgrade that has a cost on electricity rates, that water draw, this rate case, this worry that residential customers end up subsidizing a load that showed up
Starting point is 00:00:43 overnight, pollution effects, all sorts of things like that. Those, you know, you can solve by doing it right. Cited differently, pay for the upgrade, structure of tariffs, so the big load carries its own cost. The tools exist, and the industry, I think, is starting to get better at using them. But the other one maybe isn't really negotiable, at least not at the individual level, because it's not really about that data center. It's about AI and the company's building AI. And that issue would be there, even if the facility drew half the power, lowered rates, never touched the water table.
Starting point is 00:01:18 You can't re-design your way out of a values fight. So where does this go? When developers can't get a yes, if we hit a ceiling on our ability to build new large-scale data centers on the grid, Do they stop asking the community and start building their own power behind the meter? Do they go small? Do they go off grid? Do they go off planet?
Starting point is 00:01:40 Honestly, all of these are pretty clearly suboptimal, but right now, I think suboptimal is not a dirty word in this industry. And so I don't think we could say how much of them will happen. Does this get worse before it gets better? And what should data center developers do differently, if anything? This is an interesting set of questions right now, and it is basically going to dictate. the future of power in this country to a large extent. So let's talk through him. My guest is my good friend, Brian Janice. He's been on the show a bunch times before. Brian is the co-founder and chief commercial officer of Cloverleaf Infrastructure, which just a couple weeks ago announced a big
Starting point is 00:02:17 partnership and investment from NVIDIA. Congrats to Brian on that. Really good conversation. It's coming up after the break. In May and June alone, millions of thermostats, batteries, and EVs across North America shifted energy during peak periods, quietly becoming one of the most powerful resources on the grid. Energy Hub builds and operates virtual power plants or VPPs that turn 2.5 million customer devices into 3.4 gigawatts of dispatchable capacity. That's the equivalent of more than three nuclear reactors worth of flexible, clean grid capacity, coordinated from customers' homes. Learn more at energy hub.com. For data center developers, power availability is the defining challenge, but it's not the only one.
Starting point is 00:03:08 Today, growth also hinges on earning a community's trust. Bloom Energy solves for both. Bloom's fuel cell platform delivers on-site power for the digital age, sustainable, reliable, and scalable from tens to hundreds of megawatts. Bloom generates electricity without combustion, meaning lower emissions, minimal water use, and quieter operation than conventional solutions. That's why developers and utilities turn to Bloom to power their operations,
Starting point is 00:03:34 and you can learn more at bloomenergy.com. Catalyst is brought to you by NG. Your business has enough challenges. Energy shouldn't be one of them. That's why NG builds tailored energy solutions around real business needs to support growth, strengthen predictability,
Starting point is 00:03:50 and move businesses forward. Because real power comes from shared expertise and relationships that outlast the paperwork. Learn more at NG Resources.com. That's E N-G-I-E-N-G-Risorses. com. Ryan, welcome back. Thank you.
Starting point is 00:04:11 Excited to be back. All right. So the data center backlash is here. It is real. It's substantial. It is mainstream news, literally, every single day right now. You've been involved in developing data centers for, what, 13, 15, something, like a long time, right? More than 15 years, probably.
Starting point is 00:04:31 I think I worked on my first data center project. in 2006. So maybe that's 20 years. Yeah, okay. Wow. All right. So 20 years. Paint me the really quick picture in your perspective of how we got here. Like, why did we land in this place where there is this absolutely enormous upwelling of opposition? Yeah. So it's interesting because, you know, we've been building data centers at some scale for 20 years in this country. Even a few years ago, you know, you were getting the red carpet rolled out for you when you'd go meet with communities and cities. And we've somehow, in a relatively short time, dawn from red carpet to pitchforks, you know, and it, and it wasn't, there wasn't
Starting point is 00:05:13 even like a whole break in between. You know, it was really fast. And so I think there's a number of things going on. I mean, one, of course, like what we're building today is much bigger, you know, in one fell swoop than what we built 15 years ago. Now, if you look at places like Quincy Washington, for instance. Microsoft probably has close to a gigawatt of data centers in Quincy Washington. I don't know the exact number, but it's got to be sort of in that ballpark. But it's happened over a period. I think they built that first data center in 2007, right? So almost 20 years, you know, they've gone to a gigawatt. And there was a fantastic story just in the last week about Quincy Washington building a $15 million aquatic center,
Starting point is 00:05:54 and they have a $150 million state-of-the-art school. And their unemployment rate has gone from like 29% to 6%. You know, so they've been. over a period of 20 years to experience substantial benefits from this. But when you come in and say, well, I'm going to build what they did in 20 years in 18 months, you know, clearly there's a larger target because then you start going, well, how much water is that? How much power is that going to be? And so some of it is just the scale that we're doing. It draws a lot of attention, understandably so. Some of it is some extrapolations that people were doing around, well, if this old data center uses X amount of water and I take that times 100,
Starting point is 00:06:38 then it's 100 times that. But of course, it doesn't take into account the fact that the technologies change substantially, and we're not using the same types of cooling systems that we did back then. We're using largely closed-loop systems because of the heat rejection that's necessary. So some of it is just a, I think, a misprose. of how much water these things actually use. And if you look at the actual facts, like the data center do not use that much water
Starting point is 00:07:01 relative to, you know, fill in the blank, almonds, avocados, golf courses, you know. Chemical plants, power plants. Yeah, right. And I find that one even ironic too, because if, you know, if you were coming to a city and say, hey, we're going to build a new factory and we're going to bring all these jobs,
Starting point is 00:07:17 everyone's, you know, rolling out the red carpet again. It's like, but that factory is going to use more water, likely have more emissions, you know, have more externalities than a data center would. But, I mean, unfortunately, like, data centers are about the only thing we're building in this country at any massive scale right now. So they get the line share of the attention. And I also think, so, you know, there's the externality issue. I mean, there's a scale. There's the at least perceived externalities. And I also think just the general backlash against
Starting point is 00:07:48 AI is also real. I think people look at it and go, the thing happening in that, you know, If I'm building an auto factory, it's like, well, at least I like cars. So, like, sure, maybe I don't want this factory in my town, but I like cars. So I'm going to accept the fact that we got to build cars somewhere. But if, you know, one, they have this perception of the externalities of the building itself are negative for the community, which I would contend is not true, but nevertheless, it's perception. And two, the thing that building is doing, I also don't like. Well, then it's, you know, it's a double whammy then.
