Episode Date: September 10, 2026Paris’ new book Hyperscale: The Ambition and Excess of Data Empires is coming out in October. To celebrate, we’re revisiting the series that planted the seeds for his deep dive into hyperscale dat...a centers, the communities they’re affecting, and the future Silicon Valley is trying to build. This is episode 2 of Data Vampires, a special four-part series from Tech Won’t Save Us.The show is hosted by Paris Marx. Original production on Data Vampires was by Eric Wickham. Current production is by Kyla Hewson. Support the show on Patreon.Also mentioned in this episode:Preorder Hyperscale to support Paris at hyperscalebook.com.People Before Profit TD Brid Smith, Tu Nube Seca Mi Río organizer Aurora Gomez Delgado, and King’s College London lecturer Sebastian Lehuede were interviewed for this episode.Some pieces by Dara Kerr in NPR, Sarah Emerson and Emily Baker-White in Forbes, and Hannah Daly in The Irish Times were cited.Support the show
Transcript
Discussion (0)
Hello and welcome to Tech Won't Save Us. I'm your host, Paris Marks, and this week we're
continuing our re-airing of the Data Vampires series with episode two, opposing data centers.
I decided it was a good time to re-air this series from 2024 this month, one because we are
seeing so much backlash to data centers growing, not just in the United States, but around the
world, and it's becoming a major issue in the lead-up to the U.S. midterms, but also because I have a book
coming out on October 20th called Hyperscale that digs into the buildout of these hyperscale
data centers, the opposition to them, and why the tech industry is trying to build out a future
that we do not have to accept. Data Vampires really laid the foundation for that book. It was,
you know, where I did a lot of the initial research that helped to inform how I approached the
broader narrative and the stories that I told in this book-length examination of what is actually
going on here and what the tech industry is trying to do to our lives and to our world.
So if you want to get a copy of the book, which I would really appreciate, you can do that by going
to hyperscalebook.com where you can find links to go pre-order a copy of your own. Of course, you can
also just go to your local bookstore, and I'm sure they would be happy to bring it in for you.
Also, since you're a listener of the podcast, you're used to hearing my voice in your ears.
Well, you might also want to know that I will be the narrator of the audio book for Hyperscale as well.
you can go and pre-order the audiobook and listen to me reading my book to you.
So quickly, in this episode of Data Vampires, we get to the backlash, right?
The growing backlash that we were already seeing two years ago against these data centers,
the effects that they were having on communities in the United States, but also in Ireland,
in Latin America, and in other parts of the world.
And of course, the growing push for moratoriums on data center construction, which at the time
were kind of nascent.
We saw them in some places, and there was a push.
to have them in others. But now, there are plenty of moratoriums. I believe at last count,
there are more than 500 local moratoriums across the United States. And earlier this year,
we saw New York State become the first state to pass a statewide moratorium on the construction
of data centers for up to a year. So there has been a lot of progress made since I've recorded
this initial episode. And of course, we're continuing to see progress with every passing month.
Maybe the one final thing I would say about this episode is that it starts by talking
talking about XAI and the data centers that Elon Musk and his AI company were building out
in and around Memphis, Tennessee. Of course, the impact of those data centers has gotten even
worse in the couple of years since I made the initial series with, of course, people locally
feeling the effects of that, but also the establishment of not just the first one, discussed
in the series, but also a second one and even bigger one very nearby that is, of course,
having very similar effects on local populations and on the area.
These are infrastructures that have significant costs to communities, and the tech companies do not really have an incentive to care too much about those costs,
unless local people make them by pushing back against the data centers and making them have to consider what people in these communities actually feel.
So I hope you like episode two of data vampires.
Of course, go and pre-order your copy of Hyperscale today.
And thanks so much for listening.
On March 22nd, 2023, the Future of Life Institute released a letter calling for a six-month pause on the
training of powerful generative AI models. It was supported by Elon Musk and a slew of other
influential figures in the tech and AI industries, but not all of them were sincere. Earlier that
month, Musk had registered a company called XAI to try to steal the thunder from OpenAI and its
chatbot chat GPT, but XAI needed time to catch up, hence his interest in promoting an industry-wide
pause. Musk went public with the company in July, then began showing off its Grock Chatbot in November.
But if the company was going to grow, it would need more computation.
In June of 2024, the Greater Memphis Chamber, effectively a Chamber of Commerce in Memphis, Tennessee,
announced XAI was building its data center, or supercomputer, as Elon Musk calls it, in the city.
The Loho Council, not to mention the wider public, were completely caught off guard.
Reporting by Forbes revealed negotiations happened over a few days in March,
involving mainly chamber officials and a few other stakeholders,
not the Democratic representatives you would expect to be involved in.
such a deal. XAI was taking over a former manufacturing facility, seemingly through a shell
company called CTC Properties LLC that was formed around the time of the negotiations and converting
it to meet its needs. The company promised it would build a new electricity substation and a gray
water treatment plant, but a contract for neither facility existed, nor was the deal conditional
on XAI following through on those promises. And as we all know, Elon Musk doesn't exactly
have a track record of following through on his commitments. The XAI facility, which is the size of 13
football fields, is located in South Memphis, near black communities that have long suffered
higher levels of air pollution and environmental contamination. The cancer rate there is four times
the national average, while life expectancies are 10 years lower than other parts of Memphis.
In September, Dara Kerr, a journalist with NPR, found the company was already making
things worse for them. It had at least 18 portable methane gas generators running on site,
which is enough to power 50,000 homes and didn't bother getting air permits for them.
When the entire facility is complete, it expects to use 150 megawatts of power, or enough
for 150,000 homes. Residents are worried what that will mean for their own access to electricity.
In the past few years, the city has already been having to warn residents to reduce their power
usage to avoid rolling blackouts. What will happen now with XAI and the demands of its supercomputer
coming to town. As I learned about XAI's antics in Memphis, I couldn't help but think back to
the Dahls, Oregon, the city where Google built its first company owned data center back in 2006
and where in 2021 residents had to fight just to get Google to disclose its water use, only to find
it was soaring. Here's another community facing a data center project that creates serious
concern about water use, and in this case, electricity access too. The company is trying to act in
secret and keep information about what it's doing from the public. But the truth is, these are not
isolated cases. Across the United States and around the world, more and more communities are
finding themselves facing down major tech companies that have a vision and demands that are far
different from their own. And in a growing number of those communities, people are fighting back.
This is Data Vampires, a special four-part series from Tech Won't Save Us assembled by me,
Paris Marx. Over the course of this series, we'll learn more about data centers and the extreme vision
of the future, these powerful people in the tech industry are trying to foist on us,
regardless of whether we want it, or whether it will even make the lives of most people
any better. In this week's episode, we're exploring the growing backlash to hyperscale data
center projects around the world and how they're an important part of the broader fight for
a different vision for how these technologies fit into our lives. This series was made possible
by our supporters over on Patreon. And if you learn something from it, I'd ask you to consider
joining them at patreon.com slash tech won't save us, so we can keep doing this important work.
New episodes of data vampires will be published every Monday of October, but Patreon supporters
can listen to the whole series today, then enjoy premium full-length interviews with experts
that will be published over the coming months.
Become a supporter at patreon.com slash tech won't save us today.
So with that said, let's learn about these data vampires, and by the end, maybe we'll be closer
to driving a stake through their hearts.
Estimates vary, but data centers are responsible for probably two or three percent of global
emissions, about the same amount as air travel.
but they certainly don't receive nearly the same degree of collective ire.
Remember a few years ago when we were constantly hearing about Fligsgam,
a movement coming out of Sweden that translates to flight shame,
it wanted people to feel bad for flying so much and to reconsider their travel habits.
I haven't heard nearly as much talk of generative AI shame,
though I've seen some terrible AI generated images whose creators or prompters should be feeling it.
But let's not get sidetracked.
We'll get to generative AI next week.
Two or three percent might not sound like a lot,
but that number is growing as the tech industry's demands for computation expand at an accelerated pace.
That abstract global figure also masks what's happening on the ground.
Memphis and the dolls are two such sites, but some communities, if not entire regions or countries,
are feeling those effects much more acutely.
Then I started working on this in the parliament.
The prediction was that by 2030, the power grid would be occupied by 30% of all power going to data centers in the country.
the amount that the data centers are absorbing is totally out of kilter.