Starting point is 00:08:21 It's like I don't like the building, and I don't like what they're doing in the building, and therefore, like, why would I support this project? So I do think the, you know, the tech companies have a real issue around how AI has been presented, you know, and that is causing a lot of this backlash as well. The other layer, I guess I'd be interested, because you've seen this change over time, but I think the other layer that's like worth throwing in there, too, is the secrecy component, because it used to be totally standard to be very, secretive as you were developing a data center in a community and nobody knew whose data center
Starting point is 00:08:56 was until very late and all this kind of stuff. And that falls maybe more into your latter category of like generalized opposition to AI. This is more, I guess, generalized opposition to the tech companies probably to the hypers. But, but what has changed, if anything, in terms of how secretive you need to be when you're developing a data center and at like what stage? Yeah. That's been an issue for sure. I mean, for, for, for us and for Cloverleaf, we don't sign NDAs with government officials. Like, we don't think that's good practice. I would say that those that have done that are probably moving away from that.
Starting point is 00:09:33 I would guess. I don't really know the policies of all the tech companies right now, but I think that issue is a lightning rod issue. And we've seen that in some of the regulations that have come out. I think that was part of Shapiro's deal in Pennsylvania, which, you know, we're very supportive of that. Like no NDAs, that's great. disclose the cooling system, like all these things that we're seeing, most of them I'll look at and go,
Starting point is 00:09:55 yeah, I agree with everything they're saying. Yes, that's responsible data center development. We should do that. Now, how it gets implemented is a whole other story, right? And can you actually implement it in a way that's, you know, smooth and efficient and actually enables good projects to move forward? Or does it just grind everything to a halt? Like, that remains to be seen how this all gets implemented.
Starting point is 00:10:18 So I think that, that transparency issue is super important. We still sometimes face issues, though, because, you know, as you think you know, we're an early stage developer, right? So we're developing a project without necessarily knowing who the end user is going to be. So we end up sometimes in these situations of saying,
Starting point is 00:10:35 well, why don't you tell us who the end user is going to be? You don't know. And they're like, why aren't you being transparent? I was like, I'm telling you everything I know. So, you know, that's something. We have to navigate as an early stage developer that, you know, you wouldn't if you're Google, Microsoft. But then, you know, you still have, you still have to deal with the same AI backlash.
Starting point is 00:10:55 You could say, well, you know, the company is meta. And they're like, well, I don't like meta. So, well, then it's like you didn't really fix anything. So that's the, you know, the general takes us back to that, that AI thing. So I'm not sure how much that really fixes anything. And we, I mean, we've seen this with dialogues with communities, too. It's like, you can be as transparent as you want. And at the end of the day, like, oftentimes the response is, well, I just don't believe you. Yeah. I don't believe that's true. I don't like it. Sure. I just don't like it.
Starting point is 00:11:22 I don't like data center. So it's like, okay, well, I can't fix the emotions around this. And that's a lot of what this is, is I think the industry has tried to attack this with facts and really miss the emotional residents of, like, people just aren't happy about this stuff right now. Yeah, I mean, that gets to sort of, I think the bigger picture question here is there's a, you know, in your first category, there's a list of things that are concerns the communities have. Some of them are totally well-founded and some of them are less well-founded. but they're specific.