But it's also out of kilter with the rest of the world.
That's Breed Smith, a TD or member of the Irish Parliament in Dublin, with people before profit.
She's been outspoken on the issue of data centers as their energy demands have been growing
and the Irish public has been getting more and more fed up with the effects.
In 2021, long before Generative AI shown even more light on the data center issue,
she brought a bill before Parliament that would have halted new data center construction.
but it didn't get enough support to pass.
Water use by data centers is a concern in Ireland,
but the bigger one, as Breed says,
is the staggering amount of electricity data centers are using.
In 2015, data centers used just 5% of electricity,
but by 2023, it was more than four times that.
Just imagine, of all the different ways,
electricity gets used in a country for 21% of a country's supply
to be going to more than 80 data centers,
about two-thirds of which are massive hyperscalers
that don't even primarily serve the Irish public,
with dozens more in the pipeline.
Data centers now use more power than all the urban homes in Ireland,
and that demand has serious impacts.
In some cases, other businesses can't get access to power they need to set up,
but it also threatens the wider public's access to electricity,
especially in the cold winter months.
There's been under warnings, which warns of blackouts of electricity,
on numerous occasions, particularly in the winter months,
since 2020. And that kind of alerted us to have a look at what is going on here because it was very
obvious. We especially when you live in Dublin, that the proliferation of data centers was something
extraordinary. The demand for power by data centers is outstripping what the grid can reasonably
supply. As a result, there have been temporary moratoriums on new data centers in recent years. But even then,
some facilities got around their inability to connect to the grid by building what's called islanded gas-powered
generation infrastructure to bypass the grid altogether, regardless of the associated emissions.
That's the other piece of this. Ireland, like so many other countries, is not on track to meet
its climate targets, even as it's ramping up investments in renewable energy. As more renewables
are added to the grid, they can't displace fossil fuels because the demands from data
centres in particular are so high. The renewable energy that we've produced, and it is because
we've produced a lot more wind energy, 80% of it, the new renewable energy is going to,
the data center industry. So it should be going to electrify homes and transport and bring green energy
to hospitals and schools and everything else, but 80% of it is going to feed the data industry.
Writing in the Irish Times, Hannah Daly, a professor of sustainable energy at University College Cork,
explained how this approach makes no sense. Quote, growing energy demand at a time when we're
trying to drastically cut emissions is like running down and upwards,
moving escalator. No surprise, the data center industry isn't very worried about those concerns.
It smears critics as though they're trying to take away people's access to Netflix and the various
services that they enjoy, even though that's not what campaigners are demanding at all. They also
suggest it's essential to build data centers in colder climates like Ireland to cut cooling costs
and that they can contribute to communal heating systems. But Breed says there's only one of those
even operating and it's been slow going. Those same arguments have been made for the
countries like Sweden and Finland, but there too communities have been running into similar issues
with data centers making significant power demands such that other industries have to go elsewhere.
All of that presents an important question. Who is actually served by building out these infrastructures?
I came into the parliament on the back of grassroots movement to stop the privatization of water in this
country. It was a very, very political issue for the majority of the population. Given that we're in a
country that there's hardly a day goes by without it raining and we've plenty of the best stuff
you can have which is water. We were being as consumers, ordinary people were being penalised
for what becomes then the sins of big multi-global tech companies like Amazon, Google, Microsoft,
who are all headquartered here in Ireland because there's a low tax rate for them. They've access to
the European Union. They have a workforce.
that speaks the English language, but mostly it's low tax and low regulation or Zilch regulation.
And so these companies put it to the government, well, if we're going to be headquartered here
and bringing in jobs, tech jobs, we'd also like to have our data centres nearby.
And they've been given the carte blanche to build what they want.
This gets to the crux of the issue. For decades, Ireland has made itself an attractive place
for investment by offering major companies, including those in the tech industry, low taxes.
if not the ability to evade taxes in other jurisdictions too, and a slew of other benefits.
Data centers have easy access to transatlantic fiber optic cables linking North America and
Europe, along with weak regulations and planning rules that have benefited them immensely.
But as they're demanding more from society, people are getting fed up.
In recent years, Irish citizens have been asking whether that deal is still working for them.
The big tech companies are making out like bandits, while it's become virtually impossible to afford to live
in Dublin, and public services like healthcare and education are struggling. Now add to that,
a power grid that's feeling the pressure under the weight of the energy demands of hyperscale data
centres, and you have a recipe for growing opposition, not just to the data centers themselves,
but to this whole arrangement. But these things useful. Do we need them? Should they take priority over
green energy going into our health service, for example, or schools, our transport system? We've never had
that actual discussion, even at a political level, never mind at a more communal or societal level.
It's really shocking how they're being facilitated without any question.
Major tech companies have used their power to get their way, but it's not clear citizens will
keep letting them, and it's not just Ireland where that's happening.
In 2022, Meda announced it was planning to build a new data center in Castilla La Mancha,
a region in central Spain that would cost 1.1 billion euros.
The data center industry had already been growing around Spain's larger cities,
but as companies moved further out into the country, they came with a particular sales pitch.
They are centered in the normal areas that you can imagine, Madrid, Barcelona, because they are metropolitan areas.
But in the last year, they are moving to rural areas that are with not too much population, with elderly people, with not too much jobs,
so they can go with this card of unemployment.
We are going to give you jobs, the progress, and so on.
Every day that I wake up, there is a new headline.
There is a new data centers that are going to be built in Spain,
and not the normal ones.
All of them are hyper-scale.
So this is a problem.
That's Aurora Gomez Delgado.
She's behind Tunube Sekamirio,
an organization pushing back on data centers,
whose name translates to your cloud is drying my river.
Promising jobs and prosperity is part of the pitch that these data centers make for public acceptance,
even though there aren't many actual jobs to be had once construction is over.
Breed told me that's part of the pitch in Ireland too,
but those promises have the effect of captivating local officials
who are thinking primarily about the short term instead of longer term impacts.
The local majors always want to give jobs to their citizens because it's the main problem for all of them.
The problem is the local.
Mayors always think in four years in advance
because we have the elections only in four years.
They never think about how the next generation is going to be suffering,
the lack of resource, the lack of environmental resources,
or also the heat or the lack of water.
So they believe this promise always because they have this problem of access of information.
They say, okay, come here.
We change our law.
We also give you the terrain, the territory, so you can build everything.
Targeting economically struggling areas works great for major tech companies who want a good deal.
It's exactly what Google did in the Dahls two decades ago and what so many others
continue to do today.
In 2024, Karen Howe wrote an article in the Atlantic that told the story of how this
is playing out in communities in Arizona, where water is also a big concern.
She explained that the city of Chandler, Arizona, had stopped accepting data center
projects because it's a wealthier community and felt it didn't have to make the tradeoffs the
companies required, while Goodyear, which was about 40 miles away, isn't so lucky and has continued
to take on data center projects despite the pressures of places on its infrastructure and resources.
Tech companies know those regions have few other options and will accept bad terms, whether it's
for huge tax breaks, free land, infrastructure buildouts, or water rights. That last one is the biggest
problem in Castilla la Mancha, even more so than it was back in Oregon.
I'm from La Mancha, Castilla La Mancha, where Meta-Tata Center is going to be built.
And I have kidney problems right now.
I have strong kidney problems.
When I was a child, there are so big droughts that I have no tap water in my house.
So this is the region that they are coming from.
Also, our names, means lack of water.
So Castia la Mancha means lack of water.
Castia la Mancha is a desertic region,
which means it has very limited water already,
and climate change is making that even worse.
Beyond the residents, there are big pig farms that use a lot of water,
and over-tourism leads that problem to being worse too.
Residents like Aurora fear there simply isn't enough water to go around,
especially with the big demands being made by data centers
and how climate change is making an already drought-prone region even worse.
Right now, this summer, there are 500 cities and little towns in Spain
that they don't have access to water, to tap water, just to drink.
This is a huge problem because we are, of course, a country that we have rural infrastructures
of water since Roman times.
So this is a really new problem for us.
And the lack of water, I think this is the main problem for any citizen right now in Spain.
And also the heat waves that are so, so strong, that have so many thousands.
of dead people just in summer
do hit waves that are collapsing in the
sanitary system. We even don't know
how to fight against this because
you need money to isolate all the house.