Starting point is 00:11:50 They are impacts on power bills. They are water consumption. Maybe they are secrecy. They are economic impacts on the community. Those things seem very tractable to me, right? And there's a playbook now that the good developers of data centers, whether it be the peer developers like you guys or some hyperscalers, I think Google maybe is the best at this, have a playbook where you address all of those things as close to upfront as you
Starting point is 00:12:18 can, and you offer a lot in exchange to the community. I mean, you gave the example of a town in Washington, but, you know, there are lots of these examples now where it's like, okay, data center is coming and as part of data center arriving, they're offering, you know, a big community development fund and helping fund, you know, trade school at X, Y, and Z, right? That stuff, that seems tractable, and like the good developers seem like they can solve for all of that. But then there's the other thing, which is this generalized opposition. whether to AI overall or to the tech companies. And that one at the micro level,
Starting point is 00:12:54 you clearly can't solve that second one on behalf of the AI industry. So I wonder how you think about weighing those two against each other. Like to what extent are we hitting a point where you can do all of the right things and then the facts will totally be on your side and yet it's not going to matter? I think that's very real. I do think that because we see that day in and day out. Like we come in with the facts, we lay it out. We put it in the statute, and it doesn't seem to move the needle in a lot of instances,
Starting point is 00:13:25 like that everyone's already dug in on the issue that they really don't like data centers. And, well, you and I were at an event yesterday where we were talking about this with a group of industry folks, and that did come up of like there hasn't been enough from, whether it's from the foundation models, any player in the space that has really sold the world on like YAI. Why is this actually going to make life better for everyone? As opposed to this thing is a threat that we need to be scared of. And I am a firm believer in that we will, AI will be transformative for the world.
Starting point is 00:14:08 It'll be transformer for medicine. I'll be transformer for material sciences. I mean, there's so many things we're going to be able to do that we would not be able to do with AI. I'm also an optimist in the sense of I don't believe the job displacement narrative because it just flies in the face of every technology that we've ever had since the wheel. Any time we create efficiency in some process, it always creates more prosperity. Like that just, it's always happened.
Starting point is 00:14:37 And I can at least intellectually assent to like it's possible in theory. There is some technology to come along that would be the first to sort of, you know, prove that to be false. But I'm just not convinced that that's where we are with AI. I truly believe it will make us more productive. It will create more opportunity. It will certainly result in job displacement on the margin. And I think that's real. And that's been true of every technology.
Starting point is 00:15:06 I mean, it was true of oil displacing whalers. And, you know, I mean, that's always true. And I think that's where we have to have good regulations and we have to have good things focusing on skilling and job retraining and all of these things that will ensure that, you know, those who are affected actually come out better on the other side. So that fear is very real. And I just don't think the industry has done a good job of sort of educating people on why would we want to build these things. Like, what is this technology going to do? It's more than just chatbots and, you know, slop memes. Right. I mean, so that has been a big mess so far, I think, for the industry, and we've got to somehow write that ship.
Starting point is 00:15:50 Yeah. I mean, every time I have this conversation with anybody in the industry, we land at this place, which is the industry, AI industry has not done a good, and I think everybody says this, right? Now, like all the, like Sam says this, and everybody says this, right? Everybody agrees on this point. The AI industry has done an insufficient job, maybe a bad job of selling itself to the general public as something that is going to be good. And everybody. points fingers at each other, the leaders of the labs and so on as to why their messaging was the wrong messaging, whatever. But if you abstract all that away, I mean, the question that I have is at least for the near term, is the toothpaste out of the tube? Like, is it too late to salvage general sentiment toward AI? You know, could you solve it with like, we cure a form of cancer with AI or something? Like, do you need something like that and would it work even? If you did. You almost need a, and it's sort of the inverse of what I've been describing as like the Fukushima event.
Starting point is 00:16:48 What I found baffling about the shift to this negative sentiment is how fast it happened without like an obvious catalyst. Right. There was no meltdown. Right. Yeah. When Fukushima happened, it's like, oh, I don't want nuclear. It's like, okay, that's understandable. Yeah.
Starting point is 00:17:03 And in fact, the only jobs that have been lost really because of AI to date are like software engineers at software companies in Silicon Valley, which none of the general public cares about. Yeah. So it's curious how fast it shifted, you know, that the public sentiment has changed without, again, without an obvious catalyst. I mean, all these other things we're talking about are true about people considering about water and all these things. But all those have always been true. So it just, but it really, I mean, if you look at the, and I think political goes on a good job on, you know, the public sentiment. And it really was like starting last September. Like, you know, really perception of data centers was pretty steady, you know, and on both, you know, political spectrums was, you know, a little more favorable on the Republican side. little less on Democrats, but it was like steady. But it started in September, and they're doing these surveys every month, and it's just like, we're just falling off this cliff.
Starting point is 00:17:49 So, yeah, I think it's an interesting question. Could there be a catalyst the other way, right? Could there be something where it's like, oh, wow. Like, I never thought about the fact that AI could do that. Like, would that be the thing that got people to start to go, oh, maybe this is a technology that we need? And hopefully it would be a positive catalyst. Hopefully it's not some negative thing like, you know,
Starting point is 00:18:09 China has now this technology that we don't have. and it's threatening to us. Like, hopefully it's something more, you know, optimistic than that. But it almost seems like that's what needs to happen because I think, you know, the other issue we have right now is we're obviously in the middle of the midterms and then coming into a presidential election where this is a really top-of-mind issue
Starting point is 00:18:29 and you're seeing it on both sides of the aisle of either a Republican trying to label the Democrat as the pro-Data Center candidate or vice versa, and it's working, right? it's actually affecting perception. And so then that means that's a playbook that others are going to try to use. And so we have that also, that sort of headwind of the political environment right now that is concerning. And so I would hope that we would see some sort of favorable catalyst come along that could, you know, shift the tide a little bit against, you know, those factors.
Starting point is 00:19:04 Right. But who knows and who knows if it would work. Let's talk for a minute about the power price part, just because that in particular is both your and my specialty. I don't know if you saw this. Andy, my colleague, I think, you know, wrote a piece a little while back that I thought made an interesting point about power prices as they pertain to data centers and community opposition or community feeling about it, which is that there may be this dynamic wherein the objective truth, particularly today, is that a data center coming into a community tends to, lower rates because nowadays, you know, the deal that the utility is striking with the data center is basically guaranteed to do that, sort of the whole point. You were like a pioneer of doing this in the first place, right? And yet, and so, like, it may be true that at the micro level, rates are lower if you get a data center near you or a bunch of data centers near you.
Starting point is 00:19:59 And yet it may also be true that at the macro level, the build out of data centers has created a lot of inflationary pressure on electricity prices because it has created shortages of transformers and gas turbines and higher demand for natural gas and all this different stuff, which is pushing the price of all the components of your retail electricity price up. And so like, you know, that shouldn't, you know, the logical conclusion of that should be sure if you, if you care about power prices, then you should want more data centers to be near you because they will lower your rates. but it also isn't like entirely crazy for you to say data centers are broadly causing an increase in power prices. I wonder how you think about that dichotomy.
Starting point is 00:20:45 I think that's right. And so because there's two ways that I can't think about this. One, it is true that like producing more of something does not necessarily make it more expensive, right? In fact, it often makes it less expensive. And we saw that for 100 years in electricity, right? Electricity prices did not go up for 100 years as we massively. expanded the grid. Now, it is also true that we went through a period of no load growth, and hence, we did not, not to mention COVID-related supply chain disruptions. And so growing,
Starting point is 00:21:17 even if we're growing at the same rate that, say, we were growing in the 80s, we're doing in a very different environment. We're doing an environment where we have to rebuild supply chains that aren't there, right? And no one was prepared for the demand to spike like it has. And so the supply chain issues are real, and thus the inflationary issues are real. So I don't think, though, then the argument should be, well, we should just not grow. It's like, okay, we have some growing pains that we're going to have to get through, but long term, that growth is still actually going to be good for rates. Like, it should be favorable.
Starting point is 00:21:54 It's just, it's very, and this is where I think we have to, as an industry, be very sensitive to the fact that, you know, there are short-term pains that we're going through, And these concerns that people have about power rates going up and their power bills higher than it was last year is true. Now, is it necessarily higher because of data centers? I mean, maybe partially. I mean, it's just higher also because we have these inflationary pressures that we have to deal with. But I think that that is also an opportunity to say, well, what can we do as an industry to minimize the degree to which communities are facing those? And we've seen things like that.
Starting point is 00:22:27 Like, your data center is offering credits on power bills. and are there things that we can do? Because I do think there's enough money to go around in this industry to ensure that people are really insulated to a large degree from that sort of macro impact. So that's not easy to do, but it is possible. And so it's something we have to take seriously as an industry of, how are we really targeting, and you mentioned sort of the community benefit programs,
Starting point is 00:22:56 like how are we targeting those programs that really address the concerns of a particular community. They're not just sort of general givebacks to... Yeah, it doesn't feel like a, yeah, like a bribe or something. Right, right. But it's like, okay, we hear you. We understand this pain point. How can we work together to target that particular pain point?
Starting point is 00:23:17 Yeah. Staying on the power theme for a second. Okay, so one of the emergent results of the backlash and of the political response to the backlash has been states and others starting to really push hard on this bring your own generation, bring your own capacity concept. You see this with what Governor Rabbit is doing in Texas, Governor Shapiro in Pennsylvania, other places as well.
Starting point is 00:23:42 And as I understand it, most of those, they're implied behind the meter. It's not like always entirely clear whether they mean that or not, you know? And so I'm curious your perspective on it. But I know you historically have been generally, skeptical of behind the meter generation. And so I wonder what you think about that trend that we are seeing right now. Yeah. And I do think the language that people use is often very imprecise. And I always wonder that too. Like when you say that, do you mean that that capacity has to be on site or not? It's not clear. Yeah. Yeah. Because the bring your own capacity concept as we think about it
Starting point is 00:24:21 is you just have to make sure that you're funding all necessary capacity additions. And so we're doing a project right now in Oklahoma, and it's with a smaller municipal, and we're doing like 100% of the sourcing of all the generation capacity, of the wind, solar storage, and everything's going into that. And we are packaging it up and delivering it to the utility to then turn around and deliver it to the data center. So when I hear bringing your own capacity, bring your own generation, that's the world that I think about.