You have climate refugees
that they are moving to the north
parts of Spain. So it's a huge problem
right now in the same places that we have a lack of water
there are too much tourists.
So this is a,
reason I think our campaign has having so much success because we have this concern about the lack of water.
It's no surprise why people facing heat waves, drought and water shortages would be skeptical or even
angry about a massive data center coming to town, especially without the proper guarantees
they won't make their environmental challenges even worse.
Companies like Meta or Google know their wealth and the size of their companies gives them
power, power they can use against struggling communities and local
governments that will do almost anything to attract economic activity they can sell to their voters
as the industry of the future and justification to be re-elected. We'll return to the political
question a little bit later, but if this is what major tech companies will do in places like
Europe or North America, just imagine what they might try to get away with in other parts of
the world. The story of Cerrillo goes back to 2019 when Google planned on constructing its second
data center there. It already had one in Chile, in Santiago, in another municipality, but it
wanted to build another one. Some local activists heard that eventually Google might construct a
data center there and that this data center might be using a lot of water. That's Sebastian
Leweide. He's a lecturer at King's College London and has been researching the push to build more
data centers in Chile. The country already has 22 data centers, but there are plans for another 28,
and not everyone's happy about it.
What happened in Serios, a working class neighborhood in Santiago,
is probably the best example of that.
Google made its plan for a data center there
and had the full support of the right-wing government of Sebastian Pinera.
The president even did a public announcement with Google executives,
who surely expected the project to sail through,
but the community wasn't going to let Google do whatever it wanted.
So what they did, the local community,
was that they downloaded this environmental report,
and they studied it.
This is already very important because usually these reports use a quite technical language,
and this is a working class community where not many people are lawyers, for example,
or are experts on ecology.
So it took them a lot of effort to understand this environmental report in the first place.
And one of the things that they found out, thanks to their effort,
was that this data center was going to use 169 liters of water per second
in an area facing drought.
They didn't have clarity on whether this amount of water
would allow them to keep using, for example, their tap water
or to, you know, flushing their toilets or having a shower.
So because of that, they looked out for help.
They even tried to get in touch with political parties,
but they didn't receive much support.
Like in the dolls, Dublin, or Castilla de Mancha,
Google came to Serios with the usual pitch.
They were bringing jobs and opportunity
that would make it more prosperous. Initially, a lot of people bought into the story, but as those
activists dug into the reports and started sharing their findings, the mood started shifting,
especially when it came to water use. In the not too distant past, residents of Serios didn't have
running water to their homes. They'd had to rely on water from trucks, and they did not want to
go back to living that way. They sought guarantees from Google that that wouldn't happen,
but didn't get the proper assurances, so they began to fight it, and did so quite success.
They decided to not necessarily attack Google because of all the many issues that we have heard about Google, such as privacy issues.
They consider that that might be a bit obscure for the local community, so they focus on water.
And they put up some posters, they organized assemblies, they went to street markets to talk about this issue.
And at some point, also in 2019, there was a big social uprising in Chile.
this is an important kind of piece of the context
because that really empowered some local communities
that had been protesting for some time.
And as a product of that social uprising,
some communities decided to make a local referendum.
And one of the questions in this referendum
was whether the local community wanted this Google Data Center or not.
So in December 2019,
49% of the community voted against the project
and only a 38% voted in favor of the project.
The referendum wasn't binding, but it is a pretty significant step to go from a community largely supporting the project to voting against it within less than a year.
That wasn't just because of the potential threat it posed, but also how activists who wanted to stop the project, or at least avoid the worst outcome, handled their campaign.
This is one of the most hostile cases of activism that I've seen when it comes to communities organizing against data centers.
So if you look at the graphics, for example, that they developed, they use births,
Learning schools, symbolizing that basically Google is a toxic company.
They put up posters talking about Google's extractivism and making connections with history.
So I think it's a very interesting case also when it comes to the originality of the content or the material that they produced.
One of the posters that circulated online read, quote, danger, danger, no to the data center, data theft.
Ultimately, the community was successful.
The project hasn't been fully canceled, but they stalled it for years.
years, and we're able to force Google to the negotiating table to ensure that when or if,
it does get built, it doesn't use as much water as it was initially planning. So there isn't
a risk. They'll lose access to running water. But their success attracted attention. Other
communities in Chile have looked to it as an example, as have activists in other countries.