Starting point is 00:24:48 Okay, go solve it for the utility, be financially responsible for backing it. But yeah, I think most people probably think about, oh, that just means you're going to have your own generation behind the meter. And I've heard a number of people talk about that. And I think they even – one, it definitely doesn't solve the problem we're talking about. Because if you're talking about the issue is, you know, if the inflationary pressure on rates is not coming from, you know, more load on the system, but rather it's coming from higher cost for equipment. well, just buying that equipment and put it behind your meter doesn't do anything, but provide more upward pressure for the other stuff that you're going to have to put on the system, right?
Starting point is 00:25:31 So I don't think that, not to mention the fact that, you know, sort of unit for unit, doing something behind the meter actually results in you having to buy more stuff than if you would connect to the grid. Right. You're actually, you're overbuilding. Whatever. Yeah. Now you're making it worse. In fact, I was, you know, talking to someone from G.
Starting point is 00:25:51 Vernova yesterday, and he was talking about for this gigawatt data center, they're having to build 2.6 gigawatts of capacity across generation and batteries and everything else. And so when you think about that, you're like, you're buying lots of extra stuff that you wouldn't have to buy if you're connecting the grid. So I don't think that if that's what people mean when they say bring your own capacity, I don't think that actually helps the problem. I also wonder, like, if people don't want a data center next door, do they really want a data center plus a power plant next door? That also seems like not the right solution. I think that's worse than a data center is connected to the grid.
Starting point is 00:26:28 So I do get concerned when I hear about these proposals because I think it is very, well, again, I don't know exactly what they mean, but my assumption is they mean something that actually is worse than the right way to solve this problem. So it does create a lot of uncertainty in what does it mean for like how people are now going to go pursue projects as a result. Peak temperatures don't have to mean peak prices. When summer heat drives demand up, utilities need flexible capacity they can call on in minutes
Starting point is 00:27:02 while keeping customer rates down. That capacity starts in customers' homes. Energy hubs, Edgstrom's platform, aggregates thermostats, batteries, and EVs into VPPs that grid operators can dispatch with the same confidence as a traditional power plant. With real-time performance, accurate forecasting and end-to-end verification that holds up from the control room to the living room.
Starting point is 00:27:25 This peak season, more than 170 utilities are turning everyday devices into the grid's most responsive asset, exactly when the grid needs it most. Find out what utilities expect from a VPP partner at energy hub.com. When building a data center, the two hardest problems aren't technical. They're speed to power and earning community support. And that's where Bloom Energy comes in. Bloom's fuel cell platforms deliver fast, reliable electricity without combustion. For local communities, installing a bloom system means lower emissions, minimal water use, and quieter operations compared to conventional solutions. The track record backs it up. For over 25 years, hospitals, universities, and utilities have trusted Bloom energy to power communities where safety is top of mind. If you're building infrastructure where delays are not an option and community support is key, your power choices matter.
Starting point is 00:28:16 Visit bloomenergy.com to learn more or the link in the show notes. When it comes to energy, the best solutions don't start with a product. They start with understanding your business. NG works with customers to understand their goals, operations, and challenges before building solutions to their energy needs. Because while NG knows energy, no one knows your business like you. And because the work doesn't stop once the paperwork is signed, NG helps turn energy plans into outcomes.
Starting point is 00:28:46 more at NG Resources.com. That's E-N-G-I-E-N-G-Resources.com or click the link in the show notes. You know, it's interesting, now that you're saying it, I think putting a bunch of, okay, in order to go behind the meter entirely, and particularly if you're trying to go off-grid as a bridge power thing or whatever, you're definitely over-provisioning if you care about reliability at all. So you build too much stuff. Now, from the, you know, back to the micro macro thing about power prices, it probably is fine from the micro perspective, right?
Starting point is 00:29:22 You are not causing any new generation or equipment to get built on the grid, and you're paying for all the stuff behind the meter yourself. So it's probably fine micro, but it's definitely worse macro. It's fine micro, but I would even say, I mean, if you believe that a larger denominator is actually good for lowering electricity rates over time, it's actually negative in that you're taking that denominator. Right. You're not like adding to the, you're not sorry, you're not reducing the slack, the excess in the system, which is the way to, which is the way to lower rates for everybody. Yeah, that's a, it's not negative, but it's not positive either. It doesn't help. It could help. It doesn't help. And so, yeah, I just don't think that that is, that's at all fixing the problem. Maybe from a public perception it is, but when you actually understand the ins and outs of what's going on, you're like, oh, that's actually worse. Yeah. And on your second point, actually, I happen, you know, my, my algorithms now, like all. all they serve me is these like videos of local community hearings about data. I mean, this is your life, but it shouldn't be mine. And yet I watched a video yesterday of some Texas community hearing, some town hearing,
Starting point is 00:30:32 where somebody was trying to fight against the data center that was coming, and they were mostly focused on the gas. They were saying things about how polluting the gas stacks are and all the nitrous oxides coming out of the gas stacks, as they called it. I mean, I think it's a good point, right? Like behind the meter generation, particularly if it's thermal, is there are reasons people don't want that in their backyard either. Right.
Starting point is 00:30:53 So I don't think this is at all helpful at this point in the conversation. Yeah. Okay. So then the next question, of course, is let's say, and I actually think this is like a, I would bet on this being the case for the next couple of years, that it gets worse before it gets better. partially because of the political timing that you described, it's just currently where we stand today, there is no political advantage to being the pro-Data Center candidate at the moment.
Starting point is 00:31:24 I actually am interested to see somebody really try to take that mantle because I think there should be a lane there for somebody. But I don't know, unless you tell me otherwise, I don't see it right now. What I see right now is exactly what you said. Everybody's fighting to brand the other candidate, the pro-Datacetzer candidate. Yes, that's what we're seeing too, but I mean, I'm hopeful, and we're certainly having discussions with different folks that we could create a narrative that really ties to that community benefit, ties to the jobs. And I have definitely seen more stories. I mentioned Quincy Washington.
Starting point is 00:31:57 There was a story about Mecklenburg County, Virginia. There was, I think, Charlton County. I saw one. Loudoun County is now the richest county in the country. Yes, exactly. In the highest concentration of data centers and their property tax has gone down every year for the last decade. There was a good story about, I think, Ellinsdale, North Dakota, which is where Applied Digital, I think it's North Dakota. Would they have a facility? So I've definitely seen a lot more stories that have been sort of like, well, hold on,
Starting point is 00:32:26 slow down on this. Data centers are absolutely terrible, you know, period. To like, oh, yeah, there's a lot of benefits that come from these things. And there's a lot of value that we can see for having the jobs and having, the tax revenue and lowering our property taxes. And so that is a narrative that it's certainly not as loud as the anti-Data Center narrative, but it's there. Now, would a politician or a politician that has significant influence,
Starting point is 00:32:56 like really get behind that story, it remains to be seen because certainly the voices that have been pro-Data centers have gotten a lot quieter, you know, leading up to the election. but we continue to work with the local communities and we work at all levels of government all the way down to the county. We spend probably more of our time there. We're not doing as much at the national level, but not that's not important to us. We just tend to do a lot more kitchen table politicking and spending time with communities and trying to hear what the concerns are.
Starting point is 00:33:33 But I would like to see that happen. I mean, I would like to see some candidate come and say, hey, it is important that we build things in this country. And data centers are the thing that we are building at massive scale, and they are a huge part of GDP growth. And if we took that away, it would be hugely negative for the country right now. And also the geopolitical stuff, like, you know, China's going to build it either way. Like, we probably should.
Starting point is 00:33:57 You hear a little bit of that, but it's not. Nobody's really owning it. No. But, okay, but let's just say under the assumption that it does, get worse before it gets better for a second. There's two different thrusts of like, okay, so what happens then that I've seen people are thinking? One thrust is the, I've been calling it,
Starting point is 00:34:17 data centers go off grid, off land, or off planet. Right? So off grid, on the sea or in space. That's one, I'm grouping them together. They're obviously different from each other. But that's like, we're going to continue to build big data centers. They're just going to be, you know, not connected to the grid or possible.
Starting point is 00:34:35 not on Earth. And then the other one is tied more into the workloads over time shifting from just training to equal parts or maybe even more inference and that meaning maybe we can go distributed and it becomes edge
Starting point is 00:34:50 computing and we're not trying to go build gigawatt data centers and communities anyway. So I want to get your perspective on both of those kind of in order. First, off-grid, off-land, off-planet. So we already talked about off-grid. I don't think that's really the right solution. The underwater, it's funny.
Starting point is 00:35:07 So we did this in gosh, it was probably 2016 at Microsoft. One of the guys that was working for me, Sean James, who's now at Nvidia, did this. It was mostly just like science experiment. He literally built a Lego of a data center and put it in a fish tank for a little think week paper. And it was like, oh, you can put a data center underwater. And there's just cooling from the, you know, and Microsoft research picked it up. And they're like, yeah, we should do that. And we're like, oh, okay.
Starting point is 00:35:33 I guess you can go go do that if you want. So they did. They built one off the coast of California. I can't remember. It was on the kilowatts scale. And they did it. And I'm like, okay, good, you did it. You proved that you could put a data center underwater.
Starting point is 00:35:43 And then they're like, we want to do it again, but we want to do it bigger. I was like, oh, okay. So they built a much bigger one. It was a megawatt scale, you know, off the coast of, it was in the North Sea. And then the theory is like, well, you know, you could drop these like all over the world. I mean, most people live close to water, major ports. And, you know, you could, for a late. latency standpoint, you could just drop these all over the place.
Starting point is 00:36:06 Of course, it never went anywhere. We were like, well, you could do that, but you can also build them on land. It's a lot easier, and then your text don't have to be scuba trained. And there's a whole bunch of things, like, why you wouldn't want to do that? Now, I know there are some companies that are pursuing that today, for real. What's the name of company? Panthalasa is the one you think of. Thank you. Yeah.
Starting point is 00:36:25 So I know they're doing it. And I will say I was initially quite skeptical, given my experience, underwater data centers. But given everything we just talked about for the last 30 minutes, like, maybe. Like, maybe there actually is an argument for doing this. I still think the complexity and the scale of doing that is, or getting to the scale you would need to get to make it really worthwhile is super hard. And I haven't spent a ton of time really diving into it, but I have lots of questions about, yes, you could do that, but how scalable is it really?