Aurora even brought up that Latin American activism in our conversation. Around the same time Google
was facing the backlash in Serios, it announced another data center in Uruguay, leading some people to
wonder whether it was a replacement for the one in Sedios. But there too, it faced major demonstrations
over the amount of water the facility would use. A banner in the Uruguayan protests made a profound
statement reading, quote, water is not a present. It is not for sale. It must be defended. In some
countries, these data centers are starting to spread around a bit, so the impacts on one community
or region are not so severe. But that isn't the case everywhere. Places like Northern Virginia
and Dublin are data center hubs, leading to the significant demands we've been talking about,
but that's playing out in other parts of the world too, including in South America.
There are around 170 projects in Mexico right now, and what is concerning is that usually
these projects come quite clustered, right, because they look for places where there are good
connections, you know, subsea cables and so on, fiber optic cables, and because of that,
they tend to get allocated within a very kind of small range of
area. So because of that, I think that some regions in Mexico, such as Kereda, Santiago, in Chile,
Sao Paulo, in Brazil are becoming big clusters of data center, despite already having a lot of
energy and water pressure from the big city that are next to these data centers.
Major tech companies like Amazon, Microsoft, Google, and Meta feel they can swoop into communities
anywhere in the world and impose massive resource-hugging infrastructures without truly considering
the impacts on the people who live there. At the end of the day,
Those local populations and their ways of life don't matter.
All that really matters is expanding the computation available to tech companies
as a means of increasing their revenues and profits and being able to do so at the lowest cost,
which means finding jurisdictions that will make the process easy
and hopefully throw in some tax breaks and other perks in exchange for their investment.
That naturally leads to the kind of political questions Breed was asking earlier.
Who actually benefits from these things?
Should we be allowing them in our communities?
And can they be stopped?
As fights against data centers spring up around the world, progress is being made.
After the pushback offered by Serios, Chile's new left-wing government under President Gabriel Borich
is working on a national data center policy to see rules and expectations for future projects.
Gabriel Borich comes from the left in Chile, not even the socialist left, which is, you know, center left, but basically a more radical left.
So one might think that he might have held a different kind of position when it comes to big tech companies.
But so far, it's been a continuity with previous government.
in that sense. When it comes to data centers, I think there are reasons to be concerns,
but also reasons to think that maybe something interesting might happen. The government wants to
build a data center policy, basically, or a national plan of data centers, as they call it,
in order to manage all these investments. And according to them, to make sure that these data centers
respect, you know, ecological kind of considerations, and also involve local communities in the planning
of these data centers.
How exactly that is going to look like, what are going to be the terms and conditions of
that participation, that's not clear.
So I am personally waiting to hear more about this before having like a final opinion about
it.
But I think it's already interesting to see the government trying to take measures in order to
control this.
Rules governing data center construction seem like the absolute minimum to expect at this point,
especially given the push from companies to increase the number and scale the facilities
they're building.
The lack of basic regulations on data centers seems to be a widespread problem, and companies
lobby hard against establishing them, or just try to write rules that will favor them.
In Ireland, as we discussed, companies often face fewer restrictions on what they can build,
and in too many jurisdictions, governments are so desperate, they'll give them permission to do whatever
they want.
Sebastian told me that rules in Chile could be a step in the right direction, or they could
simply be an initiative by the government to create some mechanism for community involvement
to stop what happened in SADEOs from spreading to too many other projects.
The quality of the consultation and community input will depend on ensuring they have the capacity
to really understand what's happening and engage with the process.
Quite often, these local communities don't know much about what a data center is,
might not even be aware of what these companies are all about.
So I hope that as part of this participation, there is going to be a process
where communities are going to be able to self-educate with external support, of course,
around data centers. So what's an achievable agreement, for example? What can they ask from Google?
Or who is Google? Who is going to be this neighbor, right? So hopefully they're going to be
able to self-educate before these companies make it to these areas and introduce themselves
in pretty, you know, biased way. So hopefully it's not going to be only they're being able to,
you know, voice their concerns, but also be able to inform the final outcome of these projects.