Starting point is 00:37:02 I very much have the same question about space. Yes, of course, you could do that. But the scale at which we're building data centers, and I think both those things will happen. I just look at the pie of total data centers by 23rd and pick your date in the future. I'm a big believer of terrestrial data centers are still going to be the vast majority of the way we build data centers.
Starting point is 00:37:30 I just don't, I'm not sure. sure how much it moves the needle and just like sort of broad-scale compute. Are there edge applications and other things that for which it could be useful? Probably. I'm just somewhat skeptical that it's going to be a big piece of the pie. It's interesting. I have sort of the opposite intuition from you about the where the breaking point for you. You said like off-grid's not the solution, but we probably will do some in the sea and in space. And to me, look, if we, if we hit this, like, impossible to penetrate ceiling on data centers connected to the grid, which we both agree is like what should, we should do as much of that as we can do,
Starting point is 00:38:16 because that's the right way to do it. But if that's, if that hits some ceiling, to me, I don't understand why we're not just going off grid then, right? Like, then, because you, the land, you go anywhere, right? Like, we're, like, we're. move the constraint of the grid, you can put the data center anywhere, you don't have to deal with operations in the middle of the sea or in space. It's very scalable. But you don't get around, let's say, if the biggest barrier today is actually the community acceptance, off grid doesn't solve that problem at all. You still need a piece of land that you can permit. But if you remove the constraint of the grid, man, you can go anywhere. I mean, we got some empty places
Starting point is 00:38:54 in this country. Yeah, we do. But I still. I'm not convinced it takes that much of that barrier away. I really don't. And I could be wrong. I definitely think, I mean, there is that sort of latency question. If you really don't care where you are. But I think if that's the case, I think what you end up seeing is you end up seeing a lot of stuff built in some other countries, too. Like, I saw a pitch recently for building a bunch of data centers of Mexico.
Starting point is 00:39:20 And I was like, that's actually pretty good. Because this group had found a bunch of old industrial sites that had been set up to be big manufacturing facilities that never got built and like, oh, that's actually, but not a bad idea. Like, you know, bring the jobs there, bring the economic development. You know, if you don't care about it. And that goes to like how much you care about it being in the United States and how much you care about data sovereignty and other things, you know. So we are kind of having a debate about, you know, how much we're going to build
Starting point is 00:39:47 the United States. But, you know, there are other places in the world to build data centers. Now, there's other places in the world that are actually harder to build data centers in the United States, too. So it's not like, that's not a panacea either, just to be like, well, just going to go, you know, because it was like, you know, prior to the, you know, us attacking Iran, everyone's like, well, everyone should go to the Middle East and build data centers there. And now everyone's like, maybe we don't want to build data centers in a middle of a war zone, right?
Starting point is 00:40:12 Or an increasingly unstable region. So, so, yeah, I don't know. I think, I will say, like, I'm a lot more open-minded maybe than I was even nine months ago as to, like there have to be other solutions we pursue because all the stuff we thought we were going to build in this country or thought we could build, a lot of that's not going to get built because of all the things we've just been talking about. I think this problem is going to persist for the foreseeable future. And everyone who thought, oh, I just got a constraint in 2027 or 28, you have the same
Starting point is 00:40:48 constraint in 29 and 30 and possibly into the early 2030s. I think that we'll just continue to be a very, very tight market. Yeah, I guess my perspective has just been, okay, if you think that constraint will be fundamentally caused by power generation, then space and the ocean make a lot of sense because you get your energy for free, ultimately. But if you don't think it's power generation, you think it's some combination of community and grid like transmission distribution and water concerns and things like that, like then I don't think. That off-grid to me just feels like a smaller step that's, like, more plausible. And, you know, you've seen the maps of, like, all the solar it would take to power the entire country if you put it in Mojave Desert, right? Like, imagine all the data center space you would need, even including a bunch of solar and a bunch of thermal generation, all that kind of stuff, if you just put it in the middle of the southwestern United States and the emptiest part of the country. Like, you could do it for sure.
Starting point is 00:41:49 Yeah, yeah, you could do it in theory. I don't know. I think we're going to learn a lot, honestly. This is such a unique time because you have to sort of throw out everything we've sort of understood about how we develop things for the last 15, 20 years. And it's like all this stuff that really made no sense. Again, going back to Microsoft during underwater data centers 10 years ago, and we're all like, we'll just put that on the shelf. We're not really to do that. Now you're like, huh, maybe that's not as bad about it.
Starting point is 00:42:19 is as we thought. So, and I think we'll get to, I think the next question was more about sort of that edge. Are you right? Yeah, and the actual one, it's related, but I just want to be clear that like the rationale for edge is not entirely the same as the rationale. Okay, the rationale for edge contains maybe you can do it with less community pushback, but it seems to be equally equal parts about like, well, maybe you get faster speed to power because you don't need to go through the big long interconnection cues.
Starting point is 00:42:48 and, you know, and I think that's, I'm increasingly more bullish on that than I ever have been. I mean, I've seen a lot of pitches. I mean, that doesn't make any sense. And I've talked to a lot of investors. You're like, yeah, people come to us and saying,
Starting point is 00:43:04 like, people are going to take, like, one floor of a commercial building and all the stuff. And it's like, well, maybe, but, you know, got floor loading issues. And there's a lot of, so, I mean, a lot of those things are like, well, in theory, yeah, that ought to work. But when you talk about actually what it takes to build a data center, it's pretty hard, even if it's small.
Starting point is 00:43:21 So, you know, it's not like power isn't the only thing you have to think about, right? However, I definitely think that given the, I mean, if you believe that and just take any curve between now and 2030, if you believe the market is going to be short, and which means the marginal megawatt that you bring online has real marginal value, then a bunch of things that don't make sense in an unconstrained world might make a lot of sense in a constrained world. And so then that, it really gets in that price point. It's almost like the same thing when you think about
Starting point is 00:43:56 oil and gas discovery, right? People will say, well, like, oh, you know, we only have so much gas because, like, there's a bunch of unproductive wells and people aren't going to drill in these things. And it's like, well, yeah, that's true if, you know, if gas is $60 a barrel, if gas is $150 a barrel, there's a bunch of things that people would be like,
Starting point is 00:44:12 oh, I'll drill that well all day long, right? I mean, it's the same sort of thing when you have that price signal. And so I think we're getting to a world where the price signal for that marginal unit of data center capacity is actually really quite high. It's a lot higher today than it was two or three years ago, which means that a bunch of businesses
Starting point is 00:44:34 that maybe you got pitched two or three years ago that you looked at and were like, it's an interesting idea, but it's never going to work because the break-even point is wrong, right? Probably dust some of those off. like actually that works in this environment of really high marginal cost for compute, right? So I am, you know, I still believe that the vast majority of computation is going to be done in large data centers, large being defined as 100 megawatts or more in my world.
Starting point is 00:45:05 Like, that's how I would think about it. I mean, I think, you know, and definitely the people I talked to today are of that mind, even the ones that are desperate, or like, I've got to have capacity, the lowest of heard is like, but it's got to be 50 megawatts. I can't, I can't spend a bunch of time doing like some one's-a-to-sies and things. But I think, you know, I think there's probably, in fact, I talked to one yesterday, but I think there's probably, it's called them like Clover Leaf type customers that are going to go out and just say, well, we're just going to go do this on spec, and we're going to go find a bunch of locations, and we're going to aggregate them together,
Starting point is 00:45:35 and we're going to create a portfolio of these things, and someone's going to buy them. And I think that's probably true. I just don't know the scale. I don't have a good sense of like, how big of a business you could build doing that. But I think people are going to build some businesses doing that. So many people are building that business right now. Yeah. The edge cloverleaf, I can't tell you how many
Starting point is 00:45:57 of them there are. Yeah. There's a bunch out there but just like cloverleaf and sort of all of arc betters, there's a bunch of people are going to try to do that and it's not going to go very well. Yeah. Yeah. It's hard. It's going to be a hard business to pull off. And it's a spectrum, right? There's a big difference between 15 kilowatt
Starting point is 00:46:12 data centers strung together at people houses up to, you know, industrial sites that can house 20 megawatts apiece or whatever, you know, and there's a full spectrum in between there and the density that you need and the volume you need aggregate and how you finance the whole thing. There's a lot to figure out there that's kind of new and different from, you know, even with your, you know, when you started Cloverleaf, like, you're building bigger sites than really people had built much of before, but it was kind of the same thing fundamentally that you were doing at Microsoft, right? This is a different thing. it's a different thing.
Starting point is 00:46:46 It's a different sort of product. And that's why I'm saying, I think it's going to be really hard to pull off. Some people are going to do it. And I think the ones that do it are going to do quite well because getting a marginal cost of compute is just super, super high. And someone's going to be willing to pay for it.
Starting point is 00:47:03 But I don't envy your shoes as an investor to try to sort through which are those ones are going to work and which are. Because I think you're just going to tell me. I'm sorry. Yeah. All right, well, in the absence of you telling me what to invest in, it's good enough to just have a good conversation.
Starting point is 00:47:22 Fun as always, Brian, thank you. Yeah, absolutely. Thanks a lot, Shell. Brian Janice is the co-founder and chief commercial officer of Clover Leaf Infrastructure. The show is a production of Latitude Media. You can head over to Latitude Media.com for links to today's topics. This episode is produced by Max Savage-Levinson, mixing and theme song by Sean Marquand. Anne Bailey edits the video version of the show.
Starting point is 00:47:44 Stephen Lacey is our executive editor. All of our episodes are on YouTube. You can subscribe to Latitude Media for episodes of this show and Open Circuit. You can also find the audio version of this show anywhere you get your podcasts. Also, if you haven't been before, you should come this year to Powerhouse's 10th annual New Dawn Party. It's on October 22nd in Oakland, California. I've been on the host committee for, I don't know, most of the 10 years probably, and I'm always there. so if you come, you'll see me.
Starting point is 00:48:16 You can grab your tickets at powerhouse dash ventures.com slash new dawn. I'm Shail Khan, and this is Catalyst.

There aren't comments yet for this episode. Click on any sentence in the transcript to leave a comment.