It's not just about getting communities to rubber-stamp a project, but making sure they understand what a data center will mean for their future and being able to set certain conditions or stop it outright if it's clear that trade-offs don't make sense for them.
We'll see how that plays out in Chile, but other countries have taken further steps.
For some time, Singapore had a moratorium on data center construction, and Ireland temporarily halted it as well.
As I mentioned earlier, data centers have become such a political issue in that country that Breed proposed a bill in parliament to try to halt future.
data center construction, recognizing how significant of a cost they were already posing for Irish
society. We brought a bill before the parliament to ban any further development of data centers.
We call the bill the climate emergency measure bill because after the banking system collapsed
in 2009, 2010, the government here brought in what they call the financial emergency measure
bill and that allowed them to do out anything they wanted to hollow out the education system,
to hollow out the social welfare system, to cut workers pay, to cut pensions.
But because they called a financial emergency, they could do what they like.
So we took that and used it back against them and said, this is a climate emergency,
and this is a climate emergency measures bill,
because data centres and the proliferation of them is going to stop us reaching our target.
And we also linked it to the growth of the LNG industry, the liquefied natural gas industry.
It was voted down, but we did get 50 of our elected parliamentarians to vote with us, which was very good.
But it wasn't enough.
And we got a huge amount of campaigners to support us, which I think is really relevant because it's awareness-raising and it's setting the pace for the future.
Breed's framing of data centres through the lens of a climate emergency isn't wrong.
These data centres don't just use massive amounts of water in electricity.
At a certain scale, they start to make it more difficult for countries to hit their emissions.
targets, as Ireland is experiencing firsthand, but many other jurisdictions are grappling with that
too. In the United States, fossil fuel power generation isn't just being kept online in certain
states to power the data center boom, but a report in Bloomberg in September found the country
was actually planning new gas-fired generation at its fastest pace in years, in part to fuel the
growing power demands of data centers. And all for what? Sure, a certain number of data centers
are going to be necessary if we want to keep some of the digital services we've come to enjoy.
But how much computation and storage would that actually require?
And do those services even need to be as computationally intensive as they're currently designed?
The major tech companies would have us believe that if we don't support their data center binge,
the internet itself will have to disappear, along with everything we like about it.
But the truth isn't so black and white.
The specific model they've developed over the past several decades is inherently computationally and storage intensive.
That's the model of mass data collection to create profiles on us to target us with ads and recommendation
for content, purchases, and the like.
That isn't inherent to the internet.
It was a choice made by companies,
like those that now dominate the digital sphere
to commercialize their products and services
and make the massive profits they do today.
That's part of the reason they need increasingly massive facilities
crammed full of tens of thousands of servers and hard drives,
not because that scale of infrastructure
is truly essential for our online experience.
We can take another path,
but instead we're doubling down on this one.
The generative AI boom is entirely dependent
on that model of mass data creation and collection
and the centralized computation
that exists under the umbrella of the cloud giants.
Without it, the massive foundation models
that underpin chatbots like chat GPT or GROC
simply wouldn't be possible.
And maybe they shouldn't be.
If we collectively had a better understanding
of what's necessary for some of these technologies
and the actual power to have an input
on our technological future,
I think it's likely we'd choose a different path
than the one being foisted on us
by billionaires who increasingly live,
in a delusional world of their own making
when they're trying to force us
to bear the consequences of.
If the cloud is ethereal, there is no
problem with the cloud, but when you go
to meta and you see the territory,
the vultures, the eagles,
everything is going to disappear.
You think, okay, this is a problem.
We have to deconstruct this idea
of the cloud that the cloud
is not material.
The cloud is really physical.
The cloud is also our problem because we are part of the cloud.
Data Vampires is a special four-part series from Tech Won't Save Us, hosted by me, Paris Marks.
This original series was produced by Eric Wickham, and updates were made by our producer, Kyla Houston.
This series was made possible through the support from our listeners at patreon.com slash tech won't save us.
We've already uploaded the uncut interviews of some of the guests I spoke to for this series exclusively for Patreon supporters.
So make sure to go to patreon.com slash Tech Won't Save Us to support the show,
and make sure to order your copy of Hyperscale,
the ambition and excess of big text data empires.
You can find more information about that
at Hyperscalebook.com.